Budget specification EHN1 Extension: Infrastructure (WG2)

Slides:



Advertisements
Similar presentations
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
October, 2009 MeRHIC Conventional Facilities Al Pendzick October, 2009 Internal Review.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
EHN1 North Wall Dismantling Schedule Bastien Rae.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
Annual Workshop on Crystal Collimation H8 Layout and infrastructure 1October 2010J.LENDARO EN/STI/ECE.
Installation of the T600 at Fermilab CSN2, September 22,
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
ELENA installation progress F. Butin / ELENA collaboration.
Status of Gas Barrack(SPS) and Exhaust JAILLET David EN/EA/CT.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
The Next Generation of a Gamma Irradiation Facility GIF++
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
I. Bergevoet - Training preparation
NA CONSOLIDATION & SAFETY SYSTEMS
YETS & LS2 Works EN-EL / Power distribution
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Safety in the Neutrino Platform Hall
St. George Infrastructure
YETS & LS2 Works EN-El on LHC / Power distribution
EHN 1 CO2 Leaks inside the beam lines
Neutrino Platform Overall Protodune Risk Mitigation Plan O
EHN1 Extension planning
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
LS1 planning meeting
News from Integration WG
CERN Data Centre ‘Building 513 on the Meyrin Site’
EN-CV Progress EHN1 Extension Project
Part II: Integrated Design of Infrastructures
CE Status: Activities executed until 03/08 and ongoing
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
CEDAR Detector Ventilation System Review
NA CONSOLIDATION & SAFETY SYSTEMS
YETS & LS2 Works EN-EL / Power distribution
East Hall under construction
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Business opportunities related to CERN electrical network
Experimental Areas – LS2 planning
North Area Safety Review 2019
Summary of the presentation:
Aziz AMAMOU EACM – 21th May 2019
ILO Industrial Opportunities Days, 6-7 June 2019
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 1 October 2015

The project is devided in 4 parts: EHN1 North Wall dismantling (WG1) EHN1 extension building infrastructure (WG2) Extension of the H2 and H4 beam lines (WG3) Installation of detectors and associated infrastructure (WG4)

Work units - infrastructure PBS-ID Title Group IN.2.1 Ventilation, heating and air-conditioning EN-CV IN.2.2 Fluids- and water cooling IN.2.3 Electrical infrastructure and lights EN-EL IN.2.4 Counting rooms EN-MEF IN.2.5 Gas networks ÎN.2.6 Metal structures ΕΝ-MEF or GS (tbc) IN.2.7 Doors IN.2.8 Alarms- and detection GS-ASE IN.2.9 Personnel access IN.2.10 IT-networks IT-CO IN.2.11 Transport- and handling EN-HE Total Project contingency (10%) Total request

Cooling and Ventilation IN.2.1 - Ventilation, Heating and Air-conditioning EN-CV 1,072,673 General ventilation system 326,790 Air-conditioning of the counting barracks 140,800 Ventilation and air extraction system of the detector pits 455,083 ODH requirements due to Lar Connection to the central heating network 150,000 From Ch Martel (GS) IN.2.2 - Fluids and water cooling 684,316 Raw water 78,243 Compressed air 25,660 Demineralized water 128,317 Chilled water 270,728 Fire fighting water 56,034 Drinking water(domestic) 28,534 Design&Works (by FSU) 96,800 !

Building general ventilation: adding of 2 new ventilation units total flowrate: 210 000 m3/h total heating power: 2 440 kW Argon extraction unit Existing ventilation unit inside EHN1 building Fire fighting water hose Fluid networks

Electric infrastructure IN.2.3 - Electric infrastructure and lights EN-EL 3,106,500 2.9 DC-Cabling is in WG3 HV switchgear - 18kV Stable + 3.3kV Secure 240,063 Control racks -3.3+18kV 87,256 Transformers 80,371 Containment for substations only 133,975 Cabling and connections 390,051 Lighting 80,408 Power distribution 470,649 Switchboards 637,560 UPS 31,142 19" Racks 14,145 Control systems (EN-SCADA) 49,450 48V Source 127,763 Barracks/Counting Room Fit out (Based on 8 times 9x4m) 282,866 Structural Earthing 27,315 Earthing in the concrete slab of extension Documentations 57,487 Cabletrays 396,000 360 kE This work unit for electric infrastructure includes consolidation up-stream of EHN1, which must be done to connect the extension – arbitration with the consolidation project is needed.

! MEF-Items IN.2.4 - Counting rooms EN-MEF 96,000 Barracks 12kCHF x 8 IN.2.5 - Gas network 130,700 Neutral gas network and panel(s) in extension IN.2.6 - Metal structures EN-MEF or GS (tbc) 193,200 Metal structure which are not included in CE-workpackage Platform, walkways and gridded separations 140,250 Staircases and ladders (crinolines) 52,950 IN.2.7 - Doors 20,500 Personnel and motorized doors !

MEF-Items Platform «jura side» Counting rooms Personnel access door with card reader Neutral gas panel

! GS-ASE Items IN.2.8 - Alarms - and detection GS-ASE 150,000 Estimate by MW (wait for a refined quote from GS) Fire detection ODH detection Evacuation alarm IN.2.9 - Personnel access 50,000 Access system for machine/detectors is in WG3 SUSI access and video 6 doors + 5 surveillance cameras ! A safety hazard assessement with HSE must be done before reliable estimates can be presented by GS-ASE

IT networks IN.2.10 - IT networks IT/CS 88,700 Ethernet 46,000 67 UTP Ethernet sockets Wi-Fi 18,500 15 UTP Ethernet and Wi-Fi Bases Connection to fiber-optics network 24,200 22kE - Provided by EN/EL/CF

Transport & handling IN.2.11 - Transport and handling ΕΝ-ΗΕ 97,200 Heavy handling and transport for infrastructure work two teams of two FTEs for a three months period Note: the two 40 ton overhead cranes are renovated on the consolidation project

Infrastructure items in WG2