M. Reimeris, The Ministry of Finance of Lithuania (Managing Authority)

Slides:



Advertisements
Similar presentations
The Implementation Structure DG AGRI, October 2005
Advertisements

POLAND Development Management System in Poland Brussels, 2 July 2010.
RELATIONSHIP BETWEEN THE MANAGING AUTHORITIES AND THE PAYING AGENCIES IN THE MANAGEMENT OF RURAL DEVELOPMENT PROGRAMMES Felix Lozano, Head of.
Single Audit Strategy LATVIA. Audit System The Audit Authority functions are carried out by the Internal Audit Department of the Ministry of.
Arrangements regarding ECP 2014–2020 implementation 1.Implementation of the Republic of Slovenia Budget Act Specific section for the period:
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Introduction to the Albanian Public Procurement System Central Asia Regional Public Procurement.
Norwegian Financial Mechanism block grant ““Transfer of Experience and Strengthening of Cooperation among Local, Regional and Euro regional Partners in.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
30. Conference of Directors of EU Paying Agencies Workshop1: The possibilities for optimizing the processes of implementation of direct payments Agency.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
1 Swiss-Slovak Cooperation Programme April SWISS-SLOVAK COOPERATION PROGRAMME  New possibilities of financial support for the 10 new member states.
On the spot checks Double financing prevention administration processes Simona Liutkienė, Vaida Zigmantaitė 1 February, 2012.
1 Implementation of the South Transdanubia Operational Programme (STOP) CSORDÁS Zoltán Grant scheme management director.
M. Reimeris, The Ministry of Finance of Lithuania (Managing Authority)
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 11 th Public Procurement Knowledge Exchange Forum “Procurement.
Mladen Šimunac President of the board Budva,May 2008.
Payment claim administration in Lithuania Conference and Open Discussion about Effective management of EU structural funds 1-2 of February, 2012 A. Stalerunaite,
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Regulatory requirements in the current programming period Funchal, 18 November 2010.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 9 th Public Procurement Exchange Platform “Efficient Implementation.
Managing Authority of EU Funds – Ministry of Finance 1 Methodology of selection of project applications for EU funds including preparation of appraisal.
Institutional structures for Structural Funds assistance Ministry of Finance September 10, 2003.
EuropeAid How to benefit from EC grants? ‘Calls for Proposals’ Thematic Operations EuropeAid Cooperation Office.
EuropeAid How can an NGO benefit from EC grants? ‘Calls for Proposals’ Thematic Operations EuropeAid Cooperation Office Athens, 25 September 2008.
-Honesty-Cooperation-Responsibility-Respect  Established in 2003 by the Ministry of Economy.  Non – profit public institution.  Managing and administrating.
Belgrade, Donor Coordination Meeting Belgrade, 30 th of November 2011.
Evaluation Capacity building in Lithuania Presentation for Presentation for Evaluation Units Open days by Mrs. Ana Stankaitienė EU Programmes Management.
MONITORING SYSTEM OF EU STRUCTURAL FUNDS: PHYSICAL INDICATORS International Conference for New Member States February 1-2, 2012, Vilnius (Lithuania) European.
Paulius Baniūnas Ministry of Finance of the Republic of Lithuania EU Structural Support Management Department Monitoring and Analysis Division SYSTEM OF.
Ministry of Economy, Energy and Tourism 1 OP Competitiveness Progress of Implementation 2010.
Technical Assistance Office SOCRATES / Lingua 1 and 2 Information seminar for co-ordinators of successful pre-proposals Carla Donda 28 January 2005.
1 EXPORT SUPPORT THROUGH JOINT OFFICIAL PARTICIPATION IN TRADE FAIRS AND EXHIBITIONS ABROAD The Project Management of EU Project Funds.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
Experience of Accessing EU Financial Support in Lithuania 4th PG Funding Meeting , Paris.
Ministry of Education, Research and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism GR07 Research within.
Belgrade, Donor Coordination Meeting Belgrade, 4 th of June 2012.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
The procedures for project under Measure 1.2 submission for SF financing Joint Seminar “Capacity building for designing projects dealing with sustainable.
Digital Access to Cultural Heritage, Prague 26 May 2009 Regina Varnienė-Janssen Usage of Structural Funds for Lithuanian Cultural Heritage Digitization.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
The Central purchasing in Bulgaria: Current status and prospective TAIEX Seminar 9-10 December 2015 Ivanina Beleva Director of the Central Purchasing Body.
1 STRATEGIC PLANNING AND BUDGET PRIORITISATION IN CROATIA Francois-Roger Cazala, Rimantas Veckys SIGMA - Lithuanian Ministry of Finance.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Information by the Managing Authority on evaluations of EU funds in 2009 Monitoring Committee meeting 25 March 2009.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
Integrity Pact Partner Event 17 June 2016 Brussels Eng. Lazar Lazarov Road Infrastructure Agency.
ROUND TABLE “Exchanging Experience in Absorption of the European Funds: Perspectives for Bulgaria and Poland” 1 April 2011, Sofia Tomislav Donchev Minister.
Quality assessment of internal audit activities performed on a periodical basis Nikolina Bibić, Ministry of Finance, Central Harmonization Unit Republic.
Specific objective „To increase support for general education institutions to develop students’ individual competences” Measure No „Support.
Writing LIFE Integrated Project
Leader ECA audit findings and possible simplification
Structural Funds Programming Predeal, Romania
Annual Review Meeting OP for Cohesion Policy Funds Specific Thematic Focus 2 - Review the status and state of play of Smart specialization.
GOOD PRACTICES AND REFORM OF PUBLIC ADMINISTRATION
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
GREECE-ALBANIA IPA CROSS BORDER COOPERATION PROGRAMME
4.4 Procurement by grant beneficiaries
Drafting the Guidelines for applicants
PROJECT MANUAL Galina Georgieva Project Officer
ESF ASSISTANCE TO LITHUANIA’S OBJECTIVE 1 AND EQUAL PROGRAMS
Eurostat Task force on victimisation surveys,
Reduction of administrative burden for applicants and project beneficiaries Lithuanian practice Asta Jurgute European Social Fund Agency
Troika Directors General Meeting Prague, 24 February 2009
Home Affairs Programme in Bulgaria: From Development to Actual Implementation Cooperation Committee Meeting 28 November
“Project Selection Procedure/Criteria”
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Presentation transcript:

