Cooling loops for prototype Staves

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Orbital Welding Development
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
Process and Product Engineering Markets: Liquid Food Industry Pharma and Medical Industry Scientific Research Aerospace Industry CATI-A Design Pro/E Design.
Cooling connections in the service gap Richard French The University of Sheffield.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
WP4 cooling update RAL 6 th Oct Welding – high repeatability statistics Bending – 2.275mm OD trials in Titanium with comparison of 1.8” OD bend.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool June 2012 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
1 ATLAS Upgrade WP4 Face to Face meeting at Edinburgh - 11 th Jan 2011 WP4 task 2: Cooling activities Richard French – The University of Sheffield.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Cooling loops for prototype staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
1 Overview Stainless Steel to Titanium joining (temp connection) Copper to Titanium (pressure drop measurements) ATLAS Upgrade dissimilar metal joining.
1.3GHz Input Coupler for ILC
1 ATLAS Upgrade WP4 Face to Face meeting QMUL 9 th May 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
Pipe cutting & Etching Ian Mercer, Harold Fox, Richard French RAL WP4 Face to Face meeting 20 th March 2012.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool 10 th November 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
Stave Tooling & Plans for Future Stave-building (Tim)
WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.
Beam Vacuum Interconnect Design Options Ray Veness.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Documentation on present system and piping layout P. Tropea Tracker Upgrade Engineering and Cooling 12 November 2008.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
1 ATLAS Upgrade WP4 Face to Face meeting Oxford 14 th May 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John.
Stave thermal analysis Cooling connections CO2 warm Test
ATLAS Internal ID Service Integration
Feedback on transfer line sizing and flow calculations for UT
UK Knowledge of Pipe Bending and Pressure Testing Martin Gibson (RAL) Pipe bending by Ian Lancaster University Connector welding by.
Ti/SS transitions A.Basti INFN-PISA*
Safety approval of the installed copper cooling pipes
Pipe Bending Ian Mercer, Harald Fox, Richard French.
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Flexible lines production and planning
LARP Phase II Secondary Collimator RC1
Future tube procurement Richard French
Mechanics: (Tim).
WP4 – Plans for next 6 months
Services Layout – Update
Flexible lines assembly
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
Presentation by: Paul Kemp-Russell.
ATLAS UK-Upgrade WP7 LMT Automated Manipulation Testing
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
LARP Rotatable Collimators for LHC Phase II Collimation
Tests of Endcap capillary & Heat exchangers at CERN
Presentation transcript:

Cooling loops for prototype Staves ATLAS Upgrade WP4 meeting Lancaster University 4th Dec 2012 Cooling loops for prototype Staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future staves Richard French - The University of Sheffield Martin Gibson, John Matheson, John Hill, John Noviss – RAL Ian Mercer - Lancaster

Tube stock availability   Production Sample Material OD mm ID mm Wall um length m  Stock Due Offcut Qty P/S/O CP2 Ti 3.175 2.775 200 2.2m 22 P 2.500 2.365 140 3.1m 1 S 2.275 2.025 125 3.0m 2 50 1.995 18 1.775 1.525 8 1.200 0.400 6 0.900 150 0.6m 4 17 1.000 0.450 275 0.360 270 0.800 0.500 0.750 0.490 130 0.670 0.405 132.5 0.595 0.330 316L SS 220 5.0m 14 1.8m 5 O 2.7m 750 2.0m 2.000 53 Aluminium 360 32 660 74 2.480 69 4.760 340 2.5m Titanium capillaries and exhaust tubing due to be delivered 3rd December 2012. 0.80 x 0.50 & 1.20 x 0.90 = capillary development requiring normal tolerances with uniform dimensions. Old Stave 2.275 x 0.125 = (2.00+0.05/-0.00mm Bore x 0.125+/-0.025mm Wall) New size 2.275 x 0.140 giving a bore 0.03mm smaller 1.97+0.05/-0mm Easier to weld – more robust. In order to get 3 Metre+/-10mm Lengths, amended all the 50 Metre quantities to 51 Metres (i.e. 17 Lengths x 3M). Trying 2.5mm OD x 140um wall; Standard (ish) OD & bombproof. Prototype capillary tubing fresh from the mill has now reduced wall to 0.750mm OD x 0.490mm ID x 0.1300mm Wall. 0.670mm OD x 0.405mm ID x 0.1325mm Wall. 0.595mm OD x 0.330mm ID x 0.1325mm Wall.

