QUBIC Meeting MDP Sept LAL - Orsay

Slides:



Advertisements
Similar presentations
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 iBTF module Prototyping Version.
Advertisements

TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
PACS IIDR 01/02 Mar 2001 Baffle and Straylight1 D. Kampf KAYSER-THREDE.
FLAO Alignment Procedures G. Brusa, S. Esposito FLAO system external review, Florence, 30/31 March 2009.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
An Introduction to mini-SONG Project Xiaojun Jiang Natioanl Astronomical Observatories Chinese Academy of Sciences.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Eusoballoon optics characterisation Camille Catalano and the Toulouse team Test configuration Calibration of the beam Exploration of the focal plan.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Chapter 23 Mirrors and Lenses.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Eusoballoon optics test Baptiste Mot, Gilles Roudil, Camille Catalano, Peter von Ballmoos Test configuration Calibration of the light beam Exploration.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
January 25, 2005GRETINA 2004 Review1 GRETINA 2004 Annual Review Steve Virostek Lawrence Berkeley National Lab Mechanical System.
The Active Optics System S. Thomas and the AO team.
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
14FEB2005/KWCAE2-UsersGroup Astro-E2 X-Ray Telescopes XRT Setup & Structure Performance Characteristics –Effective Area –Angular Resolution –Optical Axes.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
SRI 2007: CLS Optical Metrology Facility- Overview
Cryostat sub-system for QUBIC
Filters sub-system for QUBIC
B. Humensky 2/24/2012 CTA-SCT Mtg - SLAC
Micro-focus Adjustment
Internal CDR meeting December 20th, 2005
Lab 1 Paraxial Optics Lab in 106A.
Status of the PANDA Magnet mechanics (yoke & cryostat)
STRAW TRACKER SYSTEM CAD STATUS :
LBNF CAD models, Drawings and Component list
l 66TH MEETING OF THE ESRF l May 2014 l Author
TEST MODULE WG Cradles for CLIC module supporting system
Workshop on Tau-Charm at High Luminosity
INSTALLATION SEQUENCE
IR Detector - Test cryostat : Machining
R. Kersevan, TE-VSC-VSM 30/06/2016
Detectors sub-system for QUBIC
LumiCal mechanical design, integration with LDC and laser alignment
Karl Young, Shaul Hanany, Neil Trappe, Darragh McCarthy
Integration Plan for the
HPS Collaboration meeting, JLAB, Nov 16, 2016
Graphic Communication
Progress on 1.8m Telescope with 127-element Adaptive Optics at IOE
Feed horn array sub-system for QUBIC
Henry Heetderks Space Sciences Laboratory, UCB
David Burke Maynooth University Department of Experimental Physics
Assembly Modeling Constraints
SPICA / FPI Mechanical /Optical Issues
PS magnet status D Bodart 25/06/2019.
Presentation transcript:

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC Optics Baffling & Combiner tests Marco De Petris “Sapienza” University , Rome, Italy Department of Physics QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

Sub-systems for QUBIC: Shielding (baffling) & Combiner tests QUBIC: Optics Sub-systems for QUBIC: Shielding (baffling) & Combiner tests For Technological Demonstrator (T.D.) And For Final Instrument (F.I.) QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Annex 1: list of main-sub-system and WP leaders QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Shielding Current shielding baseline ForeBaffle (FB) conical shape 1 meter height aperture angle 14 degrees (FWHM) flared edge with curvature radius 50mm base diameter 350 mm absorbing inner surface (Acknowledgment NIKHEF/TNO) Ground Shield (GS) G. D’Alessandro conical shape (TBC, petals?) aperture angle 45 degrees flared edge with curvature radius 50mm base diameter 3 m (TBC, see cryostat mount and experimental module) reflecting inner surface QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Shielding Current Forebaffle: preliminary drawings Height 1 m aperture 28 deg A. Pelosi INFN RM1 QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Shielding Current Ground Shield: preliminary drawings 6m in outer dia. 6m inner dia. 3m aperture 90 deg 18 petals A. Pelosi INFN RM1 QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Shielding Current Ground Shield: preliminary drawings 4 flanges to install the shield on the ground/roof TBD ... under discussion with GEMA A. Pelosi INFN RM1 QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC: Optics Current Ground Shield: preliminary structural analysis Shielding Current Ground Shield: preliminary structural analysis wind 25 m/s max total deformation 1mm max wind velox @Chorillos credits C. Medina A. Zullo INFN RM1 QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Shielding Current Ground Shield: preliminary structural analysis max x-axis deformation = 0.7mm max Von-Mises stress = 30 MPa A. Zullo INFN RM1 QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Current Ground Shield: preliminary structural analysis After choosing the elevation axis (see GEMA mount/laboratory roof): re-model beam pattern with correct FB and GS positions [GS geometry could consistently change] After the change of the observation site (DC -> Chorillos): Constraints on the weight, can we relax them? [material (Al) and lightening the ribs] Maximum size component limitations for transportation [from Basler to container?] Some protection on the FB to cover cryostat window in case of necessity or for the whole mount [TBD] QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

