David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009 EMC BW Endcap.

Slides:



Advertisements
Similar presentations
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Advertisements

SHEAR IN BEAMS. SHEAR IN BEAMS Example (4.1): A rectangular beam has the dimensions shown in Figure 4.12.a and is loaded with a 40 ton concentrated.
PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro HIM / Mainz University OLYMPUS Collaboration.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Mapping separation power Klaus Götzen GSI Darmstadt PID TAG Meeting 15. Feb
Mechanical Designs of The Central Detector Jinyu Fu
6- Calculation of shear stress at composite interface: A)Under service load: Strain and stress distributions across composite beam cross- section, under.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
PANDA Collaboration Meeting D. Rodríguez Piñeiro SciTil and Next Steps.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Preliminary FEA Results PH-DT Engineering Office, CERN 24/04/2015 Page 1 CERN, April 2015.
XXXIX PANDA COLLABORATION MEETING GSI-DECEMBER 2011 B. GIRAUDO / D. ORECCHINI CENTRAL SUPPORT FRAME STRUCTURAL ANALYSIS FIRST APPROACH AND PRELIMINARY.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
MESF593 Finite Element Methods
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Status of the PANDA Magnet Yoke Presented by E. Koshurnikov GSI, June 26, 2013.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
1)– CENTRAL TRACKER INTEGRATED ITEMS: > Central Tracker, “Assembly & Insertion Auxiliary Structure”. > “CSF”- Central Tracker Support Frame (In collaboration.
Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
PANDA Magnet Iron Yoke Strength Analysis
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Present status of the flux return yoke design
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
PANDA Yoke of the Magnet
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
PANDA Mechanical Design
cooling and supports of the forward endcap EMC
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
Cosq configuration - Mechanics
IHEP group Shashlyk activity towards TDR
Status of the PANDA Magnet
Actual Dimensions in the Forward Spectrometer
EMC BWE PANDA Insertion
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
By Arsalan Jamialahmadi
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Area of a rectangle Tuesday, 05 February 2019 Definition:
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Status of the PANDA Solenoid Magnet Production in BINP
Inner DET. Integration Inner detector envelope Radial clearances.
as a prototype for Super c-tau factory
BGC Collaboration Meeting –
Presentation transcript:

David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009 EMC BW Endcap

1.– Extension of BW Endcap in Z Direction 2.– Support Structure Backward Endcap EMC 1.– Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Extension of BW Endcap in Z Direction Backward Endcap EMC Extension of BW Endcap in Z Direction 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Flange, Batch Panel… It extends further backwards as compared to official drawings 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Extension of BW Endcap in Z Direction Backward Endcap EMC Extension of BW Endcap in Z Direction 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary EMC BW Endcap Beam Pipe Flange 150 Flange, Batch Panel… 160 According with Beam Pipe people flange at 150 mm from STT frame, i.e. downstream BW endcap 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Support Structure (I) Backward Endcap EMC DIN 1025-IPB360-1.0112 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary profile Dimensions (mm) Section Weight H B s e r (cm2) (Kg/m) IPB 100 100 6 10 12 26,0 20,9 DIN 1025-IPB360-1.0112 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Support Structure (II) Backward Endcap EMC Support Structure (II) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary - Fixed with whole assembly - Order installation/ desensitization - Cylindrical space upstream - Interaction with beam pipe 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Support Structure (III) Backward Endcap EMC Support Structure (III) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Support Structure (IV) Backward Endcap EMC Support Structure (IV) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Too Tight Placing the pump further 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Support Structure (V.a) Backward Endcap EMC Support Structure (V.a) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Ansys Stress Analysis 1 Ton Max Stress: 26,14 MPa Steel: Safety factor = 10 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Support Structure (V.b) Backward Endcap EMC Support Structure (V.b) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Ansys Deformation Analysis Vertical displacement 0,8 mm 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Tracking Supplies (I) Backward Endcap EMC 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Tracking Supplies (II) Backward Endcap EMC Tracking Supplies (II) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Held by 4 rollers in the common rail Available area = = 4x1350 = = 5400 mm2 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Tracking Supplies (III.a) Backward Endcap EMC Tracking Supplies (III.a) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Ansys Stress Analysis 3 mm Polyethylene 5.8 Max Stress: 4,29 MPa Polyethylene: Safety factor > 5 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Tracking Supplies (III.b) Backward Endcap EMC Tracking Supplies (III.b) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Ansys Deformation Analysis 3 mm Polyethylene Max deformation < 1 mm 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Tracking Supplies (IV.a) Backward Endcap EMC Tracking Supplies (IV.a) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Ansys Stress Analysis 1 mm Aluminium 4.24 Max Stress: 66,04 MPa Aluminium: Safety factor > 4 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Tracking Supplies (IV.b) Backward Endcap EMC Tracking Supplies (IV.b) 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Ansys Stress Analysis 1 mm Aluminium Max deformation < 0,5 mm 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

ToF Supplies (I) Backward Endcap EMC Space Reserved for ToF Supplies 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Space Reserved for ToF Supplies Gross Area > 16000 mm2 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

ToF Supplies (II) Backward Endcap EMC 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary ñ Integrate ToF supplies Support into DIRC and Tracking Support 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

ToF & Tracking Supplies Backward Endcap EMC ToF & Tracking Supplies 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Posibility to switch the spaces for Tracking and ToF, depending on the needed area. Area up down smaller due to the rails 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

MVD Supplies (I) Backward Endcap EMC New proposal: Rectangular Shape 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary New proposal: Rectangular Shape 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

MVD Supplies (II) Backward Endcap EMC Better use of the space 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Better use of the space Easier and safer insulation system 24 crystals gain! MVD Demand: 44000mm2 With this proposal: Free Area around Beam Pipe for MVD Supplies ~ 50000 mm2 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Summary Backward Endcap EMC 1. – Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary Extension of BW in Z Direction: at least 1000 mm Supporting Structure: Advanced Space for Tracking Supplies: Feasible Space for ToF Supplies: To Be Determined Space for MVD Supplies: Rectangular Solution 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting

Thank you! Personal Contact: Backward Endcap EMC d.rodriguezpineiro@gsi.de Tel: +49 (0) 615971/1634 www-panda.gsi.de 16/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting