Philip Augustin TSS Chair

Slides:



Advertisements
Similar presentations
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
Advertisements

WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Presented to PGDTF February 11, 2015
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Rocky Mountain Region PA/PC Meeting March 18-19, 2014 Denver, Colorado.
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Kenneth Silver Los Angeles Department of Water & Power
Western Electricity Coordinating Council
Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Jonathan Young ColumbiaGrid
Reliability Assessment Committee Proposal TSS Meeting
WECC Regional Standards Update
Path Operator Implementation Task Force
CIIMS Proposal for TOP-003 Approach
Eleanor Ewry Base Case Coordination Subgroup Chair
Nick Hatton Associate Engineer March 9, 2017
Western Electricity Coordinating Council
Kenneth Silver Los Angeles Department of Water & Power
Merrill Brimhall – Engineer, Staff
Transition Plan for Removing Wind Phase 1 Generic Models
Reliability Assessment Committee Reliability Workshop Priorities
GMD Data Request NERC Rules of Procedure Section 1600
Jonathan young ColumbiaGrid
Workshop Session 1: Overview
ADS and WPR Seed Case Background
Planning Coordinator Gap Update March 25, 2014
Andrew Christensen, SDWG Chair
Workshop Session 1: Overview
NERC Reliability Standards Development Plan
Joe Seabrook Puget Sound Energy, Inc.
System Review Work Group
Jonathan Young SDWG Chair
Reliability Assessment Committee Reliability Workshop Priorities
Andrew Christensen, SRWG Chair
SRWG Chair Report March 2015 WECC HQ
ADS and WPR Seed Case Background
Tracy Rolstad TSS Chair
Transition Plan for Removing Wind Phase 1 Generic Models
Palo Verde-COI RAS Retirement
NERC Reliability Standards Development Plan
Jonathan Young SDWG Chair
Andrew Christensen, SRWG Chair
Palo Verde-COI RAS Retirement
System Review Work Group Update to TSS
System Review Work Group Update to TSS
Jonathan Young ColumbiaGrid
Standards Development Process
Joe Seabrook Puget Sound Energy, Inc.
Jonathan Young ColumbiaGrid
Presentation transcript:

Philip Augustin TSS Chair TSS Chair Report Philip Augustin TSS Chair Western Electricity Coordinating Council

Western Electricity Coordinating Council Overview TSS Activities Update on Action Items From October PCC Session Short Circuit Data Collection Joint User Group (JUG) White Paper the Purpose of WECC basecases System Review Work Group (SRWG) Modal Validation Work Group Approval Item: Guidance paper prepared by WECC REMTF Project Coordination/Review Project Rating Status Annual Study Program (Approval Item) System Model Validation MOD-033 BCCS Alternative Geomagnetic Disturbance Study Update TSS Modeling Data Security Western Electricity Coordinating Council

Action Items from March PCC Send replog items notification(s) to PCC/TSS represenatives. Update Assembled a task force to work out details for sending notifications. Task Force is Considering: New fields have been added to the replog which currently dominates the count of log items Improvements have been made to search criteria for every field. The replog is provided with the review cases. References to the NERC standards have been removed from the replog Western Electricity Coordinating Council

Action Items from March PCC Take the list of problematic models from the UFLS Assessment Report to the MVWG for review and provide a response. Update MVWG/PPMVDTF has received the cases that the UFLS Review Group (UFLSRG) used for the study Plan is to create a list of model issues and suspected errors. The list of data errors will be provided to SRWG to be addressed. Western Electricity Coordinating Council

Action Items from March PCC Direct the SRWG to review the possibility of moving the 10-Year Heavy Summer case earlier in the schedule so it is finalized 10 years out instead of 9. Update: SRWG has received the survey responses on the 2017 basecase compilation schedule and they will be reviewed and considered. SRWG will provide a response at their next meeting Western Electricity Coordinating Council

Action Items from March PCC Review and update the Area Coordinator and Sub-Area Coordinator definitions and references in the Data Preparation Manual and Base Case Compilation Schedule. Update SRWG will remove references to Area Coordinator from the documents. Develop a scope, methodology and process to gather and store short circuit data for a WECC-Wide database and report on that process development and the schedule for implementation. Western Electricity Coordinating Council

Short Circuit Data Collection Option 1. Provide data in a format that would allow sequence data to be included in the planning/operating base cases. Pro’s Con’s Transmission Planning uses this process/program Not tested for interoperability with other software packages (i.e. not a SCD program). Might not be useful for SCD programs Need to verify import and export is comparable to other software Format version has to be determined Bases cases would require additional buses to define 3-winding transformers and/or generator sequence data Western Electricity Coordinating Council

