Hall C Cryogenic Target Status

Slides:



Advertisements
Similar presentations
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Advertisements

1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Tritium Target 9 December Overview Design and major subsystems Thermal/structural analysis Cell filling Vent and stack T2 detection and monitoring.
AC-SSC-1 Installation and operation manual
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
G2P Target installation and Beyond. Schedule Pivot before.
Qweak Target Meeting Greg Smith, Dave Meekins, Mike Seely, Silviu Covrig January, 2008 Design Questions Signals/Feedthrus Relief Stack Job Jars Schedule.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
Absorber R&D and Test Results CM16 at RAL, Oct 8-11, 2006 Shoji Suzuki & Shigeru Ishimoto KEK.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
Hydronic Mechanical Controls
Submersible Seal Top Down DP Level Assembly. DP Level Solution for Top-Down Level Measurement Applications Challenge: Many tanks go un-instrumented in.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
HAPEX III / PVDIS Targets Dave Meekins. Target List Loops – LH2 25 cm – LD2 25 cm – 20 cm Spare Solid target – Dummy tgts of correct length – Optics tgt.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
HAPPEX-III and PVDIS targets D.S. Armstrong July 22 ‘08 1)Pointing angle measurements – water cell target some old-style nuclear physics… 2) Cryotargets.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
SCH Controls Readiness Review- Cryostat Nov 4-5, 2015 Kurt Cantrell.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Hall A Tritium Target Status Dave Meekins 7 December 2015.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Installation of the T600 at Fermilab CSN2, September 22,
Hall A Target Gmp Meeting Sept 24, General Goal to Make A and C Identical Give option for complete target swap in crisis Allow fewer total spare.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
S A Griffiths CM42 June 2015 Electrical & Control.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Design, Evaluation and Application of a Fuel Cell Vehicle
Unit 13 Oil-Burning Equipment
NPDG Liquid Hydrogen Target: Design and Safety Features
Installation of the T600 at Fermilab
Process Requirements and Design Approach
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
MICE RF System Power Supplies, Control and Monitoring Status report
Safety approval of the installed copper cooling pipes
MICE Meeting at RAL, Oct-23, 2005
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Hall A Target Status 9/27/16 Dave Meekins.
Date of download: 11/15/2017 Copyright © ASME. All rights reserved.
Bubble Chamber Detector System.
Real Solutions Product Introduction
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Technical Summary - ANL
Hall A Tritium Target Status
Cryogenics – The Basics
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
CTF Users’ Perspective
Polarized 3He target installation
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Hall C Cryogenic Target Status Dave Meekins JLab Target Group January 20, 2017

Summary of Alterations External upgrades: New/refurbished vessels and ancillary piping and support structure New vent cap Minor gas panel changes New switch panel New supply and return piping New chamber config Internal upgrades: New loop piping New thermometry and heaters New cells/blocks Upgraded controls Repaired and replaced stripped/damaged components

Pressure Safety Hall A and C Cryotargets nearly identical Alteration of existing system Minor changes to gas panel Replacement of swap panel Refurbishment/replacement of vessels New piping to pivot New overpressure protection New Loop piping New Cells/Blocks All work performed in compliance with ESH&Q 6151 and applicable Codes ASME B31.3, ASME PCC-2 (Piping) ASME BPVC VIII D1, NB-23 (Vessels)

Configuration Top loop 4 and 10 cm cells Bottom two loops 10 cm cells Fluid H2/D2 Bottom two loops 10 cm cells Only two loops can be filled at a time. Filled with H2 or D2 D2 tank can be filled with H2 to give 2nd H2 loop D2 has been purchased but due to NMCA will most likely not be here in time for run Purification of D2 system will be required (Tank purification takes time)

Target Configuration Loop 1 4 cm 1.6” CF cell 10 cm 1.6 CF cell Loop 2 10 cm 2.6” Cell En route Loop 3 Solid Targets 10 cm dummy with C in center (Match rad length of 10 cm LH2) 4 cm dummy (rad length of 4 cm LH2) Optics 1 and 2 C hole C targets 6%, 1.5%, and 0.5% 1.2% 10B4C and 11B4C 2% Be (en route) BeO

Dummy and Optics Targets Targets can be positioned quickly Positions for +/- 2 +/- 3.75 +/- 5 +/- 7.5 +/- 10 cm Current Optics Config: 0 and +/- 10 cm +/- 5 cm

Fully assembled 4cm/10cm combined cell block

Test Cryostat New test cryostat (developed in Summer 2016) Test components at design temperature and pressure Temperature below 6K Pressures above 200 psi. Allows testing of fully assembled cell blocks, feedthrus, etc. Aid in development of future sealing techniques

Cryogenics ESR 15K circuit shall be used to cool the target Hall A target will be operated concurrently Two target operation will require close coordination between CRYO, Hall C and Hall A.

Status * Same as Hall A cryotarget Complete In process Tank refurbishment (compliant with 6151) Tank support structure repair/painting New loops, solid targets* New alignment system* Upgraded gas panel and piping New swap panel Upgraded controls Software* Heaters (higher voltage, lower current)* Temp controls (6 per loop)* Aux heater controls (all power supplies are in Hall)* In process 10 cm production cells (2.6 inch OD) Installation of piping Installation of cells/blocks Electrical upgrades * Same as Hall A cryotarget