Austin Bridge & Road Paving the 1st Formula One Purpose Track in the United States The 1st Formula One Track in the World to be 3D Paved In this session,

Slides:



Advertisements
Similar presentations
Road Institute Overview. Volvo Construction Equipment Road Institute Road Institute Overview 2 History  Blaw-Knox established the Road Institute in 1965.
Advertisements

2D vs. 3D Grade Control Systems
Road Design Basic Road Design
County Road Administration Board Presenters: Mike Hasslbauer Technology Solutions Manager Western States Equipment Company
Omercan Barut Dokuz Eylul University Industrial Engineering.
Layout a Project. OVERVIEW Familiarize you with techniques and procedures in staking / laying out a project using an Trimble S6 and R8 GPS – Controlled.
Principles of Paving rev Principles of Paving.
Trimble 2D & 3D Paving Control System for Pavers
1 Asphalt Paving Athletic Surfaces Mike Vinton, CTCB.
Chart Your Course to Business Success On Target Business Intensive: Session 6 May 1, 2012 Advisors On Target 1.
Equipment Setup GCS300 – GCS900 Components Presented By:
Trimble Grade Control Systems for Milling Machines and Cold Planers Presenters name.
Presentation - Date (change on Slide Master) Paver System Five Slope Sensor Theory of Operation.
3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.
PCS900 v1.0 3D Asphalt Paving Sales Presentation.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Manufacturing systems Brian Russell. Exam expectations Issues associated with Manufacturing are regularly tested in the written paper. Questions often.
1 Block 5: Session 3 (Part 1) Organization financial measurement:- The main aim of this section is to introduce you to several ways in which org. attempt.
Marcumllp.com CASH FLOW AND THE RELATED BUSINESS IMPACTS marcumllp.com Presented by: Greg Alford, CPA.
Measuring and Increasing Profit
Introducing Technology Into The Paving Process
General Superintendent
Marketing and the Marketing Concept 1.1
+ WHY KNOWIFY MAKES SENSE FOR GAF FACTORY-CERTIFIED CONTRACTORS
Manager Training Deck: Equip Managers to Conduct Effective Pay Conversations Customization Notes: Please note this deck is intended for you to customize.
The Business Travel Environment
Understanding Supply Chapter 5 Section 1
Real Time Inventory November 2016.
Digital Aerospace and Defense Build, Service, and Fly Better
ACCURATE VIBRATION & SPEED MEASUREMENT
Careers in Construction
Operational Components
Supply Chain Management
Office of Materials and Road Research
Introduction to Economics
SAFE 101 NSC Chapter 22.
VISION Learning Station
CHAPTER 4s Reliability Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
What is Supply? Economics Ch. 5 Section 1.
of our Partners and Customers
Trimble PCS900 Measure-ups using SPS930 UTS and SCS900
About Xperdyte Xperdyte, the software solution tailor-made for the South African Manufacturer. This comprehensive solution addresses all the critical.
CONCRETE PAVEMENTS.
The Importance of ADAS Technology
The Law of Supply and the Supply Curve
Alabama Asphalt Pavement Association
Personal Management Skills
Chapter 36 Financing the Business
Introduction to Production and Manufacturing Systems Gary M. Gaukler
Marketing automation is a very active segment of the CRM software market. Not only are new vendors entering the market, but existing market leaders are.
Engineering Overview Introduction to Engineering Design
Building Competitive advantage through functional level strategies
Technology Experts Panel
Engineering Overview Introduction to Engineering Design
Compressed Natural Gas Supply Vehicles
Motion.
Adam Berwick Head of Procurement Rail & Utilities.
Fields of Engineering Principles of EngineeringTM
International Business
Building Competitive advantage through functional level strategies
Jidoka Tyler Newton OpertMgt 345 Training Presentation “Jidoka”
Engineering Overview.
Engineering Overview.
SAFETY STANDARDS FINAL JEOPARDY
Construction Spring Training 2004 Surveying and Monuments
Missouri Stringless Paving: I-35 Unbonded Concrete Overlay
Mobile Data Collection for Rail Operations Field Personnel
OU BATTLECARD: E-Business Suite Courses and Certifications
Security Orchestration - A Catalyst for MSSP Speed to Market
Industry’s Perspective on Stringless Paving in Iowa: Research, Trials & Implementation Dan King, E.I.T. Iowa Concrete Paving Association.
Presentation transcript:

