Proposed New CMS Conference Room on first floor of SHL

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

Architectural Drawing
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
 Safety at Home  Millions of people each year are seriously injured in their own homes  Most can be prevented.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
FIRE DESIGN OF BUILDINGS VULNERABLE GROUPS. COMPONENTS OF FIRE building materials unattended stoves Loose electrical connections overloaded electrical.
Identifying Information: Common Areas - 1 none LEVEL 2.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
HVACR116 – Trade Skills Mechanical Drawings.
Interior Construction
Hinckley Baptist Church Sanctuary Refurbishment Proposals 2010.
Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16.
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
Building Codes and Interior Design
University of Toronto Mississauga Campus Capital Projects University of Toronto Mississauga Campus: Capital Projects Erindale College Council | March 9,
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
PH Building Assessment Buildings 15, 22, 23, 154, 167 Safety Analysis.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Residential Floor Plans
LD-MCR ( Lower Deck Mobile Crew Rest )
ICL 26/05/2010 Relocation of electronics at Pt5 Summary of week 22 + roadmap Contributions from GS-SEM, EN-MEF, EN-EL, EN-CV, BE-ASR, TE-MPE, PH-CMX, TE-EPC.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
COZYEON Residence Main facilities gallery. Corridor of each floor.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
 There are 70,000 fires each year in Canada  Preventing fires will lessen the chance of injury or death  Knowing what to do in case of fire can save.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Interest Free Energy Efficiency Loan Program Proposal for Improvements August 15, 2016.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
Code of Practice for Fire Safety in New and Existing Community Dwelling Houses Eamon O’ Boyle.
An-Najah National University
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Assembly And Installation Of Ikea Kitchen Cabinets
The Quality of Interior Design at PMU
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
30 WEAVERS WAY Please find in the following existing layout of staircase at the above property. There is a ground floor and a first floor layout. The floor.
An-Najah National University Building Engineering Department Graduation Project 2: Design Orthopedic Specialist Hospital Prepared By: Mohannad Iyad Al-Shak’a.
Energy Efficiency for Ashton Hayes
Earthquake effects on health care facilities
SR1 cleanroom extension
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
RWTCS Steering Commitee
Extension SR1 WP3 Electrical installations
Smoke Detector Installation Guidelines
3. Refurbishment - Project 1
INTD 405 Modern Practices in Interior Design PLANS
WHERE IT ALL BEGINS.
RDR Baseline Layouts for Interaction Region
R Single-Family Home Repair Exemption
Building standards Mr. Da Silva.
Wbs, CONTRACTORS & GIVING A BID
Jerzy KWIATKOWSKI, Jerzy SOWA, Andrzej WISZNIEWSKI
Jobs that are disappearing but still needed
Presentation transcript:

Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery) J.Osborne CEMESTE 18 June 2008

Main access

10m 18m Floor area approx. 180m2

Existing wall to be removed

Existing floor to be replaced, carpet ? Existing duct will have to be removed and new CV system installed Existing floor to be replaced, carpet ?

Second access/egress

Change in level to be rectified

False ceiling,lights ?

Glazed facade

No new window openings proposed

1.2m Width of existing stairs & doors need to be confirmed if acceptable > 50 people = 1.4m ?

Conference Room must be considered as a ‘non public area’.

New door may be required ?

SHL Draft Cost Estimate CE works : Glazed wall along SX, partition wall at top of 2nd staircase, false ceiling, architect (assumes existing external staircase is ok) J.Osborne 150-200kchf Replace false flooring, carpet. D.Parchet 50kchf Modifications to existing Ventilation systems 200chf/m2 B.Pirollet 40kCHF Internet E.Sallaz ? Electrical modifications, new lighting, power R.Lassausaie Safety equipment : Water Mist Smoke Detection C.Schaefer Furniture/computers etc Total 240-290kchf