Status of the sub-system Shielding blocking points and schedule What is the status of the sub-system ? Design and modeling on going/manufacturing by outside firm/assembly and test @outside firm When is this phase supposed to be finished ? FB (for T.D. and F.I.) and GS (only for F.I.) drawings 12/2016 Forebaffle manufacturing 05/2017, to ship to APC Ground Shield manufacturing 03/2018, to ship to the site (? or APC) If you are still designing the sub-system: Which inputs / specifications / requirements, needed to finish the detailed design of your sub-systems, are not yet delivered ? For T.D. Forebaffle: geometry frozen (reflective inner surface as first version to test performances) For F.I. Ground Shield: geometry to be interfaced with mount/site location and manufacturing cost Which other working group should deliver these inputs (see annex 1 for list of main WP) ? For T.D. no one For F.I. GEMA, IAR, ITEDA, APC What time is still needed in order to (for D.T.) – assume that the above inputs are provided if needed - : Finish the whole detailed design of D.T. ? FB drawings 12/2016 Manufacture the sub-system ? Forebaffle manufacturing 05/2017 - Ground Shield manufacturing 03/2018 Test the sub-system in your premises before delivery to APC / ROMA ? no Idem for F.I. Finish the whole detailed design of D.T. ? GS drawings 12/2016 Manufacture the sub-system ? Ground Shield manufacturing 03/2018 Do you think you can comply to the target schedule (see annex 2) ? It’s dependent on the (INFN?) funds: scheduled time and total amount still in preparation … QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

Interfaces with other sub-systems Forebaffle List and describe needed interfaces with other systems. Mechanical with cryostat Are these interfaces currently frozen ? yes Ground Shield Mechanical with laboratory roof/ground Are these interfaces currently frozen ? no still in preparation … QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

