EuroTeV WP7 activities in DESY

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Nick Walker KEK-DESY meeting 7 th March 2005.
ILC Tech Meeting, March 29 th 2007 Cold quadrupole vibration measurements on Module 6 during the 10 th /11th thermal cycles at CMTB Ramila Amirikas, Alessandro.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Louis J. Rubbo, Neil J. Cornish, and Olivier Poujade Support for this project was provided by the NASA EPSCoR program.
StaFF: Motion Stabilization with Nano-Meter Precision Proposed experiment conducted within framework of StaFF (Stabilization of Final Focus for ILC). Funded.
CERN VIBRATION SENSOR PROPOSAL The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Ramila Amirikas, Alessandro Bertolini, Jürgen Eschke,
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
Linac Girder R&D C. Boffo – F. Le Pimpec Slide 1 LINAC GIRDER R&D C. Boffo (FNAL) - F. Le Pimpec (SLAC)
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
Review of Ground Motion Measurement Program of DESY in Various Sites R. Amirikas, A. Bertolini, W. Bialowons LHC tunnel, CERN HERA tunnel, DESY Ground.
Prototype Test of Vibration Isolation System Current Status & Schedule
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
Oct 17 Fall Report 1 Ground Motion and Vibration for LET Simulation, “Point of Contact” Paul Lebrun CD/FNAL And…
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
Type IV Cryomodule (T4CM) Vibration Analysis Update January 23, 2007 Mike McGee 3 rd T4CM Meeting at INFN-Milan.
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Ground Motion spectra status A.Jeremie on behalf of the DESY EUROTeV group which ceased to exist mid-2008 : R.Amirikas, A.Bertolini and W.Bialowons (et.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Ground vibration measurements Heiko Ehrlichmann, Wilhelm Bialowons, DESY, Hamburg, Germany.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
FP7: EuCARD after a year of preparation… A.Jeremie.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Beijing ILC Workshop Global Design Effort 1 Main Linac EDR: Cavity & Cryomodule Discussion Lutz Lilje DESY.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
EuroTeV WP7 activities at DESY Group Members: R. Amirikas, A. Bertolini, W. Bialowons, H. Ehrlichmann Total Man Power: 1.5 reaching 2 (maximum)
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
BNL-SLAC-Annecy TeleConference
Vibration issues at Linear Colliders:
Orbit Control For Diamond Light Source
Meeting for S1-Global module design Cryomodule and Cryogenics
Bellows Vibrations in the 3.9 GHz Cryomodule
Some movement monitor systems at DESY
Topics on Vibration Issues
Laboratories in Annecy working on Vibration Stabilization
SuperB Injection, RF stations, Vibration and Operations
Status of Vibration Measurement Work at BNL
What Should We Do?.
Main Linac EDR: Cavity & Cryomodule Discussion
Status of the TESLA Magnet Package and Vibrations at TTF
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
ILC Cryogenic Systems Draft EDR Plan
Fixed Support Design & Testing
Alignment Diagnostic System Status
Presentation transcript:

EuroTeV WP7 activities in DESY Group members: R. Amirikas, A. Bertolini, W. Bialowons, H. Ehrlichmann Total man power: 1.5 reaching 2 (maximum)

EuroTeV WP7 projects Metrology in DESY Site characterization and parameterization of data Correlation measurements; related to site characterization Floor motion due to building foundation (e.g. piled foundation & floor slabs) Stabilization in DESY Accelerator component vibration studies: Cryomodule vibration studies in warm and cold environments, geared towards main linac design (one of the main cost drivers for the ILC) Stability of support structures, such as girders Facility noise: potential vibration sources in a tunnel, e.g. vacuum pumps, modulators

Power spectral densities for five measured sites Metrology: site measurement & chracterization Study the impact of ‘cultural noise’ @ f >1 Hz, at several accelerator laboratories & synchrotron light sources 19 sites are measured so far. Database available: http://vibration.desy.de Same equipment and data analysis tools are applied to each case; Therefore, direct comparison is possible This work will continue albeit with a lower priority, often combined with other measurements Publications: presentations in Nanobeam2005 (EuroTeV report-2005-023) and EPAC06 contribution, in preparation Power spectral densities for five measured sites

