ACD in 2006 CERN beam test Here I am listing beam test ACD issues for discussion: ACD will be represented in CERN beam test instrument by minimum 4, and.

Slides:



Advertisements
Similar presentations
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Advertisements

0 LAT Coordinate System LAT-TD (it’s in CyberDocs) Purpose: The hardware and software designs need a clear, consistent and universally accepted.
Gauging Devices.
The Gamma-Ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE Anticoincidence Detector for GLAST Alexander Moiseev,
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
GLAST LAT ProjectFeb. 17, 2004 Hartmut Sadrozinski: TKR Flex Cables 1 TKR Flex Cable Issues addressed TKR Flex Cable Issues addressed Mechanical 1.Grid.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Alex Moiseev NASA/GSFC 12/16/2005 Some ACD Calibration issues I.ACD mip peak monitoring 1. ACD mip peak monitoring requires the measurements to be done.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
GLAST LAT ProjectSept 3, 2003 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
Configuration Database David Forrest 15th January 2009 CM23, HIT, Harbin.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
10/10/2005 Alex Moiseev 2006 LAT Beam test 1 Suggestions to 2006 LAT prototype beam test plan Alex Moiseev, NASA/GSFC.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
1 Suggestions to 2006 LAT prototype beam test plan Alex Moiseev, NASA/GSFC.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Working Drawings Competency: 00X.00
GLAST Large Area Telescope:
Profiler Mechanics Update
Procurement Desktop Defense (PD²) Creating an Indefinite Delivery Contract SPS Spotlight Series February 2014.
Working Drawings Competency: 00X.00
Update on Pavia MM mechanical prototype
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
News about the WA104 Programme
Gamma-ray Large Area Space Telescope ACD Final Performance
The interaction region for FIRST (status report)
Mini-drawers, FE-ASIC , Integrator
Gamma-ray Large Area Space Telescope
G. Carboni for the Muon Group
First of all we will remind some numbers:
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Law 3 The Number of Players.
Overview Goal Study GEM variables in SVAC ntuple
Neighborhood Name Here
Status of the experiment in Italy
ACD Subsystem ACD segmentation and the
GLAST Large Area Telescope:
GLAST LAT System Engineering
Pierluigi Paolucci & Giovanni Polese
Status Report and highlights from workshop II
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

ACD in 2006 CERN beam test Here I am listing beam test ACD issues for discussion: ACD will be represented in CERN beam test instrument by minimum 4, and maximum 8 tiles upon their availability; single-row chassi with FREE board; and appropriate GASU cables Preliminary position of the tiles is shown in next slide. Priority in tile positioning is subject for the discussion. Tile 1 is placed on the top of the “tower” space adjacent to the beam, and represents the closest to the real backsplash case. I am concerned that the propagation of Monte Carlo proving over large range of angles may be not correct; 180 degrees with the tile in a plane normal to the beam direction (exact backsplash) is very important direction and has to be validated in a beam test ACD shall be mounted in the frame which allows flexibility of tile positioning depending on MC results. Tile mounting is done by taping tiles to the frame rather than using flight design of screwing them down

BEAM 1 2 6 BEAM Tracker tower 3 7 4 Tracker tower 5 8 Grid with calorimeter ACD tiles

Hardware availability: Positioning of the tiles outside of the container (Idea of L. Baldini) can be considered if it has significant mechanical advantages Hardware availability: Tile # Tile description Tile # per ACD Fiber Cable Status 1 Top tile, 33 cm by 33 cm, “flight spare” H-2 Spare 150 cm, needs PMT end parts Tile is ready, cable needs work. Will be ready by 3/31/06 2 Top tile, old design, 33 cm by 33 cm N/A Old design, 150 cm, needs PMT end parts Tile needs some re-furbishing, cable needs work. Ready by 3/31/06 3 Tile from QualUnit, 17 cm by 33 cm E-422 Does not need a cable; has both 50 cm long WLSF bundles Ready, will be available from SLAC 3/31/06 4 Tile from QualUnit, 17 cm by 33 cm. Will use only one fiber bundle if another one is too short O-320 Does not need cable; has 42 cm and 100 cm long WLSF bundles 5 O-124 6,7 10 cm by 10 cm tiles from GSFC external trigger setup Has 35 cm long WLSF bundle for single PMT Ready, available now 8 “E” tile, 17 cm by 33 cm, flight one, but had wrong dimensions that’s why was rejected E-01 Needs clear fiber cable, use spare 150 cm, needs PMT end parts

FREE board and chassi – will be borrowed from SLAC (ACD QualUnit) in the late March. Ready for use GASU cables – available, both from SLAC (ACD QualUnit) and from GSFC. Check the lengths - Alex Action items: Agree ACD tiles number and positioning – Philippe, Eduardo, Benoit, Ronaldo, Alex, all interested – by 01/15/2006 Agree ACD mechanical arrangement (concept) – INFN, Alex, Gary – by 01/25/2006. Include needed grid modification in the task for machine shop Approve the use of (doubled) flight spare tile “H” – Eduardo, Dave Thompson, Alex – by 12/31/2005*) Provide exact dimensions of ACD hardware – Alex, by 12/31/2005 Provide chassi mockup (if available) and tile (example) to INFN – Alex, 12/31/2005 Finish detailed ACD mechanical arrangement - INFN, Alex, by 02/28/2006 *). GSFC has 2 flight spare tiles “H” for 6 tiles of the same design in flight ACD. The idea is to use on of these spare tiles, leaving another one as a spare.