Endcap shielding senarios:

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Heavy Concrete Construction Formwork
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
ICRA Panel System Installation Instructions
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
The Lisa San Francisco Assembly Instruction By Laser Dollhouse Designs.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
2008 Cadillac CTS With Original Antenna
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Installation. Indoor Unit Installation Typical Installation.
LCLS-II Magnetic Structure Design Review - Conceptual Mechanical Design: Module Assembly Method Alan Black Steve Marks 7/6/11 1.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
Installation. Indoor Unit Installation Typical Installation.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Candela Display Systems 3x2 Interactive Video Wall System.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
BIKE TOOLS NEWS FOR YEAR REPAIR BIKE STAND  For home and professional use,  easy and quick mounting system,  rubber protected jaws to prevent.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
Welcome to KALLER International Distributors Meeting June 14-16, 2011 Workshop 7 Flange Strippers Hose-less Baseplate Hose systems.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
30’ Wireless Mast – Self Install
STEP 1: ASSEMBLE ANGLE PLATES
Baby-MIND Modules & Services
ProtoDUNE – DSS Installation, Alignment and QA
MICE Partial Return Yoke Mechanical Design
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
CPA Moment on the left is ~100*150kg/2.
ARISSat-1 Solar Panel Covers
DESIGNING & HANGING A PROFESSIONAL ART EXHIBITION
2.2 Gallon TourTank Installation
DESIGNING & HANGING A PROFESSIONAL ART EXHIBITION
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Assembly instructions for M-K all bolt together hoppercone kit.
Mounting a BalanceBox®650 to a brick wall
Additional Upstream Coil Shielding
Additional Upstream Coil Shielding
RPC SYSTEM LAYOUT and DIMENSIONS
Cryomodule Assembly Plan
Reader Swap out Guide.
Bunker Wall Design Wall ESS
Panel Riveting Dept. Adjustable Part Holding Fixture
BGC Collaboration Meeting –
Presentation transcript:

Endcap shielding senarios: YE1-2 Gap senarios – (Ref. Boki C vs Surkov 6) YE1 closed and YE2 opened 3.05m YE2-3 Gap senario – (Ref Boki E vs Surkov 2) YE1 open 3.74m YE2 open 3.84m and YE3 opened 7.64m YE3-4 Gap senario – (Variation of Surkov 3) YE1 and YE2 closed YE3 open 0.1m YE4 opened 3.8m. Note 1: YE3 and YE4 can be opened more if gap remains at 3.7m as long as YE4 is not opened more then 6.7m Note 2: Supporting outriggers with a 3.7m gap and no or minimal bracing to YE3 allows for cherry picker access and maximum crane coverage

ISO view of shielding assembly For guiding into position over beam- pipe Removable third leg for setting on the floor Linear slide for bottom lead plates

Step 1 - Drilling and taping of holes for shielding support Steps of installation Step 1 - Drilling and taping of holes for shielding support Note: This is done after the existing beam pipe is removed Will add a view to show drilling

Step 2 - Install permanent mounts Note: leaving the shielding mounting hardware on YE2 requires a small modification to the spacer disk shielding Will add a view to show permanent mounting features

Step 3 - Installation of the guides The guide post slides into base and is secured with a quick release pin. The guides should be installed for both the external and internal shielding assemblies Base Guide Weight is approximately 10 pounds (5 kg) Rated side force is approximately 310 lbs(140kg)

Step 4 - Adjust pick point on lifting beam Match the pitch of the shield to the pitch of the hall. Pick point slides to adjust Secures pick point to set position

Step 5 - Install and secure external half of shielding assembly ISO view of shielding before installation Note will show ropes/tethers for additional guidance

Step 5 - Continued Iso view of shielding in place.

Step 5 continued - Securing the shielding assembly End view of shielding in place showing cherry picker positions for securing shielding Bottom corner of cherry picker Additional fixtation will be located here

Step 6 - Close the bottom doors Doors must be closed before the second shielding assembly is installed Will show a end view with doors closed

Step 7 - Install and secure IP side of the shielding assembly Repeat steps 4-6 Will add a view showing the second half being installed

Removal Done in reverse order of assembly Note: If additional lead is added after installation, it must be removed to establish the original center of gravity. The pick point of the lifting beam must be returned to its original position for that assembly before removing that assembly

Adapter is required for mounting the to the front of the YE3 disk Adapter for mounting on YE3 Top mount point on YE2

Side view of shielding mounted in YE2-3 gap Will add view

T1 cables and flexible pipes will be pulled back to the external side of the YE4 inner disk The cables and flexible gas and water lines will be disconnected from the IP side of the YE4-outer so it can be moved with the YE4 wall. The cables and flexibles will be tied back on the external side so that they are not damaged when the shield is installed on the IP side? View of the external side of the YE-4 inner

Side view of shielding in YE3-4 gap Will add view

Strength of M20 fasteners 2xM20 Rx Ry Reacts against the 10mm step of the inner ring 2663 875 2750kg (6050lbs) FS=5.5 w/o 10mm step and nofriction Rx

Plan for testing the shielding assembly Will show shielding mounts being tested by hanging assembly on a fork lift.

Back up slides follow this page

Widest part if beam pipe is bracket for vacuum pump at 440mm

Cherry picker access to end cap gaps

Another ISO view

Side View of shield in place