Current Status of ITER I&C System as Integration Begins

Slides:



Advertisements
Similar presentations
ITER CODAC Plant Control Design Handbook October 2008
Advertisements

Chapter 3: Planning a Network Upgrade
Stuart East, 22 nd May 2012 Delivering industrial solutions for the fusion research community Stuart East.
This plan covers The design, implementation, installation, integration and commissioning of the Central Instrumentation & Control System (CODAC, CIS and.
Page 1 ITER Control System – meeting – date © 2013, ITER Organization The Control System of ITER Overview, status and PS integration CODAC team ITER IO.
RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.
Predictive Maintenance: Condition monitoring Tools and Systems for asset management September 19, 2007.
Integrating Acquired Subsystems Bob Dalesio 09/21/99.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Chapter 2 Network Design Essentials Instructor: Nhan Nguyen Phuong.
12-CRS-0106 REVISED 8 FEB 2013 EPICS Collaboration Meeting 2013 CSS An integrated development and runtime environment for ITER plant system local controls.
Company Profile ► Our Expertise Here at SIEMSTECH we have a passion for designing and implementing integrated, network-centric technology solutions across.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
EPICS Collaboration Meeting Spring 2010, Aix France, Jun 2, 2010 Page 1 ITER CODAC COntrol, Data Access and Communication System for ITER Anders Wallander.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Bruno Gonçalves | Oct., 2008 | ITER –CODAC Colloquium Summary of Working Group 3 Software Bruno Soares Gonçalves with strong.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
Topics of presentation
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
Life cycle services for automation products
Chiller control system Lukasz Zwalinski – PH/DT.
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
CERN Timing Workshop, Geneva, 15 Feb Geneva, 15 Feb 2008 Franck Di Maio – ITER IO Geneva, 15 Feb 2008 Franck Di Maio – ITER IO CERN Timing Workshop.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Spring 2015 EPICS Collaboration Meeting, May 2015, FRIB East Lansing, MI, USA © 2015, ITER Organization Page 1 Disclaimer: The views and opinions.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
PLC based Interlock Workshop CIS Team February 2016 ITER Central Interlock System Fast Interlock Controller.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Availability of ALICE Grid resources in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
ITER & CODAC Core System Status Update
Combining safety and conventional interfaces for interlock PLCs
ControlLogix Portfolio
Cryoplant Controls Installation
BaBar Transition: Computing/Monitoring
XBee Based Motor Control for Farmers
Uniper Energy Services
Accelerator control at iThemba LABS
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Supervised by Prof. Ran Gilady
PSS Plans for Improved Reliability and Availability
A New Era in Critical Communications
The ILC Control Work Packages
How SCADA Systems Work?.
the CERN Electrical network protection system
CORPORATE PROFILE JUNE 2016
ITER Instrumentation and Control - Status and Plans
Programmable Logic Controllers (PLCs) An Overview.
PLC’s Are ... Similar to a Microcontroller: Microprocessor Based
COMMUNICATION SOLUTIONS
COntrol, Data Access and Communication System for ITER
Reduce Customer Down Times to a Maximum
Instrumentation and control
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
REMOTE POWER MONITORING OF MARINE SITES
Testing Plan and Status
Plc & scada applications
TS2 PSS Architecture, Concepts of Operations and Interfaces
ESS Main Control Room & ICS Infrastructure
The smart choice for demanding motor switching
Commissioning the European XFEL cryogenic system and best practice
Review of hardware commissioning
East Hall under construction
Presentation transcript:

Current Status of ITER I&C System as Integration Begins Will Davis ITER Organisation

Contents Introduction to ITER I&C system and its integration Architecture of ITER I&C system Organisation of ITER I&C supply and integration Design maturity of I&C systems Roadmap for integration of plant I&C systems

The ITER I&C system – making ITER work Everything you can see has I&C that is part of the overall integrated ITER I&C system. My talk is about integration, looking at the macro, not the micro

A bit of interface problems ITER I&C System The Control System is the system which functionally integrates the machine ITER Agreement splits the project in procurement arrangements distributed among the seven members Missing items Island mentality A bit of interface problems Ahhh,I forgot that I need that in my system That should be implemented in your system, not mine Ahhh, we forgot there is an interface between A and B We changed the design so the interface does not exist anymore Ahhh, I did not know the others are doing the same thing in a different way I do not care what the others do. I build my system.