A fit to the power spectral density of Petra (preliminary) Metrology: site characterization via parameterization (in collaboration with D. Kruecker (DESY)) & Correlations Parameterization of power spectral densities measured, reperesenting ‘noisy’, ‘quiet’ and ‘medium’ sites; This is done via root; Starting model is obtained from V. Shiltsev et al, DESY HERA 95-06 Measurement of correlation length of a few sites, including DESY Study of floor motion (a civil engineering issue) as opposed to ambient ground motion (influenced by geology in each site) A fit to the power spectral density of Petra (preliminary)

EuroTeV report 2006-020 submitted to ALBA & MAXLab Stability of accelerator components; case study: MAXLab (Lund) girder Study of support structures, e.g. girders is important for the stability of the cryomodules in the ILC; MaxLab girder measurements (visit funded by ALBA) EuroTeV report 2006-020 submitted to ALBA & MAXLab Vertical vibration measurement via a seismometer, transfer function girder/ground ~1.2 @ 1 Hz

Stability of accelerator components; case study: MAXLab (Lund) girder Horizontal vibration (longitudinal to the beam direction) measurement via geophones, Resonance: ~28-30 Hz, transfer function, girder/ground~2 @ 1.7 Hz Horizontal vibration (transverse to the beam direction) measurement via a seismometer, resonances: ~15-16 & 30 Hz, transfer function, girder/ground ~2 @ 1 Hz Conclusion: MaxLAB girder is stable vertically, but not horizontally; A better girder design should be pursued in the horizontal direction.

Stability of accelerator components: Measurement of the stability of a ‘warm’ cryomodule (Type II Superstruktur) 2 Seismometers, one on the vessel top, the other, on the ground; simultaneous geophone measurements Sensor SM-6 vertical geophone placed on the cryostat With quadrupole (back view) Seismometer Güralp CMG-6TD inside Helium Gas Return Pipe (GRP)

Stability of accelerator components: Measurement of the stability of a ‘warm’ cryomodule (Type II Superstruktur) Helium pipe (vertical) to the cryostat Helium pipe Integrated vertical vibration for f > 1 Hz as measured via geophones of Helium pipe vs. quadrupole, amplification @ 1 Hz: Quad/Helium~1.06 or ~10% Connection from the Helium pipe to the quad is rigid within 10% Quadrupole support structure (shown without the quad) EuroTeV report & EPAC06 contribution (in preparation)

Vessel top to Helium pipe (transverse to the beam direction) Stability of accelerator components: Measurement of the stability of a ‘warm’ cryomodule (Type II Superstruktur) Vessel top to Helium pipe (transverse to the beam direction) PSD in transverse direction to the beam pipe as measured via seismometers, Vessel top vs. Helium pipe Integrated transverse vibration for f > 1 Hz as measured via seismometers, amplification @ 1 Hz: Top/Helium~1.22, or ~22%

Ground to vessel top (transverse to the beam direction) Stability of accelerator components: Measurement of the stability of a ‘warm’ cryomodule (Type II Superstruktur) Ground to vessel top (transverse to the beam direction) Integrated transverse vibration for f > 1 Hz as measured via seismometers, amplification @ 1 Hz: Top/Ground~ 10 PSD in transverse direction to the beam pipe as measured via seismometers, Vessel top vs. Ground, Vessel resonances: ~4.3, 8.0, 9.0 Hz; vessel rocks due to bad girder support (in this case concrete slabs) & steel pads Amplification factor for Ground/Quad = Top/Ground*Helium/Top*Quad/Helium=10.0*0.80*1.06= 8.48 ~10

Cold mass test plan Motivation: Evaluate the rigidity of the quad supporting structure to confirm 1:1 vessel to quad transfer function (in warm and cold) Evaluate quantitatively return He-flow contribution, perhaps with different flow rates Use the same setup to test other interferometric position sensors (Oxford ) & POLYTEC Technique: Place two 'mirrors‘ directly on the cold quadrupole He vessel Measure their motion with respect to a reference frame by means of a laser interferometer (self-calibrated, sub-nanometer resolution etc.); measure the frame motion with a seismometer Use different reference frames can provide different information and offer data-quality check Reference frames: ground, inertial platform, cryomodule vessel (essential to measure small amplitude differences, otherwise the vessel rocking modes dominate the dynamics)

Type III+ cryomodule with the proposed modifications front view side view bottom view Figures: courtesy of C. Engling (DESY, MKS)