Status of the CERN chopper.

Slides:



Advertisements
Similar presentations
Mihai Albulet 윤석현. A class D amplifier is a switching-mode amplifier that uses two active device driven in a way that they are alternately switched ON.
Advertisements

EC 2208 – Electronic Circuits Lab 1
CHAPTER 3 MICROWAVE ‘O’ TYPE TUBES
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Progress of the BEPCII Injection System Kang Wen.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
Power Electronics and Drives (Version ) Dr. Zainal Salam, UTM-JB 1 Chapter 3 DC to DC CONVERTER (CHOPPER) General Buck converter Boost converter.
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Conventional Tubes Conventional Device tubes cannot be used for frequencies above 100MHz 1. Interelectrode capacitance 2. Lead Inductance effect 3. Transit.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael. A. Clarke-Gayther RAL / ASTeC.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
David Regidor, Moisés Weber (CIEMAT, Madrid, Spain) The IFMIF-EVEDA Accelerator Prototype will be a 9MeV, 125mA CW deuteron accelerator to validate the.
CommunicationElectronics Principles & Applications Third Edition Chapter 6 Radio Transmitters ©2001 Glencoe/McGraw-Hill Louis E. Frenzel.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
RF Sources and Combiners Emma Wooldridge. 28th-29th April 2004Joint Accelerator Workshop Outline Very quick RF power overview RF power sources –Triodes.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Midterm 2 performance Full points is 48. Average is
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
1 EuroTeV High Bandwidth Wall Current Monitor Alessandro D’Elia CERN- Geneve.
Microwave Devices.
An Inductive Pick-Up (IPU) for Beam Position and Current Measurement
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
29/04/03 F. Caspers (CERN):Chopper development evolution IPHI-SPL meeting April   Brief review of present status   Why to consider an alternative.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
Fast Grid Pulse Modulation
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Tao Tang, Craig Burkhart
Power Supply Design Howie Pfeffer Mu2e Extinction Technical Design Review 2 November 2015.
RF System for Bunch Rotation C. Ohmori ( KEK). Contents PRISM RF –Introductions –Present status –RF for 6 cell ring –Upgrade plan High Duty RF system.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
The Working Theory of an RC Coupled Amplifier in Electronics.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Presentation CERN SPAIN | ITALY | FRANCE | GERMANY | MEXICO | USA | BRAZIL | UAE | QATAR | OMAN | SAUDI ARABIA jema.es.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
CERN LHC RF Power Systems
Full Wave Rectifier NavigationTutorial: 6 of 8 The Full Wave Rectifier In the previous Power Diodes tutorial we discussed ways of reducing the ripple or.
DOUBLE INPUT Z-SOURCE DC-DC CONVERTER
EUROTeV Diagnostics WP5
Amplifier: An amplifier is an electronic device that increases voltage, current or power of a signal. According to the class of operation, the amplifiers.
RF Sources and Combiners
Visit for more Learning Resources
Development of a Marx-Generator for the drive beam electron gun
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
Physics design on Injector-1 RFQ
DC-DC PWM Converters Lecture Note 5.
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
High Efficiency X-band Klystron Design Study
IFMIF-EVEDA RF POWER SYSTEM
POWER AMPLIFIERS.
Bunch Separation with RF Deflectors
Electronics: Demod + 4Q FE
Superbeams with SPL at CERN
Electronics: Demod + 4Q FE
Klystron Power Supplies for ILC
CEPC RF Power Sources System
UNIT-8 INVERTERS 11/27/2018.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
The SPL-based Proton Driver at CERN
Kicker specifications for Damping Rings
INVERTERS. What is an Inverter? A static device that converts DC power into AC power at desired output voltage and frequency is called an Inverter. Applications.
Presentation transcript:

Status of the CERN chopper. Problem review The deflector status The old driving solution An alternative scheme The basic amplifier module 2 and 4 ways combiners The solid state driver Measurements in 500V mode Measurements in +/- 250V mode Final design Conclusion

2 ns fronts require cutting no lower than 175 MHz. Problem review (1) The RFQ operated at 352 MHz ► 2.84 ns bunch spacing, 1 ns RMS bunch length ► 2 ns available for rise/fall time 2 ns fronts require cutting no lower than 175 MHz. To overcome kicker filling time problem ► 50 W traveling wave deflector ► b=v/c~8% to match beam velocity To get the minimum extraction field ► +/- 500V on the two deflector plates (1kV differential) ► 5 kW pulsed power per plate

Problem review(2) For the neutrino factory beam ► Dump 3 bunches out of 8 ► 0.6 ms / 50Hz burst of 8.52 ns / 44 MHz pulses For the PSB beam ► Dump up to 133 bunches out of 355 ► 0.4 ms / 2 Hz burst of 380 ns / 990 kHz pulses With a first order high pass response cutting at 7 Hz the baseline will be displaced by 1% at the end of the burst for the first case; 11 Hz would be enough for the second case.

The deflector status (1) ► Due to amplifier changes system modified for coaxial connections instead of tri-axial. ► All mechanical parts for the deflectors available. ► 1st deflector tests expected for beginning of November.

The deflector status (2) ► Meander lines production went through various stages to achieve reasonable performances. ► Thick film technology was used with good results in previous projects (AA and AD). ► Due to the high current for the chopper, need to enhance thickness of silver layer but printed and thick film not compatible with electrochemical deposition! ► Adoption of different process: chemically etched pattern on fired molymangan followed by silver layer deposition. Intermediate Ti layer instead of Nickel (magnetic) not as solid but acceptable after firing at 800 °C under protective gas. ► Meander lines characteristics considered as reasonable but due to the many process steps production yield poor and conductivity at limit. ► 1st deflector equipped with meander lines manufactured at CERN.

The deflector status (3) ► In parallel contacted industry to find a possible alternative solution. ►Japanese company KYOCERA produced 10 cm samples with good performance: - DC resistance down by ~50%, - improved bonding - Comparable prize Active metallization For the 2nd structure the choice of meander lines manufacturer will depend on 1st deflector results. Cu plating (30mm) Ag plating (3mm)

The old driving solution (1)

The old driving solution (2)

The old driving solution (3) Analysis and measurements shown that: ► Output voltage limited by tube performance below expectations. ► Slow tails due to ferrite saturation in the wideband transformers extremely difficult to avoid or compensate. ► Matching and stability of transition times, timing and output amplitude of the LF and HF amplifier difficult to maintain on long term for proper operation.

An alternative scheme (1) DC component self compensates over two cycles ! But how can we make an inverter with an high frequency cut-off compatible with the 2 ns required fronts and a low frequency cut-off such that the droop is negligible?

An alternative scheme (2) Hybrid coupler with theoretically infinite high frequency cut-off. Udo Barabas, “On an Ultrabroad-Band Hybrid Tee”,IEEE Transactions on microwave theory and thecniques, vol.MTT-27, no.1, January 1979

An alternative scheme 3) Operate each amplifier with 352/16=22 MHz but one shifted by half cycle with respect to the other and modulate the duty-cycle from 18% to 50% according to the number of bunches that have to be ejected (pulse length varying from 8.52 ns to 22.72 ns). With low frequency cutoff set at 140 kHz the baseline displacement is limited to 2%. 3 out of 8 bunches ejected. All beam ejected

The basic amplifier module (125V on 25W) Very low frequency simplified equivalent circuit

2 and 4 ways combiners

Solid state driver : 250V, 50W module

Solid state driver : 4 Way 50W Hybrid

Solid state driver : 500V or +/- 250V, 50W amplifier

Measurements in 500V mode

Measurements in +/-250V mode (1)

Measurements in +/-250V mode (2)

Final design (1) New mosfets increase the basic module output from 125V to 150V. New commercial gate driver improves switching time despite the higher capacitance of new mosfets. Strip-line to coaxial transitions have been minimized for a better high frequency response.

Final design (2) Full hybrids chain tested in splitting mode rather than sum mode. Tests suggest that full scale amplifier will achieve the specified output voltage and transition times while keeping ripple within ±3%.

Conclusions The 1st unit of the CERN chopper deflector is now being assembled. It uses CERN made meander lines. If required , improved industry made, meander lines might be used in the 2nd unit. A new scheme has been identified for the CERN chopper driver operation. It allows to relax the required amplifier low frequency response and the use of a single, solid-state amplifier based on identical modules. A half scale prototype proved the principle and provided information for the final version design. A final version basic amplifier module has been produced and tests suggest that the full version will satisfy all requirements. Modules for a half scale test are now in production and test are expected before the end of the year. A full scale amplifier will be produced in spring 2006.