HSR Crossing Safety Update Elliot A

Slides:



Advertisements
Similar presentations
Minnesota Passenger Rail Presentation Transportation Finance Advisory Committee presented by: Mn/DOTs Passenger Rail Office May 18, 2012.
Advertisements

OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Passenger Rail – Plan & Opportunities Engineer Contractor Conference Middleton, WI January 21, 2010.
KC REGIONAL TRAFFIC SIGNAL COORDINATION. Agenda  National Perspective  OGL Video Overview  Mid – America Regional Council  Program Elements  What.
Nevada State Rail Plan Standing Committee on Rail Transportation September 2012 Enhancing Rail Infrastructure and Services to Fulfill Nevada’s Transportation.
Division of Public and Intermodal Transportation Regional South Metro Transportation Summit Subject Hearing: Regional Equity in Transportation Services.
Uptown Station: Planning and Funding Strategies for a Multimodal Transportation Center Christopher Koos, Mayor, Town of Normal Wayne Aldrich, P.E., Public.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
2008 Mid-States Highway Rail Grade Crossing Safety Conference.
Exposition Metro Line Construction Authority Safety Overview March 1, 2007 Exposition Light Rail Transit Project.
High Speed Rail on the Horizon State Public Transportation Partnerships Conference Westin Hotel, Seattle, WA August 3 - 5, 2010 Paula Hammond Secretary.
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
SCORT Annual Meeting Jacksonville, Florida September 20, 2010 Passenger Rail in Florida.
Tucson Modern Streetcar Project Overview July 15, 2011.
Module 13: Highway-Rail Grade Crossings (HRGC)
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Illinois Department of Transportation Emergency Management I-74 Reconstruction Project Peoria, Illinois ITS Midwest Annual Meeting February 7, 2006.
Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.
1 National Perspective FEDERAL RAILROAD ADMINISTRATION April 17, 2012 Canada-United States Transportation Border Working Group - Spring Plenary Cross-Border.
2010 Comprehensive Statewide Freight and Passenger Rail Plan – Moving Forward presented by: Minnesota Department of Transportation.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
GEORGIA DEPARTMENT OF TRANSPORTATION INTERMODAL DIVISION - TRANSIT Presented to G.A. MPO CONFERENCE November 2012.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
May 25, 2010 Wisconsin High Speed Intercity Passenger Rail From vision to reality MADISON COMMUNITY MEETING John Oimoen, High Speed Passenger Rail Program.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
RAILROAD-HIGHWAY GRADE CROSSING HANDBOOK AUGUST 2007 REVISION PRESENTED BY KURT ANDERSON 2008 Mid-States Highway Rail Grade Crossing Safety Conference.
Snapshot of the Railroad Industry in Alabama Within Alabama there are 29 freight railroads that operate over 3,255 miles of track. This includes Class.
Michigan Accelerated Rail Service Passenger & Freight Director Kirk T. Steudle, P.E. Michigan Department of Transportation Faster, Better, Cheaper, Safer,
Chicago – St. Louis High Speed Rail Program July 9, 2015
11 Ina Road Traffic Interchange Project Update Marana Chamber of Commerce Business Connection Luncheon May 18, 2016 Greg Byres, PE, Senior Urban Project.
Reno Area / Rail-Transit Options March 24, 2016 Reno Area Rail-Transit Options by Lawrence Meeker HNTB Corporation Reno Area Rail-Transit Options by Lawrence.
VA/NC Compact Passenger Rail Update Kevin Page Chief Operating Officer Rail and Public Transportation January 9, 2012.
Delivering Together: A Case Study Highway 7 and Louisiana Avenue Interchange ACEC MnDOT Conference March 5, 2012.
An Overview of Stakeholder Roles and Federal Legislation at Grade Crossings May 18, 2016 presentation to CPWA Saskatchewan Chapter, Saskatoon Railway Safety.
Positive Train Control
Program to improve Passenger rail – Amtrak and commuter
FAST Phase I is a $500 million investment to:
Joint Police & Streets Committee
The Central Avenue Connector Trail
Highway Administration & Finance
DATA Transportation 101 Project Status March 20, 2002
Public Private Partnerships
Transportation Summit
Michigan Update Michigan Association of Rail Passengers
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
University of Colorado A Line and B Line Grade Crossing Update
Draft Transportation Element September 6, 2017
California Operation Lifesaver
Grade Crossing Safety Jason l. sanchez manager public projects
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
AASHTO Rail Resource Center Webinar Series
D Line Station Plan Overview
2016 SCORT Annual Meeting Federal Grant Opportunities
Chapter 5. The Transportation-Planning Process
Illinois department of transportation overview
Geometric Design: General Concept CE331 Transportation Engineering.
Changing the Definition
M14A/D Select Bus Service
Joint Police-Streets Committee Meeting
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Chicago to Council Bluffs-Omaha
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
NOME Leadership Summit – Wednesday, July 17, 2019
Presentation transcript:

