Missing data General : Dutch Inspection checked report twice

Slides:



Advertisements
Similar presentations
____ __ ____ _____ ____ ______ _____ _____ ____ _____ _____ _____ ____ _____ Click to edit Master text styles Second level Third level Fourth level Fifth.
Advertisements

Lean Six Sigma 1 What is Lean Six Sigma (LSS)? Lean –Process speed –How quickly things move through a process –Primarily focused on.
Learning and Development Evidence Collection Planning January 2015.
……+(4n-3) = n(2n-1) P 1 = 1(2(1)-1)=1 check.
Supplemental Figure 1 A No. at risk T T T
AUDITING COHESION AND STRUCTURAL FUNDS IN SLOVENIA Nataša Prah Ljubljana, 
WASTE AUDITING 101. What Direction Are You Going?
Standards for Better Health implementation Suzie Loader Director of Nursing.
A credit union authority to invest in derivatives is limited to and has been granted exclusively for the purpose of reducing interest rate risk exposure.
1111 AS9104/1 and Potential Impacts to Your AS Registration November 16, 2012 Presented by Pete Kucan Director of PRI Registrar Operations.
NTS to LDZ Meters – Audits & Validations Created by Alison Chamberlain on behalf of Transporters, for meeting 6 th August, 2010, 31 Homer Road Solihull.
ISO Tor Stålhane IDI / NTNU. What is ISO ISO 9001 was developed for the production industry but has a rather general structure ISO describes.
SEMINAR on the EEA Financial Mechanism THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels 13 June 2005 Control and Audit Nicholas Martyn.
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Second level.
Receipt of Third Party Merchandise. FTC Opinion Letter April 19, 2010 The Rule prohibits funeral providers from “tying” services to purchase of goods.
This certificate is awarded to _____________________ on this 31 st day of May, _____________________.
Lean Six Sigma An Introduction to Process Improvement.
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
INSPECTION AND ACCEPTANCE CRITERIA. PRODUCT CONFORMANCE Dimensional conformance - within tolerances as defined on product drawing Dimensional conformance.
CACFP Record Keeping: Permanent Records 1. 7 CFR (e)(1) Copies of all applications and supporting documents submitted to the State agency shall.
Overview of 3 rd Party Inspection Program for USTs.
Prepared by Amira Selim 31 st October 2009 Revised by Dahlia Biazid Requirements Analysis.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
Dave Adamson Design Network launched 2 years ago Had many good ideas Discipline tracks Activity ownership Milestone meetings Promised “Not Static”
GROUP CERTIFICATION: THE INTERNAL CONTROL SYSTEM Istituto per la Certificazione Etica ed Ambientale.
Industry-Led ESM in Canada
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
Glass in the MRFs Glass Recycling Strategies and Processes at MRFs
Internal Auditor Training
Update on the Latest Developments in Government Auditing Standards
Transnational training seminar for potential Lead Partners and Partners to INTEREGG IIIB-CADSES procedures for 3° call for proposal CADSES implementation.
ZZZZ Best Review: Limited assurance that the financial statements have been prepared in conformity with GAAP. A “clean” review report provides negative.
What Is ISO ISO 27001, titled "Information Security Management - Specification With Guidance for Use", is the replacement for BS It is intended.
Financial Closing Scenario Overview
Summary of presentation
Regional Skills Forum 2016:
‚WF-RepTool‘ structure and database application to monitor WEEE treatment results key points – start up & how to use update: June 2014.
OPAL (SP2000) Road Safety Standard.
ISO 9000.
There are no guarantees that a visitor will be accepted to work at the University. The terms of any grant or contract under which the visitor is to work,
Department of Buildings
WHITEBOX TESTING APPROACH
Impact of Waste Recycling on the Composition of MSW
DEFRA – MSW stats..
Update on the Developments in Government Auditing Standards
QUALITY MANAGEMENT SYSTEM
Project Procurement Management
Van Wert, OH Water and Wastewater Element Training
Effects of the point of measurement on the comparability of the data on waste treatment Methods of data compilation and the effects on the comparability.
Data quality Past (WEEE I) Wecycle only household WEEE system
Prototype evaluation and development process
Eligibility Rules Stefan Nyström, Managing Authority
Financial Closing Scenario Overview
2018 AASHTO Civil Rights Conference
Today‘s topics Repeating the key points of the last few lessons in groups of two Taking a look at waste separation and recycling processes as chemists.
MINISTRY OF ECONOMY AND FINANCE
“…a Commitment to Extended Partnership…”
Specialty Heat Treating, Inc. Internal Auditor Training
Cloud Services - A Framework for Adoption in the Regulated Life Sciences Industry Status November 2018.
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
Appropriate Access InCommon Identity Assurance Profiles
Inspection of Buying/Selling and Handling
Steps towards Certification
EGYPO Organisational structure
Project Procurement Management
4.8 Notes: Coordinate Proofs
IT-audit case PEMPAL, Skopje, April 2019.
Similarity, Congruence, & Proofs
QUALITY PART FOUR Chapter Nine Introduction to Quality Chapter Ten
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Presentation transcript:

Missing data General 2009-2016: Dutch Inspection checked report twice Rule: no documented proof is no recycling Experience: the better the data, the lower the recycling percentage Problem What proof is needed? Do you want to differentiate per material stream? New Waste Framework Directive  what is recycling (OMR)?

Burden of proof Risk based

[A] Specification of composition by independent third party (not permitted if further separation takes place downstream) [B] Specification of composition by 1st and/or final processor [C] Invoice/credit note from 1st and/or final processor [D] Downstream statement from 1st and/or final processor [E] Contract with 1st and/or final processor [F] Acceptance criteria of 1st and/or final processor (only in the case of pure flow and supplemented with proof of delivery) [G] Certificate of product/‘end of waste’ status [H] Audit report