Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
From Research Prototype to Production
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Solar Probe Plus A NASA Mission to Touch the Sun End to End Test Agenda April 24, 2014 Elena Adams SPP Payload Systems Engineer.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
What Documentation Needs to be Submitted With an Approval Application?
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
I. Preliminary Design Review 1. Product specification 2. Project scope 3. Technical approach/solution to the Design Problem 4. Working Schedule (Gantt.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
01.Oct.01 SPIRE BSM Product Assurance Team Briefing 1 BSM Product Assurance Plan Team Briefing & PA plan roll-out Ian Pain.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
FIELDS Mission Assurance Manager University of California, Berkeley
Accelerator Readiness Review October 31, 2006
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Wide-Field Imager for Solar PRobe Plus (WISPR)
EFW DFB Systems Assurance
EFW DFB Systems Assurance
FIELDS Mission Assurance Manager University of California, Berkeley
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
Spacecraft Interface and I&T
Solar Probe Plus FIELDS
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
GLAST Large Area Telescope:
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS Mission Assurance
THEMIS INSTRUMENT SUITE
ISUAL Product Assurance
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope:
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2007.
Systems Engineering Bob Goeke.
SLAC DOE Program Review
Integration and Test Organization Chart
GKN AEROSPACE – ST. LOUIS
GLAST Large Area Telescope:
Integration and Test Organization Chart
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2008.
Presentation transcript:

Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017 David Glaser FIELDS Mechanical Engineer Space Sciences Lab University of California, Berkeley dglaser@ssl.berkeley.edu

Attached Documents SPF ANT 076 Rev A V5 Indentured Drawings List (Drawings available for viewing on request) SPF ANT PRC 016 Rev B V5 As-Built Assembly Procedure SPF ANT PRC 018 Rev A V5 Integration Procedure SPF ANT ICD 005 Rev A V5 Antenna MICD SPF ANT 069 Rev D V5 FM Vibe Test Procedure_RevD

1. As Built Data The included document SPF-ANT-PRC-016 V5 As-Built Assembly Procedure contains all relevant as-built data, including part description. The included document SPF-ANT-076RA V5 FIELDS V5 Indentured Drawings List-signed contains a list of all drawings and their revisions.

1. Storage and Integration Requirements Storage of the V5 instrument requires ESD safety precautions. A connector saver will be on the pigtail connector, and a shorting connector on the connector saver. The instrument does not require purging or an inert atmosphere. The included document SPF-ANT-PRC-018 V5 Integration Procedure contains instructions for integration. The included document SPF-ANT-ICD-005 V5 Antenna MICD contains all relevant mechanical interface data. Mechanically, the most vulnerable parts of the V5 instrument are the two small antennas. Care must be taken to not bump into them. Prior to I&T, the instrument will be stored in it’s shipping container. During I&T, when on the spacecraft, the V5 instrument will usually have its red-tag cover on. During I&T, when not on the spacecraft, the V5 will be stored on a grounded bench stand and covered with conductive plastic. Except in the case of observatory level environmental tests, the V5 instrument will be inside a protective red tag cover.

1. As Built Data – Final Configuration Photographs Additional Photographs of the flight hardware are located at: https://spp.ssl.berkeley.edu/svn/FIELDS/05_Instruments/08_Preamp_Antennas/FIELDS%20Mechanical/Photos/Flight/V5/

1. As Built Data – Final Configuration Photographs Red Tag Cover

Evidence of Acceptance by Developer QA See SPF ANT PRC 016 V5 As-Built Flight Assembly Procedure

9. Storage and Integration Requirements Storage of the V5 instrument requires ESD safety precautions. A connector saver will be on the pigtail connector, and a shorting connector on the connector saver. The instrument does not require purging or an inert atmosphere. Prior to I&T, the instrument will be stored in it’s shipping container. During I&T, when not on the spacecraft, the V5 will be stored on a grounded bench stand and covered with conductive plastic. Except in the case of observatory level environmental tests, the V5 instrument will be inside a protective red tag cover.