Merging DT1 + DT2 FH / 19.02.08.

Slides:



Advertisements
Similar presentations
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Advertisements

Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
Joint Meeting ATLAS-CERN Detector Group / PH-Detector Technology Group Overview of the PH-DT group: Group Structure Current Projects Services White Paper.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CERN HR Department Strategy, Management and Development DT2 News Summer Students Presentations: Henrik Friis Dam 'Characterization of Scintillating Fibres.
DT News The Insertable B-layer (IBL) project for the ATLAS Upgrade Raphael Vuillermet, François-Xavier Nuiry and Christophe Bault DT Science-Techno Tea.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
DT Science-techno tea DT news (CJ) Presentation : Principle, Design and Construction of the ALICE HMPID Paolo Martinengo, Yannick Lesenechal and Jaap van.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
Agenda Introduction et présentations Personnel + Superviseurs Organisation et Activités dans la section Piquets services / Working Hours AOB –Holiday planning.
DT News CJ DT Annual Report 2010 CJ Measurement of the LHC Luminosity André Braem, Matthieu Heller with Scintillating Fibre Detectors in Roman Pots DT.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING 19 NOVEMBER 2015.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
DT News (5') Christian Joram NA62 and some developments on Straw Tracker Augusto Ceccucci, Hans Danielsson, Francisco Perez-Gomez DT Science-Techno BBQ.
PH-DT comments on the organisation Livio Mapelli 14 October 2015.
Section meeting PH-DT-EM2 Agenda  Short presentation (tour de table)  General information news  Future projects  Discussion  Coffee and cake PEREZ.
1 st DT-PO section meeting Friday May 16th,14:00, in 155-R-047 Agenda Meeting people Structure and organization of DT Budgets Office Space Mandate of PO.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
DT News CJ Survey techniques for experiments and advanced 3D Digital Reconstruction Andrea Catinaccio, Aurelie Maurisset, Christophe Bault DT Science-Techno.
Thursday December 11th, 15:00 Hrs, room 155-R-047 Agenda General news and DT (Andrea, Antti) Euclid-Catia.
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
New PH-DT website Nefeli Kousi PH-SFT/PH-DT Supervisor: Danilo Piparo PH-SFT.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Section Meeting News and MARS 22/01/ FH1. General Activity and Staff Organigram for the DI Section 22/01/ FH2 TF+GlassAndre Braem Thomas Schneider.
The EP Department Manfred Krammer.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
PH-DT Seasonal meeting 7/5/13
First collisions in LHC
Detector Technology Group (PH/DT)
RD51 test facilities E. Oliveri (CERN) on behalf of RD51.
Introduction to CERN F. Hahn / CERN PH-DT1 10. May 2007.
LBNF CAD models, Drawings and Component list
TC activities.
PH-DT Seasonal Group Meeting 21/1/14
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
CMS gas systems meeting
WP8 – Improvement and equipment of irradiation beam lines
M. Battistin CERN EN/CV/DC 9th July 2009
Savannah to Jira Migration
DT Magnet Activities Overview FH 25/06/2010 -FH.
MICE Project in the US: Completion of Efforts
BOND/QART Lab and Pixel R&D
Current Status Future Progress Monitoring
Irradiation Facilities Questionnaire
LHCb & EYETS
ESS RF Development at Uppsala University
CMS Goal of the experiment
the field of Solid state Detectors This comprises
Status of CMS-PPS timing detectors
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
Presentation transcript:

Merging DT1 + DT2 FH / 19.02.08

Content News Present Groups DT1+DT2 Motivation for Change Mandate of joint DT Group New Structure How the new group will work

News / Staff Movements M. Losasso + A. Foussat on 1 year leave to ITER as of April 30th. Re-enforcement being negotiated. Stephane R. takes over project work for T2K and TOTEM M. Ben Romdhane works for ALICE and AB Dep. (Mahdi remains administratively DT1-MM) Leaving DT1: R. Brocard left for retirement in January 08. Joining DT1: Charles-Henry Denarie transferred from AT to PH-DT1-TI since January 08 J-C Labbé transferred from ALICE to PH-DT1-TI

Present Structure (1) F. Hahn (GL) E. Sbrissa (DGL) FSU PH01 (S108) A. Catinaccio (SL) C. Bault J. Bendotti B. Brunel H. Danielsson N. Dixon F. Perez Gomez FSU PH01 (S108)

Present Structure (2) C. Joram (GL) A. Onnela (DGL) 30 staff+ fellows + ext. DT2 Group Detector Engineering & Construction CMS Tracker, Pre-shower, ECAL, Installation A. Onnela (SL) J. Baechler E. David M. Delattre R. Loos J. Mulon R. Pintus P. Wertelaers Detector Construction & Integration LHCb: Velo, RICH, Cal, Muon, Installation B. Schmidt (SL) E. Albrecht C. d’Ambrosio B. Chadaj R. Dumps T. Gys R. Kristic D. Piedigrossi T. Schneider Special Technologies ATLAS Alfa, Thin Films, TOTEM RP, Phot. Det. R&D C. Joram (SL) A. Braem C. David A. Folley L. Kottelat L. Ropelewski M. van Stenis Solid state Detectors Bond lab, Si Det. Ass. Irrad. Fac.’s, Si R&D M. Moll (SL) F. Cossey-Puget R. Fortin M. Glaser A. Guipet I. McGill (list of activities not exhaustive)

Motivation of Restructuring Transition from LHC construction to Operation Start of New R&D activities New non-LHC Experiments may appear in the future Staff numbers decrease Overlapping activities and competences in DT1 and DT2

Mandate of DT Group The mandate of the PH/DT group comprises development, construction, operation and maintenance of particle detectors for the experiments at CERN. The group clusters common services and infrastructure which are at the benefice of all experiments at CERN, i.e. gas system support, thin film lab, silicon facility with bond lab, irradiation facilities, magnet support, B-field mapping, instrumentation and controls. The group’s activities are concentrated in four areas: Completion and consolidation of the ongoing LHC projects; Maintenance and operation: piquet services, shutdown and preventive maintenance, repairs and infrastructure support; New detector projects:, participation in new developments (LHC upgrade); R&D: participation in common R&D activities in strategic fields; Years 8/9/10 ~70-80% ~10-20% ~5-10%

How to structure the group ? Linear Structure: ‘Autonomous’ sections for each activity Matrix Structure: Vertical Sections according to professional categories horizontal project structure Many sections with little interaction. Easy to manage, but inflexible. Few sections with much interaction. Challenging to manage, but very flexible. DT Model: All services and infrastructure activities in one section (mix of phys/eng/tech) All experiment related activities are distributed over 4 sections, arranged according to professional Categories.

Proposed Group Structure Engineers Designers ~ 10 Physicists Engineers Technicians ~ 27 Physicists ~ 13 1-2 Eng/Phys Technicians ~ 18 1-2 Eng/Phys Technicians ~ 13 ~ 80 people (incl. some transferred from experiments)

“Modus Operandi” 5 sections (just for illustration) ~20 projects Every project is performed by a ‘well defined’ team of people. Every project is led by an internal project leader. For every experiment we have an ‘Experiment Contact Person’.

 We need to involve Department and LHC experiments in its management. DT group will represent ~20% of PH total staff. It will be the main resource in PH for detectors and their infrastructure.  We need to involve Department and LHC experiments in its management. Meets ~2x per year. Review of activities and resource attribution. Long term planning. Meets ~1-2x per month. Follow-up of projects, short-term resource and priority changes. ECP = Experiments Contact Person

1st priority: complete/commission/consolidate LHC detectors Projects in 2008 and beyond 1st priority: complete/commission/consolidate LHC detectors Several detectors / components will only be installed during 2008 / 2009 CMS ECAL end-cap, CMS Pre-shower, TOTEM T2, TOTEM RP, ATLAS ALFA Participate in operation / performance optimization of detectors, Piquet services (gas, magnet controls) Prepare and implement shutdown activities 2nd priority: Detector upgrade activities LHCb VELO replacement CMS TRK ATLAS TRK ALICE HMPID TOTEM T1 PH R&D Work packages (WP4,5,6,7) Engineering R&D (cooling technologies, composite materials ?) Non-core activities (X-HPD, PET)