Austin Bridge & Road Paving the 1st Formula One Purpose Track in the United States The 1st Formula One Track in the World to be 3D Paved In this session, we will present how a contractor has managed to outperform the demanding specifications of the first purpose-built Formula 1 track in the USA using three 3D paving systems. The F1 track represented a highly complex design while prescribing tight elevation and smoothness specifications. This session is intended for the owners, projects managers, surveyors, site supervisors, foremen and operators of general and paving contractors Matthew Hollensworth – Cody Lowery – Mike Ellingson

Integrity Performance Safety Responsibility Employee-Ownership Austin Integrity Performance Safety Responsibility Employee-Ownership About Austin Industries In this session, we will present how a contractor has managed to outperform the demanding specifications of the first purpose-built Formula 1 track in the USA using three 3D paving systems. The F1 track represented a highly complex design while prescribing tight elevation and smoothness specifications. This session is intended for the owners, projects managers, surveyors, site supervisors, foremen and operators of general and paving contractors 100 Years in the industry 25 years of employee-ownership

Heavy highway Aviation Heavy rail Light rail Market Segments Heavy highway Aviation Heavy rail Light rail Site improvements Sub-divisions Tollways Race tracks Long list of customers

Formula 1 Racing About Formula 1

2004 World’s Highest Paid Athlete F1 Car / Driver Michael Schumacher 2004 World’s Highest Paid Athlete Retires in 2012 May want to refer to the “car driving on the ceiling” > 220 MPH 1” – 2” Ground Clearance

2012 Race Circuit Formula 1 Racing Schedule 2012. 1 Season will Feature 20 events in 19 countries across five continents.

COTA Project Data Basic Track Project Data Survey scope all of the complex

Quantities 80,000 tons of flex base placed with 3D paver & 50,000 tons of asphalt base paved with 3D Paver. Remaining course of asphalt placed with averaging beams.

The Layers of the Track Note the 14 Different layers of the Track.

3D Asphalt Paving

Our Strategy to 3D Paving Research available 3D paving products Decide the best fit for our company’s needs Develop procedures and processes for our new paving system (including evaluating, training, and adding the right personnel) Getting the buy in from Dr. Hart Testing, trusting, and trying our new equipment Exceling with our new product What was our strategy at Austin to over come the task at hand?

Current Platform Our Current Platform allows us to use our machine control the way we see fit. If we want it on a Dozer one day then a paver the next we have that ability using the Trimble GCS and PCS Platform.

Interchangeable Components Robotic Total Station CB460 3D Control Box TSC3 Data Collector The Right Grade Control Equipment Being able to Interchange components was on of our reason for going with the Trimble Systems on this project. Also our current capital investment was another reason.

Trimble PCS 900 System UTS Right UTS LEFT Machine Radio CB460 3D Display CB440 CB440 Sonic Tracer or Ski VM200 Valve Module AS200 Slope Sensor Sonic Tracer or Ski

Sub-Grade Topo Placeholder for list item A topo of the site is performed and a cut sheet is generated

Processing Data & Un-Compacted Design

Multiple Setups / Accurate Control

Placing Base Material Applications Beyond Asphalt

Placing Base Material Very Successful Application

3D Paving on Asphalt 1st Course

Checking – Checking – Checking 1st Course / Also Topo Shots

Paving Curves Turn 1

Paving Under Bridges

Tangent – Curve – Widening

All Up Hill

3D Milling

Bad Design Data

Good Design Data

Intelligent Repairs Working w/ Design Changes Through the course of the project we received many design changes and some after we have already paved an area. This slide shows us using 3D Milling to shave a area down to better transition the curve.

All in one day – All at the same time One of the first jobs to have 3D milling, robotic base and asphalt paving, Robotic topo collecting with roller along with robotic and GPS grading an not to mention the tremendous amount of survey that was happening in the back ground.

How Did We Do? Outstanding safety performance Met financial objectives Opportunity “Track is awesome”, Dr. Rainer Hart “One of the top two tracks in the world”, Tilke Eng. “Love it”, Mario Andretti “Highest Rating”, Fédération Internationale de l'Automobile (FIA) “Greatest racetrack on the planet”, The Tom Byrum

Learning Curves Control is Critical Modeling Methods Training Techniques 3D Paving is NOT a grading tool (Sub-Grade is important) 3D Equipment is still limited to the capabilities of the paving machine (roller were added to tow arms to prevent binding) Having an Extra Data collector made all the difference

Other Race Tracks (HWY 183 Ft. Worth, TX Other Race Tracks (HWY 183 Ft. Worth, TX Average Race Speed 90mph in a F150)

Access Limitations

Managing Quantities

Mario Andretti 1st Ceremonial Lap Mario Andretti makes ceremonial 1st. Lap as the official ambassador of Circuit of the Americas.

Q & A