Ness Bridge Construction

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Cofferdam.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
TED 316 – Structural Design
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
Technology Interactions ‹ Chapter Title Copyright © Glencoe/McGraw-Hill A Division of The McGraw-Hill Companies, Inc. Technology Interactions Designing.
Findings from On-site Inspection (Rt 202/US Rt 23 BRIDGE)
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Bridge Engineering (6) Superstructure – Concrete Bridges
SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012.
Chapter 34 Bridge Construction.
Mobile Defense Structures. Delta Works Consists of three barriers connecting the mainland to two artificial islands (Neeltje-Jans) in the Eastern Sheldt.
POWERPOINT PRESENTATION
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
Reconstruction of the Eads Bridge Highway Deck
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
Bridge Engineering (4) Foundations – Caisson Foundations 1. *Caisson foundations 1.1 IntroductionIntroduction A caisson is basically a structure.
The Millau viaduct is part of the new E11 expressway connecting Paris and Barcelona and features the highest bridge piers ever constructed. The tallest.
Bearings and Beam Ends Jeff Naum Maine DOT. Bridge Nomenclature.
Fiber-Reinforced Polymer (FRP)
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
THE GRAMERCY RESIDENCES CONSTRUCTION UPDATES Century Properties May 2009.
Oakland Jr. High – STEM Classes – Project Update and 3D Printing March 26, 2015.
By PARIKH KALPESH. Overview Introduction Structural evaluation of the bridge deck, girders, abutment, and piers Recommended non destructive tests Short.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
1. A simple beam bridge is a rigid horizontal structure supported by two ends called abutments. Beam bridges can span up to 500 meters in length. Most.
The Structure Behind Bridges
Chapter 2b Foundations Shallow & Deep Foundations.
By George C. Lee University at Buffalo
Other Construction Projects
Introduction to a pit installation
BRIDGES.
CAISSON FOUNDATION.
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
1 9 th Oct Design and Construction of Main & Crescent Bridges.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Outline of the Execution Manual for Seismic Retrofitting of Existing Pile Foundations with High Capacity Micropiles Masashi ITANI Takeshi OSHITA Seiichi.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
DIFFERENT TYPE OF BRIDGES
TYPES OF DEEP FOUNDATION
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
GROUND IMPROVEMENT TECHNIQUES
BULDING CONSTRUCTION ( )
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
Construction Methodology for Suramadu Main Bridge.
Constructed Type - tilting, steel, electrically operated. Position: three quarters of a mile east of Tyne Bridge, between Newcastle and.
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Required Drawings and Info for Formwork or Scaffold Design
The Seven Modern Wonders Of the World.
INTEGRAL BRIDGES Guided by: Dipu.V.S Lecturer Civil Engg Dept
Construction Examples in Japan High Capacity Micropile
Bridge modelling with CSI software.
B.V.Patel Institute of Technology-Diploma studies
Board of Commissioners Meeting
Kevin “Doc” Hoover Water’s Edge Hydrology, Inc.
14 High Leys Drive, Ravenshead, NG15 9HQ
Woodlane Timber, Hucknall
Technology and Engineering
Construction Engineering and Management National Central University
Concrete A structural material made by combining cement, sand, aggregate, and water.
Value of contract: Length of contract: Contract start date:
Successful Bridge Design
Narrows Bridge - Perth Concrete Repair Works
Protective surface finishes
Post Seismic Bridge Inspection
Presentation transcript:

Ness Bridge Construction 2049 – Inverness West Link Ness Bridge Construction

Ness Bridge

Ness Bridge in numbers: Overall length 176m (53m + 70m +53m) 4 supports – 2 abutments + 2 in-river piers Composite superstructure – 6 steel girders with concrete deck Steel beam height – variable 1.8 - 3.5m 3750m3 of concrete 1100t of structural steel 590t of rebar 28no. of bridge bearings Works Completion Date – October 2017

Ness Bridge – Temporary Works 2 working platforms – artificial islands in the river 2000 no. dumpy bags 6000t temporary fill 3 temporary bailey bridges – 12m, 15.5m, 22.5m 2 cofferdams – 12m & 15m deep 800m3 concrete to plug the excavation in cofferdams

Ness Bridge – Challenges Tight works programme for in-river works – 3.5 months only Variable and dynamically changing river flow values Extraordinary water surge from SSE Hydropower Plant Protection to environment during in-river works Maintenance of access to the river for third party users: anglers, kayakers, canoeists, walkers Invasive species mitigation measures in works area Superstructure installation

Ness Bridge – Superstructure Assembly and Installation Assembly on the ground – 3 months Installation on supports – 2 weeks Connections – 2 months Installation – 9 pairs of steel beams to be lifted: 190t @ 54.5m radius 140t @ 85.5m radius

Ness Bridge – Installation