M. Reimeris, The Ministry of Finance of Lithuania (Managing Authority) Application submission, evaluation and financing contract administration processes Conference and Open Discussion about Effective management of EU structural funds 1-2 of February, 2012 M. Reimeris, The Ministry of Finance of Lithuania (Managing Authority)

Project initiation procedures State planning projects (non-competitive calls – selection is made by central authorities based on national strategic planning documents) – 56% Regional planning projects (non-competitive calls – selection is made by regional authorities based on regional strategic planning documents ) – 19% State planning projects and regional planning projects have no scoring selection criteria Call for proposals - 25 % *data of 2012.01.30 in SFMIS2007

Types of project selection (1) Planning projects – projects planned in the national and/or regional strategies and their implementation plans Planning project: Strategy/strategy implementation plan Selection criteria (Monitoring Committee) Detailed conditions for financing (Ministry) List of projects (Ministry/Region Council) Invitation to submit an application (IA) Evaluation of administrative compliance Evaluation (IA) Evaluation of the project’s eligibility Decision to finance a project (Ministry) Contract (Ministry, IA, project promoter)

Types of project selection (2) Call for proposals (open tender) - support for projects where there is a need for “bottom-up” approach and competition Open call for proposals procedure: Selection criteria (Monitoring Committee) Detailed conditions for financing the projects (Ministry) Evaluation of administrative compliance Call for proposals (IA) Evaluation of of the project’s eligibility Evaluation (IA) Evaluation of the project’s utility and quality Decision to finance a project (Ministry) Contract (Ministry, IA, project promoter)

Project Evaluation and Selection (1) Evaluation of project applications consists of 3 steps: Administrative compliance assessment, Eligibility assessment, Quality assessment (applies only for projects selected by way of call for proposals). Project selection criteria and their methodology are provided in Guidelines for applicants.

Project Evaluation and Selection (2) Simplification  evaluation of quality (scoring), administrative compliance and evaluation of the project’s eligibility - all these processes at the same time (or in any order). Evaluation  is carried out by the Implementing agencies and (or) by the experts. After individual evaluation the results are discussed in evaluation committees. Additional projects  Selection committees can be established by Line ministries which select projects on the basis of evaluation results

Applications Common application part A: basic information about project owner and his partners and their declarations, project description, project activities, project budget, project indicators, etc. Special application part B Annexes

Applications Administration processes were simplified: Only one application form for all beneficiaries: electronically pre-filed form (depends on fund), possibility to import data directly to SFMIS2007, only necessary data is required, general errors verification in e-forms, additional errors verification in SFMIS2007 after import.

Financing contracts Financing contract includes: Standard and special conditions Annexes (including description of the project based on common application form) Possibility to prepare contract in SFMIS2007 automatically: data automatically transferred from application to contract arrangement, automatic errors verification in SFMIS2007, data cross check, additional errors verification in SFMIS2007. General projects implementation information in SFMIS2007 (possibility to monitor projects). Possibility to prepare amendment of contract annexes in SFMIS2007. Amendments of contracts: Essential, Non-essential. Possibility to download contract data from SFMIS2007. Scanned documents are stored in SFMIS2007.

What is in SFMIS2007? (Structural funds management and monitoring information system) 4 OP’s and ~6.776 billions of euros for the period 2007-2013. About 20 administrative institutions. Number of users 753. Number of applications 996. Number of contracts 3608. Number of finished projects 1795.

Data stored in SFMIS2007 (Structural funds management and monitoring information system) Planning projects lists, calls for proposals Applications, Evaluations results, Financing contracts, Financing contracts implementation, Financing contracts amendments, Scanned documents, Other.

Public portal The public data exports directly from SFMIS2007 to Public portal www.esparama.lt: applications submitted, evaluation results, project implementation. Reliable data, time savings.

Our priority is to make administration process as simple as possible. Challenges / issues High costs for project preparation – applications are submitted with a lot of annexes, rejected and it is absolute loss for project owners; To focus on quality – sometimes number of signatures and papers is more important than the benefit of the project; Too expensive and difficult management for the institutions – a lot of paper documents and checks. We need to focus on cost effective solutions in all project stages; Only e-form applications should be processed; paper documents – annexes, only for medium or large projects; Integration with other governmental IT systems. Our priority is to make administration process as simple as possible.

Thank you for your attention! Mantas Reimeris m.reimeris@finmin.lt