ELENA Beam Transfer Workpackage

Slides:



Advertisements
Similar presentations
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Advertisements

September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
FCC-hh Injection and Extraction
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Daniel Schoerling TE-MSC-MNC 1 Magnets Daniel Schoerling on behalf of WP 2.2 and WP 2.16 ELENA Project Review 14 th – 15 th October IT.
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
1 1. Some recent views ( ) 2 Linac tunnel
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
WBS2.11 Vacuum systems G.Vandoni …brainstorming presentation… VAT Technical & Scientific7 th July 2008.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Wim Weterings Remy Noulibos
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
ELENA Integration F. Butin / ELENA collaboration.
Report Technical Director Storage-Ring-Installation Completed
Vacuum System P. Chiggiato TE-VSC
Linac4-PSB 160 MeV connection readiness review
Phase Feed-Forward Piotr Skowroński (CERN)
Integration of the e+ elements
ELENA installation and commissioning status
Installations up to Start of Commissioning
Options and Recommendations for TL and Dumps
CLEX* Status and Plans CTF3 complex CLEX
LIU – EVM status and next steps
Configuration Management and Layout Database ELENA Project
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
The ELENA BPM System. Status and Plans.
The ELENA Safety Documentation «time to prepare the safety clearance»
TE-ABT Activities for LS2
M.Jonker CTC MPO-WG status
C.Carli Budget and Planning ELENA Project Review, 15th October 2013
Renovation of the 45-year old PS magnets
WP11: electron and proton beam testing
WPs concerned by L4 connection:
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Interlocking of CNGS (and other high intensity beams) at the SPS
LHC Injection and Dump Protection
ELENA Extra Low ENergy Antiproton Ring
Advanced Research Electron Accelerator Laboratory
ThomX – Commissioning Meeting – 25/01/2018
Laser Und XFEL.EU Experiment
East Hall under construction
AD Electron Cooler Consolidation Review
Presentation transcript:

ELENA Beam Transfer Workpackage W. Bartmann ELENA TL Workshop, 25-Jan-12

Elena TL Workshop, 25-Jan-12 Outline Experiments’ wishes Beam Transfer WP and interfaces to other WPs Collaborations Timeline wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12

Elena TL Workshop, 25-Jan-12 Experiments’ wishes ALPHA (Eoin Butler): Important is number of antiprotons on target, not only high number but also stable Beamsize at target: 0.5 mm in diameter Shot-to-shot reproducibility of few tens of microns over 8 hours For longitudinal capture bunches of maximum 300 ns length Tunability of transverse position required for long term drifts ASACUSA (Masaki Hori): Beam spot of 5 mm No shot-to-shot changes required wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12

Beam Transfer WP and Interfaces to other WPs SCOPE WHAT WHO/INTERFACE Coordination Wolfgang Bartmann Deliverables Manpower Budget Schedule Collaboration Optics Wolfgang Bartmann, ABT-BTP Requirements and constraints Injection, Extraction calculations Geometry of lines Optics calculations Switch specification Sensitivity to time varying magnetic fields Trajectory correction Aperture specification Frozen optics design HW specification wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12

Elena TL Workshop, 25-Jan-12 SCOPE WHAT WHO/INTERFACE to other WP Magnets Thomas Zickler, Daniel Schoerling AD to ELENA TL magnets covered in Magnet WP Recuperation, refurbishment Design (shielding) Tendering Fabrication Preparation (incl vacuum chambers) Magnet surveillance, controls and expert applications Injection/ejection kicker Luc Sermeus Possible shorter magnetic kicker Possible electrostatic kicker Possible fast pulsed switch Injection/ejection septa Jan Borburgh Septum spare Possible electrostatic septum Deliverables Magnets ready for installation Expert applications ready Related drawings released wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12

