EU Implementation Programme

Slides:



Advertisements
Similar presentations
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
Advertisements

European Developments Transmission Workgroup 5 th April 2012.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
European Gas Codes Update. Industry-wide seminar in conjunction with Ofgem and DECC  National Grid will be holding a workshop on 15th July on European.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
EU Developments Transmission Workgroup 6th October 2011.
European Developments Transmission Workgroup 1 March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
European Developments Transmission Workgroup 3 rd May 2012.
Gas Regional Initiative South South-East
EU Phase 3 Customer communications
29th November 2016 Teleconference
21st IG Meeting South Gas Regional Initiative
Senior Stakeholder Forum
EU Tariffs Code Update Based on Refined Draft as of 30th October
Proposer: Matthew Hatch Panel Date: 20/10/16
Enagás, GRTgaz, Reganosa, REN and TIGF
Capacity Conversion – 616s
43th IG Meeting South Gas Regional Initiative
Grid Code Development Forum – 6 September 2017
Grid Code Review Panel 16th August 2017
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Transmission Planning Code
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
Update on European Network Codes
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
18th July 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
24th January 2017 Teleconference
37th IG Meeting South Gas Regional Initiative
Proposer: National Grid NTS Panel Date: 17th April 2014
NTS Entry Charging Review Update
29th November 2016 Teleconference
26th February 2015 Teleconference
EUROPEAN TRANSPARENCY UPDATE
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Gas Regional Initiative South South-East
Proposed Transitional Gas Exit Arrangements
Proposer: Debbie Brace Panel Date: 20th March 2014
EU Codes: Implementation Issues
Information Provision for Transitional Exit Capacity
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
Capacity Access Review
Gas Regional Initiative South South-East
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

EU Implementation Programme

Engagement to date Dedicated NG workshops held to lay out the implications of the 3rd package and outline code concepts & developments. Led to: Ofgem/DECC EU Stakeholder Group Concept of a dedicated JESG type group was suggested. Consensus view was that Trans WG updates were sufficient. Standing agenda item since Nov 2011. 2

EU Updates to GB Stakeholders Regular updates are provided by NG NTS to GB stakeholders via DECC/OFGEM meetings, Transmission Workgroup Updates (monthly), Gas Forum, NG open meetings (adhoc), Bilateral meetings, etc. The updates have covered the following: Development of the European Framework Guidelines or Code National Grid Impact Assessments (IAs) – highlighting areas of change for GB regime Comitology Updates – highlighting changes made by the EC following discussion with member states Pre Modification Updates – providing further detail on the changes identified and/or how they maybe implemented Details on initial high level implementation roadmap are now being communicated Should we continue with the TX WG or create a EU WG?

Code Status Update Code Current Status Implementation date Congestion Management (CMP) Implemented 1st October 2013 (Fixed) Capacity Allocation Mechanism (CAM) CAM approved for EU Wide Implementation at relevant EU IPs 1st November 2015. 1 November 2015 (Fixed) Gas Balancing ACER approved the code on 20th March 2013 and comitology started in July 2013. Code approved by EC at the comitology meeting on the 2nd October. Oct 2015/Oct 2016 (subject to NRA approval for additional 12 months to implement) (Fixed) Interoperability ACER's Reasoned Opinion was published on 22nd November 2013. ENTSOG submitted a revised version of the Code to ACER on 18th December 2013. A ‘pre-comitology’ meeting for Member State representatives has been scheduled for 21st January 2014. Q4 2015 (Estimated) Tariffs Final FGs extended until Q4 2013 to allow more consideration of Cost Allocation methodology. ACER consultation on Cost Allocation methodology section of Tariff FG and Tariffs for Incremental Capacity closed 17th September . Publication of FG expected by 30th November. Estimated earliest mid January 2017 Incremental Capacity ACER consultation closed 17th September. Incremental Capacity expected to be introduced via combination of new articles in CAM Network Code and via Tariffs Network Code. TBC

Road Map Notes: 1) Short term UIOLI may not be required for NTS 2) Long term capacity auctions may need to be delivered in conjunction with short term auctions

Approach to UNC Modifications NTS has provided its initial views on the number and types of Mods required to deliver the phase 2 changes NG NTS believe that it is not appropriate to raise one “super” Mod, as this is likely to be very complex and delay matters – this view is supported by shippers Modifications will propose that they go to Workgroup for development/discussion with UNC parties and not straight to consultation Small proposals should take up to 6 months to develop Larger proposals could take around 6-9 months to develop

Phase 2 UNC Modifications Potential Timescales EU Network Code Area of change Panel Submission Workgroup Development UNC Consultation Balancing Information Provision Q1 - 2014 6 Months Q3 - 2014 SMP Buy & Sell Nomination Process at IP’s Q2 - 2014 6 - 9 Months Q4 -2014 CAM CAM / CMP Compliant Capacity Auctions Q4 - 2014 Gas Day (Mod 0461) Complete Closes 27th Jan 2014 Interoperability OBAs / allocations Interconnection Agreements/Contract Changes (facilitating Modification ) Q1 - 2015 Data Exchange