Road Safety Audit Findings

Slides:



Advertisements
Similar presentations
Presented by Nazir Lalani P.E TRAFFIC SAFETY EVALUATIONS (Pedestrians and Bicyclists)
Advertisements

Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
Accessible Pedestrian Signal
Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Safety at Signalized Intersections. Signalized Intersections FHWA Safety Focus Areas 2.
2009 MUTCD Revisions Part 4 – Traffic Signals Revisions to the 2009 MUTCD.
Pedestrian Safety Master Plan. This Presentation Similarities and Differences with Other Areas No Magic Bullet Site, Corridor Specific Multiple, Complementary.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
CE 2710: Transportation Engineering Traffic Signals April 3, 2009 Nicholas Lownes, Ph.D.
Barriers to Use of Fixed Route Transit Services Janet M. Barlow Certified Orientation and Mobility Specialist Accessible Design for the Blind NCAMPO conference.
Florida Department of Transportation, November 2009
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD CA MUTCD 2012 Revisions to Part 4 – Highway Traffic Signals.
Fordham Road & Webster Avenue 26 children hit by vehicles in five years- 3rd most dangerous.
6-1 Lesson 6 | Practice RSA. Perform a practice-RSA of a design-stage or an in-service road. Analyze data acquired from site visit or design plans and.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
HAWK Evaluation NE/SE 41 st Ave & E Burnside St Sirisha Kothuri William Farley Kimber Miller Aaron Rieck Civil & Environmental Engineering.
February 19, 2015 Design Guidelines to Accommodate Pedestrians and Bicyclists at Interchanges Draft ITE Recommended Practice: Meghan Mitman, AICP Senior.
80 th and Foster Intersection Analysis Kevin Hace Chris Hass Matt Palmer CE 410/510: Bicycle and Pedestrian Engineering Design.
Hawthorne & 16th Brian Marcum Chloe Ritter Collin Roughton.
Module 5 Displaced Left Turn (DLT) Intersections
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
In partnership with: FHWA PedSafe: The San Francisco MTA/UC Berkeley Pedestrian Safety Program Frank Markowitz SF Municipal Transportation Agency David.
2015 Traffic Signals 101 Topic 7 Field Operations.
13 th Street and Dayton Avenue – Ames, IA Intersection Study ByungOck Kim Greg Karssen.
2015 Traffic Signals 101 Topic 11 Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption.
Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Athens Avenue / UPRR Grade Separation Feasibility Study Thunder Valley Casino.
Advanced Preempted Crossings – A Case Study Tim Oster Railroad Project Manager City of Fort Worth Mid-States Highway-Rail Grade Crossing Safety Conference.
CHILDHOOD INJURY PREVENTION CONFERENCE Environmental Task Forces Russell Smith Program Advisor, FedEx Global Citizenship 2.
Lesson 2 | Road Safety Issues 2-1. Learning Outcomes Define RSA. Explain the need for tools to improve road safety. Explain the role of GORE. Identify.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
NC Local Safety Partnership Selecting Interventions.
6-Answers-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise – Part A – Session #6.
Access for Individuals who are visually impaired or blind Janet M. Barlow Accessible Design for the Blind 2015 Walking Summit October 29, 2015.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
FHWA’s Intersection Safety Scan Tour January 31 – February 11, 2005 Performed for: FHWA, Office of Safety Design.
Chapter 6: Intersections
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
Complete Streets Training Module 4b – Designing for All Users.
Traffic Records Forum 2016 August 9, 2016 Kelvin R. Santiago-Chaparro

Synthesis of Recent & Ongoing Studies: Accessibility and Pedestrian Safety at Roundabouts Andrew T. Duerr, P.E. Northeast US Roundabouts Peer Exchange.
Saving the King Street Bicycle Boulevard
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Guide for Determining Time Requirements for Traffic Signal Preemption at Highway-Rail Grade Crossings: Revisions to the TxDOT Worksheet Kevin Balke, PhD,
North Lamar Boulevard Project
Interdisciplinary teams Existing or new roadway
Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption
Traffic Engineering Division Nestor A. Flores, P.E., PTOE
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Association of Metropolitan Planning Organizations
Beachside Traffic/Crosswalk Update
9th & Colorado Redevelopment Impacts Denver Public Works - Traffic Safety recommendations Community feedback Survey Results Conducted by: Colorado.
ROUNDABOUTS Improving Safety and Efficiency
Safety Effects of Marked vs
Double Crossover Diamond Interchange
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Infrastructure Strategy 1: Implement roadway improvements that compensate for impacts of aging on safe driving Strategy 2: Implement improvements to.
Alex Henry FDOT District Seven Safety Office
Project Location: 35th Ave HSIP8
Presentation transcript:

Road Safety Audit Findings Sr-704 (Okeechobee Boulevard) At Florida Avenue/Rosemary Avenue July 2015

Background Citizen Concerns Regarding Pedestrian/Bicycle Safety Citizen Petition For a Raised Walkway Pedestrian Behavior/Traffic Signal Interaction

Study Area

Study Area/Crash History

Crash Analysis (2009-2013) Three nearby pedestrian/bicycle crashes One bicycle crash at the study intersection No other significant crash patterns (frequency)

Key field observations Pedestrian interaction with the signals Bicycle clearance High pedestrian volumes Confusing phasing and markings

recommendations Low Effort/Coordination Improved signage Update truncated domes Median Striping High Effort/Coordination Modify signal phasing/timing Median modifications to shorten crossing Speed Study Modify pedestrian/bicycle detection Lighting Study

Recommendation: Law enforcement support Issue: Significant ped volume during events Recommendation: Consider using LEO support during major events for crossing.

Recommendation: truncated domes Issue: Non contrasting truncated domes Recommendation: Upgrade/provide contrasting truncated domes

Recommendation: improve communication to pedestrians Issue: Confusion about buttons to activate walk Unclear that ped call is in Recommendation: Improve ped button signage (arrow and street name) Ped feedback buttons (LED)

Recommendation: signage improvements Issue: Advance pedestrian crossing notification Unclear “turning guidance” for sidestreet vehicles Recommendation: Upgrade warning signage Provide median opening guidance

Recommendation: Vehicle-pedestrian notification Issue: Conflicts between right turns and pedestrians Recommendation: Install ground or overhead R10-15 signage, blankout signage, consider LPI.

Recommendation: eliminate eastbound u-turn Issue: Eastbound U-Turns Conflict with Pedestrians Recommendation: Review elimination or alt phasing of U-Turn movement

Recommendation: median modifications Issue: Long crossing distances due to intersection geometry Recommendation: Modify the median to shorten pedestrian crossing distances.

Recommendation: signal TIMING/PHASING Issues Pedestrians crossing on “do not walk” Perceived “short” pedestrian clearance interval Inadequate bicycle clearance Recommendations Review pedestrian clearance intervals Consider a LPI Review signal phasing to improved ped phase opportunities

Recommendation: signal TIMING/PHASING

Recommendation: signal TIMING/PHASING

Recommendation: review signal modifications Issue: Confusing Signal Indications (EB left turn) Recommendation: Review phasing and signal configuration

Recommendation: review speed limits Issue: Citizen concern of high speed of vehicles Recommendation: Conduct a speed study

Recommendation: improve lighting Issue: Lack of intersection and nearby lighting Recommendation: Conduct a lighting analysis

Final recommendations/DISCUSSION LEO Support Signage Signal Modifications Additional Study Speed Lighting U-Turn