Mini dairy plant construction

Slides:



Advertisements
Similar presentations
Unlocking the Potential in Aqaba and Jordan
Advertisements

«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. Information On The Ground Area in Malaya Sosnovka Industrial Innovations Park There is no encumbrances.
“COVAL & CO” CANNERY Cantemir town, MD Tel/Fax: +( ) Cell: + ( Speaker: Nicolae Coval – General.
INVESTMENT POTENTIAL OF THE KIROVOHRAD REGION. GEOGRAPHICAL LOCATION Central part of Ukraine Territory: 24,6 thousand sq. km (4,1% of the total territory.
Taking the Mystery out of Economic Development Tools Chris Eng, Chisago County HRA-EDA.
23-25 September 2013 Bucharest Sector policies, institutions and governance Moldova National Association of Water and Sanitation Utilities (Moldova Ap.
Limited Liability Company 2011 june. 1 Description of the location 2 Main characteristics 3 Capacity and technological process 4 Services 5 Prospects.
PROPERTY SALE PRICE: ,00EUR Project: Property sale Land with existing industrial objects Main advantages of the property: -Existing industrial.
Corrected for Discount Rate.
Industrial park “Letnitsa”. Geographic situation IPL.
25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large.
2012 Investment project of cement plant construction in Soligalich municipal district of the Kostroma region.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
The Komi Republic (KR)is the subject of the Russian Federation, a part of the North-West Federal District. Area thousand sq. km. Population -
2012 Brick plant construction with annual capacity of 60 million pieces in Buj municipal district of the Kostroma region.
2012 Investment project of integrated house- building factory construction in Chyukhloma municipal district.
Further examples of: COMMUNITY PROGRAMS AT LAS CRISTINAS VENEZUELA.
IEE/12/064/SI /02/2015. Municipality of Kecskemét - General economic data  Capital of Bács-Kiskun county  Economic, administrative, educational,
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
Furniture shield production in Sharja municipal district of the Kostroma region.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
DAMBOVITA COUNTY COUNCIL MODERNIZATION OF S.C. MORENI INDUSTRIAL PARK S.A. Local initiative. Regional development.
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.
Kostroma, 2014 Investment proposal on creation of wood processing enterprise for pollution-free fuel (pellets) production in Sharya municipal district.
Production of construction materials: Production of the construction materials on the basis of the equipment MULTIMAT RH 300 (V) A, produced by German.
Agricultural enterprise Malynivske Zhytomyr region Malyn district Village Malynivka Tel
2012 Investment project of OSB production in Buj of Kostroma region.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
Investment perspectives of localization of Russian and foreign enterprises for mining service equipment and techniques production on the territory of Kirovsk.
Marketing of CCP's in Germany - Experience report of a German Company.
1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. - is situated in the centre of Russia on the border between Europe and Asia; - the territory is 88.5 thousand.
Erdeneburen HPP Project Implementation Unit
2013 Investment project on plywood production in Antropovo municipal district of Kostroma region.
Good Morning!. Case Study Dairy For testing in Graz Individualize by clicking View > Header and Footer.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
Kostroma, 2014 Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region.
«NAQLGAZMAXSUSQURILISH» Joint-Stock Company JSC «NAQLGAZMAXSUSQURILISH»
Tyumen Region  .
27-28 April 2015 Eng. Mubarak Yusuf Al-Kawari Presented by:
Knoxville Utilities Board June 21, 2016
Expanding Your Distribution Network Beyond the Transmission Pipeline
«NAQLGAZMAXSUSQURILISH»
Caspian Company مجری پروژه های نیروگاهی ، احداث مولد های مقیاس کوچک و سیستم های CCHP & CHP ohen staufen ring-20- koln – germany.
Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region Kostroma, 2014.
Information about the resort recreation area "Kenderli"
Management company of a special economic zone
PENZA REGION – TERRITORY OF INVESTMENT OPPORTUNITIES.
FUNDING PROPOSAL Authors: Mustafa Ehlizevak, Enes Kurbegović and Edvin Granić Gornji Vakuf – Uskoplje, february 2016.
KVARTS QVARTZ.
Expanding Your Distribution Network Beyond the Transmission Pipeline
The intermodal logistics capacity in the region of Záhony
Lyashkovsky community, Dnepropetrovsk Region
Investment passport of Kolomyia district
Industrial Zone Alatau district of Almaty
HPP USTIKOLINA Sarajevo, May 2017.
Investment Analysis.
Management company of a Special Economic Zone
PROJECT OF CONSTRUCTION OF POWER STATION ON BIOMASS 76 MW
10 MW BIOMASS POWER STATION CONSTRUCTION PROJECT
Welcome to Kostroma region!
Geothermal district heating in the city of Kecskemét MLEI GeoKec – City of Kecskemét (HU) 21/03/ /03/2016 IEE/12/064/SI /03/2016.
Commercial Land Plan of the land Photo of the land
KEDR Management Company LLC
Revitalization of Traditional Industrial Areas in South East Europe - ReTInA Short presentation Budapest, 2-3 July 2009.
Agriculture. AGRO Holding «KHLiBODAR»
Welcome to Kostroma region!
Commercial Land Plan of the land Photo of the land
Presentation transcript:

Mini dairy plant construction INVESTMENT PROJECT Mini dairy plant construction in the village of Rakivchyk, Kolomyia district, Ivano-Frankivsk region

Mini dairy plant construction Preliminary project cost 1 257,000 thousand US dollars Amount of investments 1 207,000 thousand US dollars

Mini dairy plant construction Project type: new production Investment mode: mixed form The project provides the construction of the plant and launching new technologies for the production of dairy products. Саpacity: 10 - 18 tons per shift (8 hours). Expected employment figures: 25 persons per shift Project validity period : 1 year

Mini dairy plant construction Company products: pasteurized milk, sour dairy drinks, cream, cottage cheese, soft cheese and whey

Mini dairy plant construction DEVELOPMENT PLAN (approximate configuration): Explication: 1. The milk-processing plant. 2. Boiler house 3. Compressor house 4. Local treatment facilities 5. Well 6.Transformator substation 7. Fire shield with fire ponds 8. Parking for trucks 9. Parking for the staff 10. Rest place 11. Rest place

Mini dairy plant construction Location and logistics: Sichovykh Striltsiv Str, village of Rakivchyk Kolomyia district Ivano-Frankifsk region Distance to Ivano-Frankivsk: 55 km Distance to Kolomyia:12 km Distance to railway : 400 m Available area for construction: 0,64 ha

Mini dairy plant construction Technical infrastructure Electricity Transformation station PS 110/10 Junction point (distance, m) capacity Junction point is 200 m  10 MW   Natural gas High pressure pipeline Junction point is in 100 mm; Water supply missing Sewerage missing  Telecommunications Internet Telephone line

Mini dairy plant construction Key figures of project economic effectiveness Expected annual sales revenue Net present value (NPV): Internal rate of return (IRR): Discounted pay-back period (DPBP):   13 10855,1 thousand UH 111,2 thousand UH 19,9% 2 years

Mini dairy plant construction Project advantages: Creating new jobs. The availability of raw material in the area. No dairy enterprise in the district. Providing population, educational, pre-school and medical institutions with high-quality dairy products.

Mini dairy plant construction Contact information: Village of Rakivchyk Kolomyia district Ivano-Frankivsk region e-mail: bogdan.kljuchivskiyy@rambler.ru Tel 38 0976334344