Short Circuit Data Collection Option 2. Maintain a protection “case” in an interconnection wide sequence data base in a “universal format.” Separate from planning cases, but available to all the functional roles. Pro’s Con’s No added cost associated with purchasing new software. Software vendors to export and import “universal format”. Or Spend internal resources to write in-house scripts/programs to import and export Documentation and interoperability are prioritized Might not be so easy to convert into all the software programs Need for program verification with available software. Western Electricity Coordinating Council

Short Circuit Data Collection Option 3 Build the “protection” data base in either ASPEN or CAPE sequence data base format. Pro’s Con’s Relatively less work for System Protection Majority of WECC’s System Protection are ASPEN users so cost is less for majority ASPEN’s DXT portability needs so be tested Accurately defined sequence data (CAPE) Western Electricity Coordinating Council

Short Circuit Data Collection TSS Scope Improve power flow and dynamic models and data (SRWG and MVWG) Modeling Remedial Action Schemes Improved mapping between planning models and the WSM (WBRTF) Software improvements and addressing compatibility issues (JUG) Western Electricity Coordinating Council

Short Circuit Data Collection Recommendation: Send out poll to find out how many WECC members are users of each available software Still to be determined: Which group is the best fit to work out the seems issues Western Electricity Coordinating Council

Western Electricity Coordinating Council JUG Action Items Western Electricity Coordinating Council

White Paper: Purpose of the Basecases TSS Formed a task force to develop a short summary narrative on the “purpose of base cases” to be included within the basecase compilation schedule for future approval: Due high turnover at SRWG this has been expanded into its own document. The paper is intended to help new data submitters understand what needs to be submitted: Discussion on the purpose of the basecases, Detail to be submitted during the basecase development process (with some tips and tricks) How the basecases are intended to be used. Group is looking for feedback on: The modeling of planned outages and planned projects, Modeling of load levels, the differences between the operating cases and planning cases, and any additional topics that should be included in the white paper Western Electricity Coordinating Council

System Review Work Group (SRWG) 2016 Base Case Compilation Schedule Updates: SRWG has received the survey responses on the 2017 basecase compilation schedule and they will be reviewed and considered. TSS discussed PCC’s suggestion to move up the 10 year summer case and SRWG will respond. SRWG will also discuss combining the timeline for heavy and light cases that start from the same topology. Western Electricity Coordinating Council

System Review Work Group (SRWG) Annual update of the Data Preparation Manual (DPM) Changes proposed to be in the next version of the DPM include: Explicitly model bypassed elements Disallow “multi-section lines” Require bus type field Minimize multiple SVD on buses Populate Substations record Populate Balancing Authority Area Remove the term Area Coordinator Western Electricity Coordinating Council

SRWG Representation Log Data Improvements Status update: Added turbine type and gen on BES bus to replog New case check implemented in the spreadsheet mimics PPMVTF checks Huge spike in total counts due to added search for Missing Turbine Type ~2000 Future changes, remove all NERC standard references, No subtotals for standard/non-standard Mapping the generators between the WSM and Planning Cases Western Electricity Coordinating Council

Modeling and Validation Work Group (MVWG) TSS approved the white paper “Value and Limitations of the Positive Sequence Generic Models of Renewable Energy Systems.” Provides a brief discussion of the recently developed second generation renewable energy system models, what they were developed for, and the limitations in their applicability Approval Item Western Electricity Coordinating Council

Modeling and Validation Work Group (MVWG) System Model Validation Task Force (SMVTF) was created to report to MVWG. The SMVTF Charter has been approved by MVWG. This task force is intended to continue system model validation work. Provide a more formal process to develop and distribute disturbance cases, which can be leveraged by PCs to use for their own MOD-033 compliance. Western Electricity Coordinating Council

Modeling and Validation Work Group (MVWG) Plant Model Validation and Data Task Force (PPMVDTF) Is compiling a list of suspected baseload flag errors and will provide it to SRWG Reviewing the generators identified in the UFLS Report Western Electricity Coordinating Council

Modeling and Validation Work Group (MVWG) HVDC task force will help determine whether the Transbay HVDC line can be modeled by the generic VSC HVDC model. Conventional HVDC point-to-point dynamic model specifications have been sent to software vendors for implementation. This model will be used by BPA for the upgraded Pacific DC Intertie (PDCI) HVDC lines. The interface for the Voltage Source Converter (VSC) HVDC point-to-point model between power flow and dynamics is still being discussed. Western Electricity Coordinating Council

