SHORT LHC-TS Coordination meeting #1

Slides:



Advertisements
Similar presentations
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Advertisements

ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
For more info:
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LHC-YETS Coordination meeting #9 24 th November, 2015.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Overview of the LHC Year End Technical Stop
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Magnet activities in SPS during EYETS
YETS & LS2 Works EN-EL / Power distribution
ALICE 5 o’clock meeting Wk 51.
East Area Renovation Project Team meeting # 2 – EDMS News
TS2 preparatory meeting
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
TE-MSC activities in SPS during LS2
Wednesday 3rd October - morning
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Forecasts for waste and radioactive material storage
EYETS LHC 2016/2017 Works EN/EL/CF
Injector De-cabling Project
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
LHC-EYETS 2016/17 Coordination meeting #18
HEL – Safety aspects Christelle Gaignant
TE-MPE LS1 review Vision from EN-EL(CF)
SPS - EYETS 2016/17 Vacuum systems planning
Helium spill in LHC tunnel
LIU–PLI report LIU SPS meeting.
LHC-TS3 Coordination meeting #3
Julie Coupard Schedule and Coordination
Keeping LHC cold during LS periods Preliminary proposal
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
EN-HE SPS works during EYETS
TS1 preparatory meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
NA CONSOLIDATION & SAFETY SYSTEMS
SPS East Extraction bump inhibit during COLDEX operation
SPS activities during LS2 TE-EPC (Power Converter Group)
Short LHC-TS week 38 Confirmed by LMC on 16th August
Cryogenic Risk Assessment in LHC
YETS PS + PS SWY + TT2 Facility Coordinator:
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
TE-MSC activities in SPS during YETS
BE-CO Activities for PSB
K. Foraz on behalf of OSS members
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Vers PS YETS PS Booster David HAY & Cyrille BEDEL.
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Technical Stop #4 29th August - 2nd September 2011
Wire almost entirely through beam before BLM triggers dump
Monday 3rd September - morning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 09/01/2019.
Powering and Safety day Underground access during powering tests
LHC coordination meeting 12th December 2017
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

SHORT LHC-TS2-2017 Coordination meeting #1 5th September, 2017 AGENDA LHC-TS2 preparation – Maria Barberan AOB

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 General reminders All LOCK OUT requests via Impact LHC-TS2-2017 Access possible from Monday 18th Sept. @ 8am, to Wednesday 20th Sept. @ 5pm (see access contraints) Beam off Monday @6h00, cryo start back on Thursday morning ATLAS ready for beam on Thursday afternoon (worst case) The LHC machine will be in Automatic Restricted Mode Access with Key Inter-site doors will remain closed Piquet’s phone number: 161669 from Monday 18th to Wednesday 20th INDICO: https://indico.cern.ch/category/9288/ (LHC-TS2-2017) OSS website (planning, constraints…): https://espace.cern.ch/en-dep-mef-lpc/TS2017/SitePages/Home.aspx LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Access conditions related to Cryo Access to P2, P8 & P5 IT areas with Work Authorisation approved LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Inner Triplets interventions P2 SURVEY Measurement IT area LHC TS2 MONDAY 18h September 6h00 7h00 14h00 18h00 BEAM OFF P2 CRYO Reconfig. (4h) TUESDAY 19th September WEDNESDAY 20th September BEAM ON THURSDAY 21st September P2 Reduction consumption + ALICE (8MW) P2 CRYO recovery (24h) P2 CRYO Fill IT & Final recovery (Cryo Start) 15h00 12h00 13h00 P5 CRYO Empty IT P5 CRYO Fill IT (Cryo start) P5 X-Ray DFBX to IT area P2 EN-EL Protection “Anti-fouine” P2 CRYO Empty IT P8 CRYO P8 CRYO Fill IT (Cryo Start) P8 SURVEY Measurement IT area P18/P2 CRYO Safety temp. sensors Point 2 Point 5 Point 8 19h00 8h00 DFBX Lock-out DFBX Electrical Unlock out Cryo Lock-out Cryo Lock out 16h30 Cryo Unlock-out Cryo Unock-out Cryo Unlock out Full power According to survey completion in ITs (12h00-15h00)  Cryo start readyness on Thursday between 7h00 and 12h00 LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Interventions on Point 4 No empty of RF cryogenics No access in RUX 45 during the TS2 (RF cavities filled) Access in RB44 and RB46 from Monday to Wednesday 14h00 (BI activities) Presently a VIC is foreseen in UX45 on Tuesday, to anticipate the PR refurbishment foreseen during the YETS Last Tuesday (29th Aug.), during the LHC coordination meeting  request from Gino Cipolla to access in RUX 45 to replace some dampers. This request is presently not compatible with the decision to not empty the RF, due to the Helium Spill risk. TE-EPC would like to test and power on the power converter RA47U3, but this is under discussion, because this should prevent any access in RB44 and RB46 (tbc) LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Interventions on Point 4 LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

