Designing a Commercial Shopping Center BY: Taylor Stiles, Timothy Colomb, & Leighton Webre Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward Rode
Objective To design a commercial shopping center consisting of 3 retail units in an area of commerce.
Shopping Center Details 59,020 Square Ft. Price per Square ft. to build is estimated at $99. 69 Total Estimated price of Shopping Center is $5,883,726.14 http://www.buildingjournal.com/construction-estimating.html
Preliminary Floor Plan
Concrete Masonary Walls Steel Beam Joist Roofing Foundation Poured Concrete Slab Concrete Masonary Walls Steel Beam Joist Roofing
Location 0 S Airport Road, HAMMOND, LA 70403 Price $1,306,800 Lot Size 3 Acres Commercial Property Sewer Type: City Water Type: Public
Map Location
Aerial View
Preliminary Building Code Review Article 2. Administration 2.4.2 Building Permit Required Article 3. Permits and Final Plat Approval 3.1.2 Permit Required 3.4.3 METAL BUILDING FACADES Article 4. Site Conditions 4.1.4 Fill Requirements Article 6. Zoning Districts 6.1.4 Commercial Article 13. Signs 13.1.8 Sign requirements by zoning district. Article 14. Parking Off - Street Parking Requirements (Table 14.2.2 B) Commercial Retail Sales And Service – 1per 250 SF FA
Deliverables for Spring 2017 Continue Developing Floorplan and Elevation Drawings Full Material Take-off Site Review Review LBC and State Building Codes to ensure all have been met Completed Design Drawing (Foundation and Structural)
Timeline September 26, 2016 - October 2, 2016 – Meet with Advisor to get approval on Presentation October 3, 2016 - October 9, 2016 (Present Presentation) October 10, 2016 - October 16, 2016 – Continue Developing Floorplans and Elevation Drawing October 17, 2016 - October 23, 2016 – Research remaining Local and state building codes October 24, 2016 - October 30, 2016 –Site Review October 31, 2016 - November 6, 2016 – Begin Material Take-off November 7, 2016 - November 13, 2016 – Survey the land for Elevations November 14, 2016 - November 20, 2016 – Research Business Aspect of Rental Properies November 21, 2016 - November 27, 2016- Thanksgiving Break (Prepare for Final Presentation and Report) November 28, 2016 - December 4, 2016 - Final Presentation and Report Are Due and to be presented
Any Questions???