BWI Roundtable Presentation

Slides:



Advertisements
Similar presentations
Have you ever wondered how an aircraft can find a specific airport in a highly populated airspace?
Advertisements

Instrument Approach Charts
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
1 #4295. Which frequency should you expect to use for Regional Approach Control, control tower, and ground control respectively at DFW when coming from.
Navigational Systems.
#4407. When may ATC request a detailed report of an emergency even though a rule has not been violated? A- When priority has been given. B- Anytime an.
Instrument Ground Training Module 4 & 5
Washington DC Metroplex March 5, 2015 Implementation.
Approach Charts and Procedures
VISUAL APPROACHES.
Standard Terminal Arrival Routes STARs
Localizer Approaches This presentation assumes you have reviewed the ILS presentation first.
Letting Time Pass By - How to Hold.
#4918. When an airplane is accelerated, some attitude indicators will precess and incorrectly indicate a A- climb. B- descent. C- right turn.
Circle to Land.
AIR TRAFFIC ROUTES.
Lecture 12:Approach Lighting System
Stabilized Constant Descent Angle NPA’s
#4773. When tracking inbound on the localizer, which of the following is the proper procedure regarding drift corrections? A- Drift corrections should.
ILS Instrument Landing System
Chapter 6 Section A. STAR Standard Terminal Arrival Route –Depart the enroute structure –Navigate to destination –Terminate with an instrument approach.
Basic Indoctrination Navigation 2 HOURS
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
US IL Flying Club June 1 st, VERSION 4.
Lecture 2: AIRSIDE PART 2 By: Zuliana Ismail.
Advanced Holding Patterns Christian Pezalla ATP, CFII.
Joining RNAV Approaches at a fix or waypoint Prepared by John D. Collins CFI/CFII.
Review Chapter 4-8. Departure and Arrival Charts DPs, STARs and visual approaches are routinely assigned by ATC DPs and STARs are issued to simplify clearance.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Advanced Holding Patterns
Potential Safety Benefits of RNP Approach Procedures
Arrival Charts and Procedures
Navigation Technology
Final approach Instrument landing system
 Today we will discuss what a hold is exactly, what is the purpose how to perform it and all the considerations and elements involved with the procedure.
RANGING & LANDING SYSTEMS VHF Omnirange –VOR receiver principles The VHF Omni-directional Radio Range is the abbreviations for which are ‘VOR’ and ‘Omni’,
Vertical, lateral separations based on time / distance
FAA NAVAID Rationalization / Resiliency Overview
Holding Procedures.
INSTRUMENT DEPARTURE PROCEDURES JAN MAR 2003
FAA Flight Standards AFS-220/430 FPAW 2017 Summer
AIR TRAFFIC ONTROL.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
INSTRUMENT LANDING SYSTEM
PlaneWrong AGM Thursday 13th October
CGS Ground School Pilot navigation ATC procedures
Airports, Airspace, & Radio Communication
Civil Air Patrol – California Wing Visual Search Patterns and Procedures Mission Scanner Course Chapter 10 Version 1.2 (1 March 2014)
Microwave Landing System (MLS)
Approach Procedures.
Real Life Training Scenario
SIDs explained simply For the rest of us..
OPERATIONS ON PARALLEL OR NEAR-PARALLEL RUNWAYS
longitudinal separations based on time / distance
DJ de Nysschen Wonderboom Air Traffic Control
Association of California Airports Instrument Flight Procedures
SEPARATION Module 1, Topic 1.
UNIT -4 AERODROME DATA.
Kabul RNAV Visual & RNP-AR Process & Benefits
Instrument Landing System and Microwave Landing System
Flight Navigation and Planning
Radio Navigation.
Instrument Landing Systems
Welcome to the IMC Club Meeting
Welcome to the IMC Club Meeting
Welcome to the IMC Club Meeting
Precision Runway Monitor (PRM)
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
ATC Clearances Chapter 3 Section C.
Presentation transcript:

BWI Roundtable Presentation July 18, 2017

TERPZ6 RNAV DEPARTURE Criteria: From Runway 28, climb heading 285 to intercept course 297 to WONCE then on track to 283 to cross TERPZ at or above 11,000. Heading 297 to WONCE provides separation between Westbound departures and southbound departures allowing increased efficiency at the airport. Each aircraft flying this Departure Procedure flies the same exact track, but altitudes may differ depending on wind, temperature and type of aircraft.

TERPZ6 RNAV DEPARTURE Criteria: From Runway 15R, climb heading 155 to 850 feet then right turn to SARLY, then on track of 288 to WONCE… Provides automated turn in which aircraft turns itself to the heading, prior to NEXGEN, rather than relying on controller instruction. Provides built in separation with Runway 10 arrival aircraft approaching from the south of BWI. Timing of the turn to SARLY is based on altitude and not DME.

Instrument Landing System (ILS) Runway 33L Criteria: Provides lateral and vertical guidance to aircraft landing on a specific runway. ILS is based on Ground Radio Signals. Includes a Localizer Signal (Lateral Guidance) and a Glide Slope Signal (Vertical Guidance). All altitudes indicated on the Approach Chart are Glide Slope Intercept altitudes. If not at that altitude, aircraft is either above or below stable approach glide path. If the aircraft is NOT on the Localizer, the aircraft will either be left or right of the runway.

Visual Approaches Runway 33L Criteria: Once cleared for a Visual Approach, pilots are allowed to navigate (laterally and vertically) on their own to the runway as long as they continue on a direct path as their last assigned heading (No reverse course). Controllers responsibility for separation from terrain transfers to the pilot Pilots will use the ILS system as a backup to verify the visual approach. Knowing this, prior to the visual approach clearance, controllers turn aircraft toward the landing runway by using headings or fixes on the approach path

RNAV (RNP) Z Runway 33L Criteria: Controllers turn aircraft to certain points to join the procedure. Once at that point, the aircraft takes over via automation and flies itself to the runway. Provides lateral and vertical guidance. Difficult procedure to use when sequencing other aircraft from other locations. Mirrors a visual approach from the North of BWI, but is flown via automation.