Elena TL Workshop, 25-Jan-12 SCOPE WHAT WHO/INTERFACE Electrostatic lenses/deflectors Daniel Barna, Masaki Hori Design (shielding) Prototyping Fabrication Preparation (incl vacuum chambers) Surveillance and controls and expert applications Deliverables HW ready for installation Expert applications ready Related drawings released Power converters David Nisbet Recuperation Design Tendering Preparation for installation (Cabling, shielding) Controls and expert applications wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12

TL Workpackage Structure SCOPE WHAT WHO/INTERFACE Beam instrumentation Gerard Tranquille, Masaki Hori + University of Tokyo Profile monitors, Cherenkov counters Beam transformer, Aluminium activation Recuperation of existing equipment Design Fabrication Preparation for installation Controls and expert applications Deliverables HW ready for installation Expert applications ready Related drawings released Vacuum Roberto Kersevan Refurbishment of existing chambers Chamber design (EM shielding) Gauges Pumping Controls and expert application Vacuum chambers for bends/quads delivered for bends/quads assembly Chambers (outside bends/quads) ready for installation

TL Workpackage Structure SCOPE WHAT WHO/INTERFACE Controls Matthieu Cattin Deliverables HW (servers, memory, consoles,...) SW (logging, applications,...) Interlocks Bruno Puccio Design studies/drawings Diego Perini All equipment drawings in DB All beamline drawings in DB Transport Serge Pelletier RP Joachim Vollaire Monitoring Cables ? Check existing cables Recuperation Power cable order Controls cable order Drawings and integration Cable installation Cables ready for installation Related drawings released

TL Workpackage Structure SCOPE WHAT WHO/INTERFACE General safety Horst Breuker Access, smoke alarm,... Survey Tobias Dobers Beam stopper check if needed ? Installation Nicolas Gilbert Dismantling Pre-installation cleaning Safety equipment installation Cooling/ventilation installation Cable and EL installation Magnet installation BI installation Vaccuum system installation Post-installation cleaning Beam transfer commissioning Wolfgang Bartmann, ABT, Tommy Eriksson Commissioning procedure Operation Tommy Eriksson Applications SW Operation Procedures Interface Experiments-TLs

Elena TL Workshop, 25-Jan-12 Timeline wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12

Additional time constraints TL(s) between commissioning source and ELENA should be ready for ELENA ring commissioning installation during 2014 together with ring installation TL for Gbar decelerator test stand with antiprotons as soon as antiprotons available from ELENA installation during ELENA commissioning? wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12

Elena TL Workshop, 25-Jan-12 Collaboration Proposal from Masaki Hori for electrostatic devices and profile monitors Mechanical design of electrostatic beamline elements Construction of electrostatic beamline elements Test of electrostatic beamline elements with 100 keV beam, and vacuum leak tests etc. Mechanical design of beam profile monitors Construction of beam profile monitors Test of beam profile monitors with 100 keV beams. Control software writing for beam profile monitors compatible with CERN PS control system Design of most types of VME64x control electronics according to the CERN PS control systems standard FPGA based software and hardware design work More than 7 MY equivalent Already ongoing: Advanced prototype for profile monitor New quadrupole triplet for 130 keV antiprotons in ASACUSA beam line with the plan of having beam in 2012 wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12

Potential further collaboration Development project for SIGMAPHI with partial support from the Bretagne Council Bretagne Council could cover 45% (max 300k€) for design, R&D and realization of a prototype (further devices of same type NOT included) Fast pulsed electrostatic device for extraction or switchyard identified as possible candidate Technical description will be provided by ABT wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12

Elena TL Workshop, 25-Jan-12 Summary Experiments’ wishes need to be completed WP structure and interfaces to other workpackages need possibly refinement Time constraints are challenging – in particular in view of earlier installation for source and Gbar test stand Collaboration for electrostatic devices and beam profile monitor ongoing Further collaboration to be discussed wolfgang.bartmann@cern.ch Elena TL Workshop, 25-Jan-12