Woodland Public Schools

Slides:



Advertisements
Similar presentations
RESTAURANT SAFETY. Emergency Exits Meeting location.
Advertisements

Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Capital Program Update Maintenance Garage On schedule - Final Completion is May 19, 2007 but the District needs to move in April because the.
January – May 2013 Existing Curriculum and Space Needs Summary Facilities staff meets individually with all school principals, as well as Academics and.
Auburn University Facilities Prioritization Process Each college will submit up to five projects annually – Ten this first year Projects must cost $50,
Retirement Home Regulated under the Retirement Home Act, 2010.
BUILD WITH US. ™ Contractors
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
School Construction Plan Review What you need to know.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Fire Prevention “ Cover the Bases & Strike Out Fire”
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Lab Safety and Emergency Procedures. The Number One Rule In All Emergency Situations Don’t Panic, Move Quickly and Quietly.
Burson Building Renovation Overview of Project Needs Department of Chemistry Sherman L. Burson, Jr. December 24, 1923 – December 3, 2012 Bernadette Donovan-Merkert,
Improvements to a recreation center near you Julia DelNero.
Safety in the Agricultural Mechanics Shop #1 Agenda Warm-up Announcements Assignment Notes Square foot per person Safety worksheet #1.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Concepts of Engineering and Technology Safety In the Classroom and How it Compares to Safety in the Workplace Copyright © Texas Education Agency, 2012.
Woodland Public Schools Facilities and Safety Report For April 2016.
School of Materials Science & Engineering Georgia Institute of Technology.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Woodland Public Schools Facilities and Safety Report For September 2016.
Preparation of the Self-Study and Documentation
Submitting a Proposal This document will guide you through submitting a proposal to Carnegie Corporation of New York. Access the form Access Carnegie Corporation.
Ethernet Switch Replacement
Woodland Public Schools
What Defines a Project? The cost of work, services or purchase is $5,000 or above and falls into the following categories: Alterations to existing space.
EMERGENCY OPERATIONS PLANS
Woodland Public Schools
FIRE PROTECTION & SECURITY in ELI Beamlines
Woodland Public Schools
College Application Processing at IHA
Knead Dough? Performance Measurement Can Leaven Your Budget
Senior Staff Meeting November 12, 2008
School #1 Ballot Question and Proposal
FLOWSHEET FOR APPEALS Application for appeal received
29 CFR Part 1917 Subpart E Personal Protection.
Share the Pennies Home Weatherization Program
Plant Operations Director
Overview Background UPS Operational Policy TC 4
Emergency Action Plan.
Woodland Public Schools
Woodland Public Schools
The Catholic University of America
Timber Products Manufacturers Association
Electrical Receptacle Testing
How do we carry out the election process last year?
SAFETY First.
Having Your Visit on a Computer
Progress Report 11/10/11.
Facilities Modernization Program
AGA Best Practices Kick Off Meeting Los Angeles January 17, 2012
General Safety Danielle Kriminger RNC, BSN Cheatham County Central HS
Safety In the Science Lab
New Hire Orientation System Office Services Steven Juengling, Manager
FIRE SAFETY At Work and Home
Mount Vernon Community School
EC Monday Meeting Report November 14, 2005 Vancouver, BC, CA
Carleton College Facilities Management
Employee Presentation #1 Security Overview and ID Cards
WI Act 185 Implementation Update
‘BOAT CHART’ PROJECT WORKPLAN
Timeline Overview Planned Timescales
Presentation transcript:

Woodland Public Schools Facilities and Safety Report November 2016

FACILITIES REPORT Combustable Gas detectors – I have been working with Cascade natural Gas’s subcontractor getting a proposal to install a combustible gas detector system for WMS. Most of the schools use natural gas for heating water and distributing the water to HVAC equipment through out the schools. WMS is a unique in that all of the classrooms use natural gas to heat the rooms through an indirect heat exchanger. This requires natural gas to be plumbed the length of the yellow and green halls directly above the rooms. This installation requires multiple mechanical joints and flexible connections in the attic space directly above the rooms. This system will detect a leak and alarm to the WMS office forcing an evacuation of the school. The system will also be capable of isolating the gas supply to the school should a leak develop. Emergency Action plan – I am waiting for the reunification Memorandum of Understanding (MOU’s) before issuing the plan to the Superintendent. Once these documents are receive a final edit will be completed and the plan will be submitted. Card Key Access System – All final proposals have been received for the card key access systems for WPS, WIS, WMS. A final review of the proposals is in progress. A recommendation letter will be submitted to the board for financial approval. System installation is approximately 6-8 weeks and if all goes smoothly, I would expect the system to go live at spring break.  

FACILITY CHARTS – POWER COST AND WORK ORDER STATUS

FACILITY CHARTS – WATER USAGE, WHS, WIS, WMS, WPS Water bills are issued every two months. Next update on these graphs will be in January (Decembers report)

SAFETY Accidents for the month There were a total of 11 injuries in the month of November 3 students and 8 staff members. Staff Accidents/Incidents (8) WPS – Student kicked and hit employee WPS – Student kicked IA multiple times WPS – Student threw chair at teacher WPS – Student hit employee in the arm WPS – Student bit IA WPS – Student struck IA in face and pulled her hair WIS – Employee slipped on wet floor WPS – Employee slipped on wet floor Student Accidents/injuries WPS – Student received head injury from play equipment (student was pushed) WPS – Student slipped on wet floor WHS – Student dropped bench on foot

SAFETY CHARTS