Modeling and Validation Work Group (MVWG) Other Activities: A common format is needed for transient RAS modeling. GE has implemented the steady state RAS modeling in PSLF. There is little interest within MVWG on additional relay modeling. The WECC Approved Dynamic Model List is being cleaned up by software vendors. Comments and filling in the blanks Updating categories to include: never approved un-approved Western Electricity Coordinating Council

Modeling and Validation Work Group (MVWG) Two 1 ½ day Workshops in 2016: San Diego CA in March (Coincidences with MVWG meeting) Portland OR in August. A half day each on: load modeling renewable energy modeling (including energy storage) generator modeling and validation MVWG is also planning a MOD-033 workshop as part of the June MVWG meeting. Western Electricity Coordinating Council

Western Electricity Coordinating Council Project Coordination The active three phase rating log is available on the WECC website. Search on WECC website for “Path Rating Logbook Active” https://www.wecc.biz/Reliability/Path-Rating-logbook-active.docx TSS members have been asked to review the Path Rating Process Logbook to make sure all projects are listed and that the information is up to date. Western Electricity Coordinating Council

Annual Study Program Report The WECC Annual Study Program is conducted to: Provide high-quality base cases for WECC member and WECC staff use, and to provide an ongoing reliability and risk assessment of the Western Interconnection electric system Assess interconnected system security under anticipated stressed conditions and scenario conditions Provide five operating cases (heavy and light loading conditions for summer and winter, and heavy loading conditions for spring) for the upcoming year. Review and perform general verification of system representation No special studies were requested by the PCC, OC, or the TSS. Approval Item Western Electricity Coordinating Council

System Model Validation MOD-033 WECC develops disturbance cases using WSM data. MOD-033 applies to PCs and does not apply to WECC (ERO). PCs can perform system model validation for MOD-033. WECC disturbance cases are available on the Peak Reliability website for entities that have signed the Universal Non-Disclosure Agreement (UNDA). Western Electricity Coordinating Council

Western Electricity Coordinating Council BCCS Alternative BCCS Alternative Task Force (BATF) to clarify the objectives of the project and to develop a plan to achieve those objectives. The Charter proposes a path to move forward. Capture Lessons Learned. Review and identify the objectives of the original BCCS. Create clear, SMART (Specific, Meaningful, Action Oriented, Realistic, Timely) objectives that are relevant to today’s modeling issues. Develop a vision of the completed project that prioritizes objectives into small, obtainable, independently useful milestones that can be implemented. Recommend levels of involvement for WECC members and WECC staff for each objective. A draft report of the task force’s findings and recommendations will be presented to the SRWG at its June 2016 meeting. WECC will discuss with NERC and FERC about the delay in delivering a BCCS by summer 2016, as was included in the Southwest Outage settlement. Western Electricity Coordinating Council

Geomagnetic Disturbance/ Geomagnetically Induced Current 2016 Timeline Established for Data Submittal: January 31 – any data that is ready and available through the spreadsheet April 30 – all transmission line data, substation names , substation numbers, buses correlated to substations July 31 – all shunt information October 31 – all transformer information excluding core information December 31 – all remaining data requested in the spreadsheet including: transformer core information, substation latitude and longitude, and substation ground resistance Western Electricity Coordinating Council

Western Electricity Coordinating Council GMD/GIC Advisory Team Consultant Presentation on: Geomagnetic Disturbance Vulnerability Assessment Case Study. example showing the scope, assumptions, transmission system model, analysis methodology, results and relevance to NERC Standard compliance, and recommendations. TSS voted to write a RFI in order to hire a contractor to do a WECC wide study Western Electricity Coordinating Council

TSS Modeling Data Security Per the WECC settlement agreement all RAS is required to be modeled for all WECC cases by July of 2016 The DPM requires RAS models be provided beginning in July of 2016 TSS & SRWG discussed a need to have tighter security for RAS modeling data, and the modeling parameters required for GIC data. SRWG emphasized that all modeling data (e.g. steady state, dynamics, contingencies, RAS, GIC) should be stored in one place. TSS created a task force to develop a proposal on how much security is required for RAS modeling data and GIC data, and then submit the proposal to WECC. Western Electricity Coordinating Council

GIC and RAS Security Task Force Data Security Proposal: RAS models will be posted on the WECC website and available for use: Powerflow software development Base case development Accessible only to those with access to the NDA protected data The data is to reside in separate zip folders located in the same directory as basecases with conforming naming convention for easy searching The data folders will be visible to only the following Registered entities: Planning Coordinator (PC) Transmission Planners (TP) Staff of Sub-Regional Planning Entities Western Electricity Coordinating Council

Western Electricity Coordinating Council Questions Western Electricity Coordinating Council