Environmental Test Planning

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
Advertisements

GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
Gayle K. Martin November 14, 2016
SPP FIELDS V1234 Thermal PSR
GLAST Large Area Telescope:
Mechanical Integration
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST LAT Acoustic Vibration Test Readiness Review
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST LAT System Engineering
LAT Pre-Environmental Test Plan
Thermal Vacuum Test: Plans and Procedures
Design Integration and Analysis
GLAST Large Area Telescope
Integration and Test Organization Chart
Mechanical/Thermal Systems
Environmental Test Planning Meeting
LAT Environmental Test Planning and Design Review
Introduction and Overview
Design Integration and Analysis
LAT Environmental Test Pathfinder F2F NRL-SLAC Networking Update
GLAST Large Area Telescope: Deputy for Systems Engineering
GLAST Large Area Telescope:
Presentation transcript:

Environmental Test Planning LAT Face-to-Face Manager’s Meeting 15 June 2005 Environmental Test Planning Martin Nordby Neil Johnson

Environmental Test Planning LAT-MD-02717, “Environmental Test Sequence” Been in the release cycle since early May Updated LAT performance test info to match Per. and Ops Test Plan per Rich Baun Every LAT perf test given a name, to correlate with P&O Test Plan Changed NRL incoming test from CPT to LPT Release put on hold until CPT/LPT test disagreement is resolved Being worked in P&O Test Planning meeting Baseline Ship to NRL Rev date: 8 June 2005 C F S at SLAC Receive, Unpack Sine Vibe Mount Radiators EMI/EMC Acoustic L T L L L L CS/CE L RS/RE L L L Pre Post-Axis Pre-TV T-Bal T-Cycle Final Remove Radiators Weight CG Pack LAT Ship to Spectrum C S L S L C C S L Limited Performance Test Comprehensive Performance Test SVAC Test C S F T E Full LAT Functional and FSW Test TCS Functional Test EMI/EMC Emissions/Susceptibility Test Note: electrical tests with the same label are not necessarily identical tests

Test Plan Status LAT-SS-00895, “LAT Instrument Survey Plan” Released and in-use at SLAC May need revising to include any changes to plans for surveying at NRL LAT-MD-01196, “LAT Dynamics Test Plan Finalized accel placement on TKR Ready to go, but need to go through one final clean-up pass Updated draft ECD: 6/24 LAT-MD-00276, “LAT EMI/EMC Test Plan” No new info on updating EMI/EMC requirements  Michael Lovellette working on tracking down Fred Blanchette to move this forward Updated draft ECD: 6/24 (without changes to test levels) LAT-MD-01600, “LAT Thermal-Vacuum Test Plan Updated test timeline Moved bake-out to end of test Defined test names for all LAT performance tests (e.g.: “Cold-TB LPT”) to correlate with Perf. And Ops. Test Plan Started final update of plan Updating MGSE/STE requirements based on new baseline thermal control plans

Current T-Vac Test Timeline (to be baselined in T-Vac Test Plan)

MGSE Development Test Interface Plate This supports the LAT for all post-integration ops (shipping, env testing), as well as Grid2 for static load testing Requirements and interfaces finalized Structural analysis is complete Part drawings in release cycle RFP is on its way to Purchasing Assembly drawing, including assembly procedure is in review prior to release cycle Transport Container Being built as a turn-key design/build/test contract Still looking at re-using an old NRL container, if we can get analysis and test data on it Source control drawing and statement of work are at start of release cycle (waiting for Natalie) RFP in Purchasing at SLAC Test Stand Used for supporting LAT during moves at NRL, acoustic, EMI, and T-Vac tests Requirements largely understood; interfaces for T-Vac and T-Vac STE still open until that design matures Structural analysis started; expect completion by 6/22 Design being updated to add features and details Need date is late June—this is getting critical to support Pathfinder in late September Drawing ECD: unknown

MGSE Development (cont.) T-Vac Thermal STE Sink plate and heater cages for thermally controlling LAT during T-Vac Thermal and electrical design requirements have just been finalized Interfaces and design concepts not well understood yet, since the mechanical requirements are not well-understood Active design work on this has not yet started  now that the thermal requirements have stabilized, we will get a designer going on this Drawing ECD: This is not a schedule driver Remaining MGSE/STE hardware design has generally not yet started: none are schedule drivers, all are relative small and discrete, and all are being used as fill-in work SC Top Deck acoustic simulator—not started Radiator SC Strut simulator—waiting on SC strut design info Spreader Bars—design started Test MLI blankets—waiting completion of flight blanket design

EGSE Development and Networking T-Vac cabling Cable pin-outs and schematics have been finalized Feedthroughs have been ordered Internal cable routing/lengths being finalized now Internal cable drawings have been started (ECD: ) External cable drawings not yet started (ECD: ) EMI cabling Cable routing is waiting on EMI cell layout drawing completion This cabling will also be used for acoustic, sine vibe, and high-bay testing Mobile Computing Rack Final architecture not yet worked out—needed at SLAC before LAT CPT ~Nov Many parts not purchased yet—firewall and router ordered, with ETA in early November Issue is priority with other work Networking Env testing at NRL No MOU paper yet from NRL  need pressure applied to keep this moving Observatory I&T at Spectrum Network planning just starting Lots of details to work, but need a contact at Spectrum to work with (Brian is working this)

Facilities, Operations, and Logistics NRL facility drawing status Sine vibe table LAT-DS-5905-01 complete 4/20/2005 (rev in progress) Slip table LAT-DS-5903-01 complete 5/2/2005 Expander head LAT-DS-5904-02 complete4/25/2005 High-bay tent LAT-DS-5899-01 complete 4/20/2005 Vibe facility LAT-DS-5902-01 in release cycle at NRL Acoustic facility LAT-DS-5906-01 in release cycle at NRL T-Vac facility LAT-DS-5907-01 complete 4/20/2005 (rev in progress) EMI facility LAT-DS-xxxxx ECD: 6/21/2005 A-59 west high-bay LAT-DS-xxxxx ECD: 7/15/2005 Key issues being worked at NRL (Bill Raynor) Trestle bridge load certification T-Vac trolley retrofit/load test—waiting LAT footprint from SLAC How to move LAT into and out of T-Vac chamber

Observatory I&T Planning LAT-MD-06560, “Plan for Integrating and Testing the LAT on the Observatory” Significantly redlined at Spectrum in late May Redlines being incorporated into an updated draft Once this is finalized, LAT will release it and Spectrum will add it to a new appendix of the ICD Intent is to capture all issues regarding Obs I&T that either affect us or that we have requirements for