HSR Crossing Safety Update Elliot A HSR Crossing Safety Update Elliot A. Ramos, PE 2016 SCORT Annual Meeting October 6, 2016 Good Morning,

History: Chicago-St. Louis Corridor Since 1980’s IDOT has been looking at this corridor for high-speed service EIS Completed Record of Decision received in 2004 1992 Designated a HSR Corridor For nearly three decades, IDOT has pursued improvements to passenger rail service between Chicago and St. Louis. IDOT has studied the development of HSR on the corridor since the mid 1980’s The Chicago to St. Louis corridor was designated a HSR corridor in 1992 IDOT completed environmental studies in 2003/2004 Added frequencies in 2006 Awarded ARRA funding in January 2010 Why? Chicago is the rail hub of the Midwest Provides connections: -through Chicago and other Midwest railroad destinations -to major Illinois universities -to Illinois’ state capital Ridership continues to grow

Chicago to St. Louis Corridor with 9 stops in between Current Improvements Between Joliet & East St. Louis 256 Total Grade Crossings 38 Crossing Closures 213 Crossing Construction Scheduled or Completed 5 Crossings outside of 110 limits The corridor runs from Chicago to St. Louis with 9 stops in between. The Illinois High-Speed Chicago to St. Louis Corridor is located along 13 counties (Cook, DuPage, Will, Grundy, Livingston, McLean, Logan, Sangamon, Macoupin, Jersey, Madison, St. Clair, and St. Louis) and has stops in the following cities: Chicago, Summit, Dwight, Pontiac, Bloomington-Normal, Lincoln, Springfield, Carlinville, Alton, and St. Louis. The current improvements are taking place between Joliet and East St. Louis. 13 Counties Cook, DuPage, Will, Grundy, Livingston, McLean, Logan, Sangamon, Macoupin, Jersey, Madison, St. Clair, and St. Louis

Who’s Involved? Project Partners Business Community General Public & Interest Groups Elected Officials Transportation Providers City/County Technical Staff Regional Agencies Project Partners Illinois Department of Transportation (IDOT) Federal Railroad Administration (FRA) Union Pacific Railroad (UPRR) Amtrak Illinois Commerce Commission (ICC) Others Who is participating in the development of the Illinois High-Speed Rail Chicago to St. Louis Project? The Illinois Department of Transportation’s (IDOT) Department of Intermodal Project Implementation is responsible for the overall project management and the development and implementation of the Chicago to St. Louis service. Project Partners include: Federal Railroad Administration (FRA) Union Pacific Railroad (UP)- Owner/Dispatcher Amtrak – Service provider Other railroads --Canadian National Railway (CN), Kansas City Southern (KCS), Norfolk Southern (NS), and Terminal Railroad Association of St. Louis Illinois Commerce Commission (ICC) Key representatives from the communities and cities along the corridor. A Project Management Consultant has been retained by IDOT to assist with the development, design, public involvement and implementation of the new service. Once the service has been implemented, the primary responsibility for on-going operations will be by Amtrak/Contract Service Providers. Extensive liaison with IDOT Highways, local agencies, ICC, FRA, and others Crossing Diagnostic Field Meetings and Design Coordination Meetings Detours coordinated with community

Proposed Safety Improvements Four Quadrant Roadway Gates Pedestrian Gates Right-of-Way Fencing SAFETY is TOP CONCERN

Grade Crossing Improvements Four Quadrant Roadway Gates Vehicle detection systems Inductive signal loops embedded in pavement Increased warning time: 80 sec. min. (for 110 mph trains) Improved roadway approaches Traffic signal interconnects New signage and pavement markings New signal systems – Positive Train Control (PTC) Incremental Train Control System (ITCS) Four-quadrant gates New signage and pavement markings Existing warning time 35 seconds No longer delays (train faster) More complex roadway projects and traffic signal projects constructed by IDOT. (Springfield: 2 quad gates, 40mph max) CHALLENGES: coordinating across IDOT Central Office and 5 District offices; Illinois Commerce Commission (agency in Illinois that regulates railroad crossing safety); local communities

Pedestrian Crossings Pedestrian Gates Maintain safe connectivity Fencing w/ escape swing gates ADA accessibility directive signage Crossing safety devices ADA accessibility directive signage Pedestrian crossings Pedestrian gates

Right-of-Way and Pedestrian Fencing Minimize trespassing Fencing typically will be placed within one-foot of the Union Pacific Railroad Right-of-Way: In Urban Areas In Select Rural Areas 6’ high ROW fence 3’ high fence at crossings Fencing committee led by ICC, UPRR Locations selected through more urban areas, show pedestrian characteristics, evidence of trespassing Agreement with UPRR: IDOT pays UPRR to maintain fence

Additional High-Speed Rail Information Visit the Program Website: www.idothsr.org Visit the Facebook Page: www.facebook.com/illinoishighspeedrail Call the Program Hotline: 1-855-IDOT-HSR (436-8477)

Thank you!