Oncor Electric Delivery Company LLC

Slides:



Advertisements
Similar presentations
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Advertisements

Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
System Strength Discussion
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to WMS Austin, TX August 10, 2011 Kenneth A. Donohoo, P.E.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
ROS June 12, 2008 Meeting ROS Report for June 26, 2008 TAC Meeting Randy Jones ROS Vice Chair.
RTWG Report to TAC August 5, 2010 Howard Daniels.
ROS Feb 2006 The Model Curtis Crews Network Model Engineering Supervisor
PRR835 – Reactive Power Capability Requirement
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Technical Advisory Committee Presentation to the ERCOT Board of Directors June 16, 2009.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
1 TSP Nodal Engagement Market Participant Call ERCOT September 15, 2010.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Review of Integration of the Requirements of MOD Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
© CONSTELLATION ENERGY GROUP, INC. THE OFFERING DESCRIBED IN THIS PRESENTATION IS SOLD AND CONTRACTED BY CONSTELLATION NEWENERGY, INC., A SUBSIDIARY.
Panhandle Renewable Energy Zone (PREZ) Study
Wind Operations Task Force Overview for ROS Feb 2009 mtg: WOTF has drafted a scope for ROS to consider. WOTF recommendations for Chair & Vice Chair: Chair.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
1 TAC Report to the ERCOT Board November 14, 2006.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 20, 2009.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
1/14/10ERCOT ROS / CREZ OGRR1 Why is CREZ Unique? 15 GW of intermittent generation when ERCOT load is less than 30 GW 5000 miles of 345 kV circuits with.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
RTWG Report to TAC January 6, 2010 Henry Durrwachter.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Texas Nodal Electrical Buses and Outage Scheduling.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Nodal Planning Go Live Austin, TX February 3, 2011
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to ROS Austin, TX August 11, 2011 Kenneth A. Donohoo, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
NMT – Network Operations Modeling & Telemetry - Project
Protocol Revision Subcommittee
PLWG Review 6.9 and the Interconnection process
Initial ERCOT Parking Deck Prioritization Recommendation
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
2011 Prioritization Update to Market Subcommittees
Ken Shoquist VP, CIO Information Technology Board Meeting October 2003
March 1, 2016 Retail Market Subcommittee Update to TAC
Technical Advisory Committee
Initial ERCOT Parking Deck Prioritization Recommendation
Modifications to Planning Charter
Technical Advisory Committee
Reliability and Operations Subcommittee Report
Planning Tools Overview
Planning Tools Overview
Presentation transcript:

Oncor Electric Delivery Company LLC RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX March 4, 2010 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company LLC

Nodal Model Effort Activity Operations Model (NMMS) Topology Processor (Software) CRR Model Long Term Planning Model NDSWG Support Significant Effort Good Shape Improving Under Development Outputs 12/15/2009 02/24/2010 Updates Continuing Full Functionality Needed SSWG Support Significant Complex Work To Complete SSWG Support Additional Capability Needed To Meet Planning Needs Development Delayed 03/04/2010 Ken Donohoo ERCOT TAC Meeting - ROS Report

Nodal Model Effort Activity NDSWG, SSWG and ERCOT Staff Partners in Effort Coordinating Well Communications Improving Developing solutions Very complex translating different environments Software tool(s) need further improvement, speed and capability Everyone committed to meet Nodal Implementation Continuous effort required to maintain databases Complete coordination of operating and planning databases is the goal Current and new NERC standards may require further operations and planning model changes to support required analysis 03/04/2010 Ken Donohoo ERCOT TAC Meeting - ROS Report

TAC Voting Items SCR 758 - Enhancements to the Proposed Transmission Outage Report ROS unanimously voted to endorse 03/04/2010 Ken Donohoo ERCOT TAC Meeting - ROS Report

ROS Activities Recognize the changing nature of the ERCOT grid Frequency and voltage control (reactive) concern Improvement to operating and planning data Development of Planning Guides and Planning Working Group (PLWG) Increases focus on planning activities Bring all planning related documents together Increase transparency and communication Use same change control process as Protocols with approval to ERCOT Board Include planning charter, generation interconnect procedures, criteria and procedures Consolidate several separate working groups under the new working group 03/04/2010 Ken Donohoo ERCOT TAC Meeting - ROS Report

ROS Issues and Action Items Expansion of Series Capacitors (Compensation) and Possible Interactions with Power System Elements Operations Reactive Power and Voltage Control Planning Reactive Power Analysis Renewable Integration Reduced Load Level Analysis Off Peak modeling (MW and Mvar) and cases Stability Analysis Models and Data (includes RARF) NMMS (MOD) Implementation in Planning Environment Planning Compliance Coordination Integration of new standards in criteria and guides Smart grid incorporation in planning and operations Generator expectation communication and certification Energy Efficiency and loss reduction Creation of Planning Guides and Working Group (PLWG) Consolidation of working groups Automation of PDCWG analysis 03/04/2010 Ken Donohoo ERCOT TAC Meeting - ROS Report

ROS Next Meeting Thursday, March 11, 9:30 AM at ERCOT Austin Voting Items: Create Planning Working Group and Develop planning guides PDCWG Procedures Disband WOTF and LTSTF PRR833, Primary Frequency Response Requirement from Existing WGRs OGRR232, Revise the Process for Submitting Biennial Unit Reactive Limits (Lead and Lag) NOGRR027, Revise the Process for Submitting Biennial Unit Reactive Limits (Lead and Lag) OGRR240, CREZ Facility Protection and Control Requirements OGRR242, Section 7 System Protections Revisions to Meet Pending NERC Requirements for New Construction Nodal Model Effort CREZ Reactive Study Update – ABB Presentation 03/04/2010 Ken Donohoo ERCOT TAC Meeting - ROS Report