TOTEM – S. 4-5 & 5-6 Detector exchange packages and Vertical lifting LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 TDE U62 Investigation Activities declared: Opening of the shielding Visual inspection Robotic intervention for leak detection Possible leak rate reduction (if any) Closing of the shielding Due to RP restrictions the shielding cannot be opened before Tuesday morning (TBC by RP) Material can nevertheless be transported in the area already on Monday after RP patrol Open points: Cryo conditions for the passage of the equipment above the QRL ? Installation of N2 lines ? VIC to be planned? Are they some investigations planned in UD68? LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 BE-BI activities LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Work authorizations (Helium spill risk) updated on 4th Sept. 2017 No new Work authorisations for TS2?? TE-MSC  Magnet inspection in IT P2, P5 & P8 EN-ACE-SU  Measures of the DFBX and Triplets in P2 and P8 EN-MME  X-Ray DFBX in P5 EN-ACE-OSS  Visit for list equipment under the IT P2, P5 & P8  on going LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 RP survey priority Point 2  access as soon as possible to 16L2 Point 5  TOTEM activities Point 4  BE-BI interventions LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 Constraints LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 Constraints LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 Constraints LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 Constraints LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 IMPACTS : BE @ Monday 4th September @12h00 LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 IMPACTS: EN EN-CV Lock out needed P6 – P7 – P8? @ Monday 4th September @12h00 LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 IMPACTS: TE circuit RCBXH2.R1 (spurious trips) circuit RSS.A56B1 in RR57 (spurious trip) TE-ABT Lock out needed P6? TE-MPE Lock out needed P1 – P5 ?? @ Monday 4th September @12h00 LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 IMPACTS: EP, IT & SMB @ Monday 4th September @12h00 LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 Lock-out requests Electrical Lockout Cryogenic Lockout EN-ACE-SU  Measures of the DFBX and Triplets EN-MME  X-Ray DFBX @ Monday 4th September @12h00 LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 VIC requests UX45 pour activité du pont roulant PR-711 RUX65 pour intervention sur dump (?) … @ Monday 4th September @12h00 LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Roadmap towards YETS and LS2 Week 36 - 5th September: BE-RF – K. Turaj LHC-TS2 preparation: EN-ACE-OSS Week 37 - 12th September: Week 38- LHC technical stop 2 Week 39 – 26th September TE-MSC cryogenics magnets – Sandrine le Naour / JPh Tock TE-MSC – Philippe Denis TE-MPE - Giorgio D’Angelo/ Reiner Denz / Richard Mompo SMB-SE – Frederic Magnin / Christophe Biot Week 40- 3rd October EN-EL-FC: Cabling – Jean Claude Guillaume / Antonio Gonzales TE - EPC: Power converters activities – Valerie Montabonnet / Hugues Thiesen TE-VSC –G. Bregliozzi / Eric Page / Jaime Perez Week 41- 10th October EN-HE-HH – Serge Pelletier TE-ABT – Francesco Castronuovo/Laurent Ducimetiere ECR Overview for YETS & LS2 – Anne Laure Perrot EN-EA activities – ? Week 42- 17th October TE-CRG Updates - K. Brodzinski / G. Ferlin / A. Perin BE-OP – Mirko Pojer RP Recommendations – Cristina Adorisio / Christophe Tromel LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531 Back up slides LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY All - LSS1L – Point 1 - LSS1R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY Arc1-2 – Point 1.8 – Ti2 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY LSS2L - Point 2 – LSS2R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY P3.2 – Arc2.3 – P3 – Arc3.4 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY LSS4L – Point 4 – LSS4R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY Arc4.5 – LSS5L – Point 5 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY LSS5R – Arc 56 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY LSS6L – P6 – LSS6R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY Arc 76 - LSS7L – P7 – LSS7R – Arc 7.8 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY LSS8L – P8 – LSS8R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531

Personal ODH MANDATORY Arc8.1 – Ti8 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC TS2 2017 EDMS 1831734; INDICO 640531