ITER I&C System

Interfaces with domestic agencies and suppliers

ITER I&C System Mission Statement Ensure all ITER plant I&C systems are designed, implemented and integrated such that ITER can be operated as a fully integrated and automated system. Successful integration = higher reliability Minimize required operators Minimize required maintenance crew Minimize operator human errors Operate from a single control room Use only standard equipment in control room

How “BIG” is the ITER I&C? ITER I&C System How “BIG” is the ITER I&C? Measure ITER Comparison Central-Plant I&C interfaces 330 I&C controllers and computers 1000 4500 (CERN) I&C cubicles 4800 1468 (APS) I&C components 100000 I&C cables 6000km Buildings and plant areas 90 19 (APS) Nuclear safety I&C functions 143 533 (WWER-1000 “algorithms”) Machine protection I&C functions 150 Plant I&C signals 115000 200000 (NSLS-II) EPICS records 1 million 985000 (NSLS-II) EPICS IOCs 2000 887 (NSLS-II) Data rate 50 GB/s 775 GB/s (AT&T Global Ops) Surface area 0.42 km2 30.4 km2 (Reliance Jamnagar)

ITER I&C System Architecture

ITER I&C System Architecture

ITER I&C System Architecture CBS Level 1 CBS Level 2 ITER control system is broken down in 18 ITER control groups (CBS level 1) An ITER control group contains many Plant System I&C (CBS level 2) A Plant System I&C is a deliverable from a procurement arrangement (IN-KIND) A procurement arrangement delivers a part, one or many Plant System I&C

Design maturity of I&C systems All central I&C systems are in final design phase Final design reviews planned for 2016 and 2017 Most plant I&C systems are less mature Risks: I&C needs from other systems are not known until too late, E.g. cabling, networks, power, environmental, structural

Central Networks Infrastructure Build-to-print design available Call for Nominations of supply and installation to be launched now Start of installation scheduled 2016 Bill of Material 177 cubicles 186 passive network panels 300 km multi-core single mode 100 km multi-pair copper cables Connecting thousands of plant system I&C client cubicles located in ~90 buildings and plant areas via network panels located in 25 buildings

Plant system I&C focus Building services Utilities Poloidal field coil fabrication building already monitored by CODAC First operational building for site electrical supplies will be ready 2016 Utilities Construction electrical supplies already monitored by CODAC Steady state electrical supplies start to operate in 2016 Reactive power compensation system ready in 2017 Cooling water system Non-tokamak cooling will be installed from late 2016 Coil power supplies ACDC converters will be installed and commissioned in 2018

Location of plant I&C systems

Risks with non-standard technologies Communication incompatibility Lack of diagnostic coverage and fault-tolerance Absence of health and performance monitoring Unable to implement local/remote HMI switching Examples of known non-standard technologies: LabVIEW-RT based controllers QNX-based controllers with custom made drivers Custom made PCBs without long-term manufacturer support Safety relays and logic without diagnostic capabilities Every non-standard technology adds additional unnecessary difficulties The challenge is great enough already!

The main challenge for ITER I&C System is INTEGRATION MITIGATION Defined standards, specifications and interfaces applicable to all plant systems instrumentation and control (PCDH) Develop and distribute a control system framework that implements standards defined in PCDH and guarantees the local control system can be integrated in the central system (CODAC Core System) Provide I&C Integration Kit free of charge (PSH, Mini-CODAC, switch) Provide catalogues of tested hardware (PLCs, industrial computers, safety logic controllers, I/O and network cards, network switches, cubicles and monitoring systems) Framework contracts and dedicated contacts for key hardware suppliers Provide User Support Organize Training (PCDH campaign, CODAC Core System hands-on training at IO and DA, videos on Online Learning Centre) Implement Pilot Projects to prove the solutions Organize User Meeting

Conclusions The ITER I&C system is big, but it is also organisationally complicated Integration of the ITER I&C system is essential to meet the project objectives The project has taken many measures to mitigate risks Non-standard technologies are a significant threat to successful integration Central I&C systems are in final design Central network infrastructure installation is planned for next year Integration of plant I&C systems to central I&C systems has already started and will soon become our main activity