Test, Delivery, Assembly, Calibration Operations Tests of the sub-system in your premises before delivery at APC or ROMA: What is the rationale for testing the sub-systems ? Which specifications will be tested ? What are the criterion for fail / pass ? Delivery to APC or ROMA: Special care needed for the transportation and handling of the goods ? Assembly Operations in APC or/and ROMA: Same questions as first point above. + which other sub-systems should be integrated before yours? After yours ? + Is there any specific material needed for assembly ? (see annex 3 for help) What are the test sequences needed to be performed during/after integration + How many FTE will you send people at APC / ROMA for help during assembly ? Calibration Operations at APC: Same questions as for Assembly operations. still in preparation … QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC: Optics Combiner tests Test of combiner alignment by check the «misalignment» @ 300K Cart to align and to assemble the combiner X-Y translation stages on a mount fixed on the top flange of the «1K box» He-Ne laser secondary mirror @300K primary mirror @300K Comparison of full field spot diagrams with Zemax simulations at 300K QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Test of combiner alignment by check the «misalignment» @ 300K Upgrades since first version (following Claude et al.’s suggestions) Tiltable flange 0°- 60° i.e. elevation 90°-30° exploring operational configs Car taller than before to work more easily on it Fully accessible sides ditto … still to find a solution to support the second flange (the support belt). 1. 4. 2. 3. QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Test of combiner alignment by check the «misalignment» @ 300K A. Pelosi INFN RM1 QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Test of combiner alignment by check the «misalignment» @ 300K 2-axes linear stages 300x300 mm range with He-Ne laser Elev = 90 deg A. Pelosi INFN RM1 QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Test of combiner alignment by check the «misalignment» @ 300K Elev = 30 deg A. Pelosi INFN RM1 UID-GEMA QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Test of combiner alignment by check the «misalignment» @ 300K Alignment setup key components Car to mount the 1K box and to align the combiner (drawings on-going); 2-axes linear stages 300x300 mm range to move He-Ne laser output along secondary horn apertures surface (allocated money from PNRA); 1 screen to be positioned instead of each focal plane array surface (APC?); 1 flat mirror to be installed instead of dichroic also to map the off-axis focal plane (more info needed to draw from Cardiff). QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Steps to integrate the 1K box (+ combiner) inside the cart L. Grandsire/C. Chapron QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Steps to integrate the 1K box (+ combiner) inside the cart Only at this step the 1K box could be mounted inside the current version of the cart L. Grandsire/C. Chapron QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Shall we modify the current version of the cart to start from this flange? Steps to integrate the 1K box (+ combiner) inside the cart L. Grandsire/C. Chapron QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Steps to align the combiner inside the cart 1 STEP: The hexapods, and so the mirrors, have to be tuned to be as near as possible to the nominal positions, before laser alignment procedure (FARO arm or other approaches?) L. Grandsire/C. Chapron QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Steps to align the combiner inside the cart 2 STEP: Insert one screen at the nominal position of the on-axis focal plane array; screen with support to map focal plane footprint ONA_FP L. Grandsire/C. Chapron QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Combiner tests Steps to align the combiner inside the cart 3 STEP: Laser scans at several pointing directions 300K model of combiner with Zemax [GRASP mirrors to be converted in Zemax] Footprints on both focal planes for several incidence angles .. and different elevation angles He-Ne laser secondary mirror @300K primary mirror @300K QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC: Optics Steps to align the combiner inside the cart Combiner tests Steps to align the combiner inside the cart 4 STEP: Move the screen to the nominal position of the off-axis focal plane array; Insert the flat mirror instead of dichroic; STEP 3 again screen with support to map focal plane footprint OFA_FP dichroic flat mirror L. Grandsire/C. Chapron QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

Status of the sub-system Combiner test blocking points and schedule What is the status of the sub-system ? Design on going/manufacturing (home made, i.e. INFN/Dept machine shop)/assembly (in lab) When is this phase supposed to be finished ? 04/2017 If you are still designing the sub-system: Which inputs / specifications / requirements, needed to finish the detailed design of your sub- systems, are not yet delivered ? For T.D. and F.I. Zemax model/ Dichroic -> mirror/screens at focal plane/combiner assembly procedure/FARO arm or other metrology sistems Which other working group should deliver these inputs (see annex 1 for list of main WP) ? For T.D. and F.I. Cardiff/APC/Maynooth/Milano-Bicocca What time is still needed in order to (for D.T.) – assume that the above inputs are provided if needed - : Finish the whole detailed design of T.D./F.I. ? 12/2016 Manufacture the sub-system ? 03/2017 Test the sub-system in your premises before delivery to APC? Yes, to check the laser control Idem for F.I. The combiner test setup is the same for T.D. and for F.I. Do you think you can comply to the target schedule (see annex 2) ? Yes, with PNRA funds still in preparation … QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

Interfaces with other sub-systems Combiner test List and describe needed interfaces with other systems. Mechanical with 1K box Are these interfaces currently frozen ? Under discussion the possibility to interface the cart with two flanges of 1K box still in preparation … QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

Test, Delivery, Assembly, Calibration Operations Tests of the sub-system in your premises before delivery at APC: Assembly the cart and check the laser 2-axes movements control in Rome Delivery to APC : Special care needed for the transportation and handling of the goods ? no Assembly Operations in APC : The cart should be used to assemble the 1K box and to check the consistency of the subsystems to be mounted on it (see focal plane arrays, dichroic, mirrors,..) The cart doesn’t need special tools to be assembled. The combiner test needs: 1 screen as fake focal plane array and 1 flat mirror as fake dichroic. See before + How many FTE will you send people at APC / ROMA for help during assembly ? Calibration Operations at APC: Same questions as for Assembly operations. still in preparation … QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics Thank you QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics CalLamp QUBIC Meeting MDP Sept 27 2016 LAL - Orsay

QUBIC Meeting MDP Sept 27 2016 LAL - Orsay QUBIC: Optics CalLamp Working progress… QUBIC Meeting MDP Sept 27 2016 LAL - Orsay