Story of No-Cost Energy Savings at Ohio Union

Slides:



Advertisements
Similar presentations
A CASE STUDY in actual energy conservation
Advertisements

Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
Energy Efficient Steam Systems
HEALTHCARE BUILDING AUTOMATION
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
Lodging HVAC and Refrigeration
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
TYPES OF MECHANICAL SYSTEMS
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building ®
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
Controlling Sutardja Dai Hall Andrew Krioukov Stephen Dawson-Haggerty, Jay Taneja David Culler.
Components of HVAC System
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Energy Efficient Steam Systems. Steam Systems Steam systems most widely used type of process heating Advantages of steam: –Heat carrying capacity of steam.
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Engineer Presentation
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Hydronic Mechanical Controls
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
Melcotel TM Features and Benefits Melcotel - Introduction New features –Links with up to 250 room units –Settings reset –Automatic switch OFF –Setback.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Beckhoff Building Automation New Automation Technology HVAC-Library Exercise Air Conditioning System.
VAV Box Control Loop The purpose of the VAV Box control loop is to adjust airflow through the box to maintain a space temperature. The difference between.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
October 2014 Rod Rabold Vice President, SERBCA Board of Directors SERBCA TECH TALK BAS Control Strategies for Energy Savings in Buildings SOUTHEAST.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Facilities Management and Design Chapter 7 HVAC Systems.
HEATING AND COOLING SYSTEMS
1 Hospital Building and Campus Piping. 2 Hospital Building Occupancy – office and patient areas Patient areas: 24 hours per day Office areas: 8 am – 5.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Wurster Hall MBCx Project October 30th, Project Overview Project Goals Project Objectives Identify Low Cost/No Cost Measures Identify Retrofit.
ANNEXE OFFICE CONVERSION. Heating Operation Two gas fired boilers provide hot water to two separate circuits, a constant temperature circuit and a variable.
The key to comfort and reduced fuel use for all heating and cooling The key to comfort and reduced fuel use for all heating and cooling.
WSHP Systems 1.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Fan Coil Controller FC/S 1.1
Building Automation System
High boiler output is only required on a few coldest days of the heating season. Most days even comfort could be provided with reduced energy expense.
Technology in Architecture
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
The most exciting DDC control to be introduced in the last 30 years.
The Trend BMS An Introduction to BMS
Energy Efficiency in District Coiling System
Roof Top Unit Overview (MAGNUM)
Engineering Presentation
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY
Objectives Finish duct systems Learn about plumbing systems
Loop Water Controller Overview
Air Conditioning System-1
The key to comfort and reduced fuel use for all heating and cooling
Project Overview Carrying out a 90.1 Appendix G Project
Minimizing Heating & Cooling Costs
‘‘ BUILDING AUTOMATION’’
Presentation transcript:

Story of No-Cost Energy Savings at Ohio Union Jeffrey Roe, Senior Energy Engineer Office of Student Life

Office of Student Life

Completed in 2010 338,407 square feet 15 Air Handlers Office of Student Life Completed in 2010 338,407 square feet 15 Air Handlers 3 Makeup Air Units 3 Restaurants + Catering Kitchen ~300 separate thermal zones

Office of Student Life

Learning Objectives 1. How to set up an effective team Office of Student Life Learning Objectives 1. How to set up an effective team 2. What buildings are good candidates 3. What changes were actually made

Effective Teams Have authority to make changes Office of Student Life Effective Teams Have authority to make changes Are willing to take the heat if problems arise Have measureable results

Effective Teams Getting buy in Must have directors on board Office of Student Life Effective Teams Getting buy in Must have directors on board

Effective Teams Include a member from each of: Energy management Office of Student Life Effective Teams Include a member from each of: Energy management Building Mechanical Services (Maintenance) Building Automation Services Director of events Building coordinator Audio visual Housekeeping If possible - coach/guru from local utility

What makes a good building candidate? Student Life What makes a good building candidate? Complexity Energy Utilization Index HVAC Complaints Staff Availability Metering

Ranking of utility costs Student Life Ranking of utility costs FY14 $/SF (FY15 rates) Ohio Union $ 3.46 Morrill $ 2.70 Lincoln $ 2.59 Hall Complex $ 2.34 Lawrence Tower $ 2.22 North Block $ 2.17 South Block $ 1.96 Mansfield Apartments $ 1.91 Hanley $ 1.85 Residence on Tenth $ 1.67

Student Life

Student Life

Student Life

Student Life

But what did we actually do? Student Life But what did we actually do?

What did we actually do? Set up a team meet weekly for 1 hour meetings Student Life What did we actually do? Set up a team meet weekly for 1 hour meetings Try to get a little better each week

Problems found Student Life Offline chiller’s pumps run, mixing warm return back into supply Excessive summertime heating demand Humidistats out of calibration CO2 sensors out of calibration Temperature sensors out of calibration Thermostats out of calibration Damper positions out of calibration Unoccupied mode did not reset supply air temperature Housekeepers leaving lights on Too much minimum air forcing VAVs into heating mode Dampers broken on VAVs Schedule mysteriously changes for one air handler Humidity in basement is so high that condensation forms on HVAC ducts Steam heat exchange air trap blows steam by Supervisory automation head end communication drops out Supervisory automation head end stopped allowing additional trends or trend studies Outsider air minimums set unreasonably high VAV setback temperatures unreasonably widely set Method of triggering unoccupied system to run was not logical Ventilation mode did not kick in until air quality already suffering Lighting control system not programmed Automation system set to run 24 hours a day Mixed air chamber pressure sensors set too sensitive Lag chiller short cycles Air handler discharge air temperature varies more than 4 degrees Boilers do not have reset schedule as per sequence of operations Thermostats ineffective in small rooms when doors are open

Control as best as possible Student Life Control as best as possible Control the lighting Control the chillers Control the air handlers Control the VAV boxes

Student Life Control the lighting Primarily this building has a stand alone lighting scheduling system This was too inflexible / hard to reprogram Similar systems in other buildings would “lose” the program Result – manual solution using overnight students with other primary job, sub-par efficacy New buildings have system tied to the building automation system. No standalone lighting systems.

Student Life Control the chillers Biggest problem: when a chiller fails, the primary pump keeps running Next biggest problem: staged chiller short cycling

Student Life

Control the air handlers Student Life Control the air handlers Schedule Hardware adjustments Outside air Discharge air temperature

Student Life

Student Life

Control the VAV boxes Cooling flow setpoints Heating flow setpoint(s) Student Life Control the VAV boxes Cooling flow setpoints Heating flow setpoint(s) Auto zeroing Locking temperature setpoint Humidity

Student Life

Ideal Student Life

Ideal Student Life

Too much minimum cooling Student Life

Too much minimum cooling Student Life Plus, heating valve doesn’t do anything

Too much minimum cooling Student Life

Too much minimum cooling problem Student Life Too much minimum cooling problem Too hot at beginning of occupied period Cools down below setpoint Switches to heating mode Dumps even more hot air in, also adding heat Return air to air handler is hotter than need be Air handler opens valve to 100% DAT and discharge enthalpy increase Fans speed increase to 100% More zones become starved and warm up Work requests or general complaining begins

Bad Thermostat Location Student Life

Bad Thermostat Location Student Life

Student Life Thank You Jeff Roe Roe.43@osu.edu