Viewport 1, Sep. 26, 2007 Temperature (ºC) on HPU display Primary : 72

Slides:



Advertisements
Similar presentations
Secondary beam analysis – PS and SPS Started May 22, 2012.
Advertisements

DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Robert Cooper
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Output to accelerator area drive laser: MHz, sync’d to master RF = 1064 nm ~7 ps pulses ~10 watts average (~120 nJ/pulse) chopper wheel: ~100Hz,
Particle Detector Waveforms for Shots and T. Tsang BNL (Dec. 17, 2009)
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Optical Diagnostics Hg_jet_meeting, Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no.
Optical Diagnostics T. Tsang, BNL, March 17, 2006 tight environment high radiation area non-serviceable area passive components optics only, no active.
Beam Position Monitors MICE CM Harbin January, 2009.
Viewport 1, Sep. 19, 2007Viewport 1, Sep. 5, 2007 Temperature (ºC) on HPU display Primary : 77 Secondary : 30.
1 Optical Diagnostic Results of MERIT (Mercury Intense Target) Experiment at CERN H. Park, H. Kirk, T.Tsang, K. McDonald, F. Ladeinde NFMCC Meeting Fermilab,
Optical Diagnostics Thomas Tsang, BNL, Oct 20, 2006 tight environment high radiation area non-serviceable area passive components optics only, no active.
Scintillating Fiber Analysis of Secondary Particle Production H.G. Kirk (BNL) August 20, 2008.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Tight environment high radiation area non-serviceable area passive components optics only, no active electronics transmit image through flexible fiber.
Tight environment high radiation area non-serviceable area passive components optics only, no active electronics transmit image through flexible fiber.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
Autocorrelator:.
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics back.
Prototype Mechanical / optical considerations 1.Current LED system performance 2.New APD / Fiber /Strong Back integration scheme.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
Sep 13, 2007CALICE Collaboration Meeting Prague 1 Long term test of LED pulsing  Long LED system stability measurement  Aging of part of optical system.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
DIGITAL FLUOROSCOPY.
MIT runs syn no label No Label was not connected TTL trigger from delay box CH A to syn.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
PLC Counters. Introduction We use timers to measure the elapsed time between two events. With retentive timers the “run” signal can be turned on and off.
Preshower/Crack Upgrade Update Detector overview 2.W electron data 3.Simulation overview 4.Early tests of new simulation.
Plastic scintillators for the g-RISING experiments Nami Saito.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Progress in Chamber Simulation Experiments At UCSD Laser Facility Farrokh Najmabadi and Kevin Sequoia HAPL Meeting February 5-6, 2004 Georgia Institute.
Supervisor: Samir Arfaoui By: Fatma Helal Sawy
Development of Multi-Pixel Photon Counters(MPPC) Makoto Taguchi Kyoto University.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics transmit.
The Lead Glass Detector Overview, Experience and Direction.
Mike AlbrowFP420 – May Timing and Pile-up Considerations 1 Pile-up in trigger and pile-up off-line (HLT) very different issues. Here I consider.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
TRIGGER & T0 for RUN 2016 V. Yurevich meeting CAEN digitizer T0.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
9530 T IMING C ONTROL U NIT Features TCU-1 Key Features 250ps timing resolution with < 50ps jitter 8 independent outputs with full individual programming.
Testbeam Planning Common to all testbeams:
VCSEL-980nm Test for RMD 4 mm2 APD Changguo Lu Princeton U Feb 8, 2013
Minimum Bias Trigger Scintillators
MoNA detector physics How to detect neutrons. Thomas Baumann NSCL.
Oct 4, :00 after 0.5 hrs TT2 tunnel access
MINOS and Me D. Jason Koskinen
Beam instrumentation for the upcoming TIDVG#5
F.Guber, A.Ivashkin INR, Moscow
Gamma-ray Large Area Space Telescope
Damping Ring Kicker Tests at AØ
FPGA Based Trigger System for the Klystron Department
Signal processing Lecture: Hans-Jürgen Wollersheim
Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN)
Probing deeper into matter …
Beam dynamics requirements after LS2
1st Hg jet run with pulsed solenoid
Wavewin Sniffer 24 Configuration & Polling Software
TOF & BB FEE Safety Review
R&D of MPPC in kyoto M.taguchi.
Ch. 6 Looking Through the Viewfinder
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Calorimeter Upgrade The Tevatron and Dzero Upgrades
Digital Circuits for Photon-Counting Pixel Detectors
Presentation transcript:

Viewport 1, Sep. 26, 2007 Temperature (ºC) on HPU display Primary : 72 Secondary : 29

Viewport 2, Sep. 26, 2007

Viewport 3, Sep. 26, 2007

Viewport 4, Sep. 26, 2007

Scope Trace @ No Beam CH1 : B, AvTech LD pulse input CH2 : A, SMD trigger CH3 : Scintillating fiber CH4 : To, Master trigger

Shot 1, Only Triggering, No Detector Responded

Shot 2

Shot 3

Shot 4 ~ 0.004 ms

Shot 5 ~ - 0.001 ms ~ ± 3V level

CONFIRMATION NEAR FIELD DETECTOR DOES WORK. ALL SYSTEM RESPONDED TO THE 5 TIMES OF BEAM RUNNING SUCCESSFULLY. WHAT DOES SIGNAL LEVEL MEAN ?? HOW TO CALIBRATE THE AMOUNT ?? TRIGGERING SIGNAL TO OPTICS ARRIVES ~0.001 MS LATER THAN THE BEAM ARRIVAL.  THE MINIMUM REQUIRED DELAY OF TRIGGERING SIGNAL FROM PS IS ~ 0.006 MS INCLUDING ELECTRONICS DELAY ASSUMING SMD CAMERA STARTS CAPTURING THE FIRST FRAME FROM THE TIME THAT BEAM ARRIVES. ALL OTPICS AND CAMERAS DOES WORK SIMULTANEOUSLY ONCE THE TRIGGERING SIGNAL ARRIVES FROM PS.