Vacuum Brazing 316L-CP2 Ti Problems all the way First – Silver plating on nuts contaminated brazed joint The VCR nut threads are silver plated to prevent gauling during assembly. This silver is reflowed during the furnace cycle = remove. Latest – Cu plating is proving difficult to be uniformly coated down the narrow bore of the fitting If proves impossible I will reduce the depth of the mechanical joint to allow better penetration of the Cu fitting. Summary – it is still a Cu plating problem with the 316L fitting – the braze process works on larger items. 1/8” Ti to VCR 2.275mm OD Ti to VCR 1/8” Ti to VCR NEW REFLOWED

Confirmation of design Confirmation of design? Stave ‘09, Stave 250, Stave130 SMC, EoS arrrghghgh……

EOS – how does this shape up? New z = 1.3m Stave end John Noviss What is length tube sticking out from stave end? Universal decision for 250. EOS – how does this shape up?

Image of z=1.3 Stave end How much tube length is used in total up to this point?

Specifications Stave name Raw tube Bend radii EoS Y/N Z=0 radii Comment Stave 250 2.275mm; 1/8” Ti. 1/8” 316L N Majority made in 316L SS. CP2 Ti on shelf in 1.8” OD & 2.275mm OD Stavelet 250 None spare Stave 130 2.275mm Ti None made Stavelet 130 Pressure drop 316L & CP2 Ti Various parts made based on Stave 250, with and without SMC, 1.2 & 1.6m stave PIXEL Disc 2.275mm OD CP2 Ti 1x half disc rough prototype made Encapsulated joint 1/8” CP2 Ti In work – one item to make based around?

From past planning Assuming we have minimal decisions made so rather vague or exceptionally obvious Stave, Stavelet cooling circuits Re-stock of cooling circuits and stavelet circuits. Include pressure testing > DATABASE entry. Re-stocking of tube material and bending trials on capillary tubing Pressure drop measurements – Components part produced – design finalisation required CO2 plant booking Feb13 see Richard Bates’ presentation later. TIG Orbital Welding. Reprogramming M200 and using grounding system from new system = part done Gas purge over long distance and multiple manifold measurements/effects on weld quality = started Measurements of electrode tip angle – arc gap and power v weld quality = 2013 Finalised electrode – seeking mass production or tooling to make in house. = 2013 Continuing to refine Swagelok weld head for heat sinking and improved tube alignment. = on going Bring online the InterPulse system and test on 2.275mm OD 125um wall CP2 Ti. = part done / on going / slow Laser welding Hopefully see Ian Mercer’s presentation for an update from Mike.. Material reduction Changing bulbous sleeve joint to butt weld on 125um tube with tooling from PIPE ltd. = Slow as small sizes Reducing mass in capillary tube wall – production limits. = Done Fittings Vac brazed stubs full statistical trial. = VERY SLOW and still waiting for test pieces CP2 ti fittings – material sourced from Sandvik. Need to check cost out v custom fitting from Swagelok or Fti plus the effort put in at QMUL. = Material rubbish – won’t weld. Re-manufacture of 6LV VCR thin wall fittings as run out. = Done Thermal shock etc in the pipe line at some point – hardware almost completed at RAL. = ¾ done Burst testing of circuits to see where calculated headroom is v actual – mass reduction maybe. = ISIS contacted ????