LINAC4 50 MeV phase BIS STATUS

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
L4T Bending Power Converters: ‘ Implications of monitoring the current to 5% and 0.5%’ L4 BCC - 10 Nov 2011 David Nisbet TEEPC.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
LLRF FOR CHOPPER Grégoire Hagmann Philippe Baudrenghien BE/RF/FB February 24th, 2013.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
BLM “sunglasses” Filter Box. Current layout: BLM crates CIBU units Rack BY02 / SR8 BIC crate ( UA83 ) User_Permits Maskable channel Unmaskable channel.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
CERN Andrea Apollonio page 1 MACHINE PROTECTION CONSIDERATIONS FOR 50 MeV LINAC4 BIS COMMISSIONING A.Apollonio, B. Mikulec, C. Martin, B. Puccio, F. Roncarolo,
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ BIS: Beam Interlock.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
0v1.
The TV Beam Observation system - BTV
Beam Interlock System SPS CIBU Connection Review
DRY RUNS 2015 Status and program of the Dry Runs in 2015
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Overview of the Beam Interlock System
Online check lists Half Sector Test
Injectors BLM system: PS Ring installation at EYETS
RF interlocks for higher intensities (LMC 15 June)
EC Activities Status for the LIU
BE-BI Software for LINAC4
Jan Uythoven For discussion
ATLAS-AFP interlock validation
J. Uythoven for the MPE-MI & MS Teams
1v0.
352MHz Klystron Control for the 3MeV Linac test stand
SPS CC: Final plan for interlocking of crab cavities in SPS
XFEL Vacuum System Commissioning
Safe mode transmission
Commissioning and Testing the LHC Beam Interlock System
EP Experiments safety validation process Safety Permits
Linac 4 Devices Controls and Monitoring Status
MPSC Procedures An update
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Interlocking of CNGS (and other high intensity beams) at the SPS
Beam Dump and Injection Inhibits
Machine Protection System Commissioning plans
1v1.
BCM-BIS Interface Szandra Kövecses
Beam Interlocks for Detectors and Movable Devices
MPS commissioning at ESS
The LHC Beam Interlock System
Machine Protection PLC Based System Verification and Validation Plan
Lessons from the 1st Safety Readiness Review
Radiation Working Group RADWG
SPS Injection BIS - Draft requirements
Presentation transcript:

LINAC4 50 MeV phase BIS STATUS - Linac4 50 MeV BIS architecture - Current situation with the different users - Commissioning plan

- Linac4 50 MeV BIS architecture - Current situation with the different users - Commissioning plan

LINAC4 BIS Final implantation

LINAC4 BIS : 50 MeV

- Linac4 50 MeV BIS architecture - Current situation with the different users - Commissioning plan

Master BIC RF : the new functionality Following a request from the “RF Source team”, a new CIBU named « Source Start » has been added on a free input of the “Master BIC RF ”. During the Source start-up the nominal conditions are very different from those during standard operation; the Beam Stopper is “IN” and the Beam Permit delivered to the source must stay “TRUE”. Thanks to this new input, a third equation has been added to this “Master BIC RF”. Final Master BIC RF implementation Note: When the “Source Start” gives User Permit = “TRUE”, the protection of the source will then be under the responsibility of the source team

Master BIC RF for 50MeV : the real situation Not Ready (mask inside the user’s PLC) Not Ready before 2016 Commissioning Dump

Master BIC Chopper : the new functionality Following an issue with the measurement in the faraday cup during the 12 MeV phase, two new CIBUs have been added on 2 free inputs of the “Master BIC Chopper”. The new User permits are “Beam Stopper Out/Moving” and “Beam Stopper IN” (same interlock logic as signals connected to the “Master RF BIC”). Adding the Beam Stopper inputs is required to force the Beam Permit delivered to the Pre-Chopper to be “TRUE” when the Beam Stopper is “IN” position. A new equation has been added to this “Master RF BIC”. Final Master BIC Chopper implementation

Master BIC Chopper : the real situation Only the 2 first out of the 4 destinations are required for the 50MeV phase: Beam to stopper Beam to Dump Inputs not required for the 50 MeV phase; permits are forced to the required level in order to allow decoding the second destination “Beam to Dump” Forced to “TRUE” Forced to “TRUE” Forced to “FALSE” not considered (destination LBE & PSB)

Slave BIC L4 : the real situation Forced to “TRUE”, not required for the 50 MeV Forced to “TRUE”, not required for the 50 MeV L4 RF moved on “Maskable” input for 50 MeV commissioning phase ( as for 12 MeV) Note: for this phase, the system “Diamond Detector” will no be anymore connected to the BIS

WORKING DOCUMENTS

- Linac4 50 MeV BIS architecture - Current situation with the different users - Commissioning plan

The 3 elements of the BIS architecture

L4 BIS IST (Individual System Tests) The BIS IST are performed by the BIS experts; These tests include: The connection between the CIBU and the BIC The Beam Interlock Controller behavior The reception of the Beam Permit at the CIBIR level Note : these tests do not involve neither the User Systems nor the Target Systems; nevertheless the CIBIR module should be powered on.

L4 CIBU & CIBIR hardware commissioning tests The BIS hardware commissioning tests (CIBU & CIBIR) are performed by the BIS experts and the involve person of either the User System or the Target System. These tests check the electrical connections between the User electronics and the BIS interfaces and also the redundancy of the two User Permits & Beam Permits The test procedure is explained in the document “CIBU COMMISSIONING STEPS” EDMS 1400288 In each case, a test report is generated and archived by the Beam Interlock team REMINDER : if the user system electronics has been modified, the interlock team should be always informed in order to take the relevant actions (with a partial or full recommissioning)

BIS commissioning of the full interlock chain Some tests to validate the full interlock chain are outside the scope of the BIS responsibility: The related interlock logic is under the responsibility of the User System and is not checked during the BIS commissioning. The action resulting from the 2 redundant Beam Permits level is outside of TE/MPE responsibility. From the BIS side we only guarantee the availability of these signals. Note: the past issue with the Diamond detector during the 12 MeV phase was due to 2 bypasses of the Beam Permit signals: 1 in the Pre-Chopper and 1 in the Chopper !

MPP Linkman Mandate …The role of the machine protection linkman is to be a central point of contact for all interlocks (WIC, BIS, SIS) and the associated interfaces to client systems. The linkman will have at all times an understanding of the present and future interlock status of the machine… MPP Linkman for LINAC4 David Nisbet Actions Ensure all required BIS client inputs are defined and documented. Define functional tests for each user input (if not already existing). Make the SIS operational for 50MeV.

Schedule Connection of the new “Source Start” CIBU to the BIS and programing the new equation in the Master BIC “Source RF” (done) CIBU recommissioning (foreseen 12/10 to 16/10) Target System recommissioning (foreseen 19/10 to 21/10)

Conclusion There is no show stoppers to install the BIS for the 50 MeV phase A schedule is proposed to both User Systems and Target Systems to performed the recommissioning before 22 October A clear procedure for testing the whole interlock chain has to be defined