Fast High Current Thyristor SEB test

Slides:



Advertisements
Similar presentations
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Advertisements

LHC Beam Dumping system
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
FHCT SEB cross-section measurements at H4IRRAD and with cosmic rays and its influence to LHC abort system reliability Viliam Senaj RadWG meeting 04/10/2011.
MKD stack upgrade MKD generator meeting Viliam Senaj 23/06/2015.
MQXF state of work and analysis of HQ experimental current decays with the QLASA model used for MQXF Vittorio Marinozzi 10/28/
TEV DUMP SWITCH FAILURES OF 2/10/09 Dan Wolff/EE Support.
1 Efficient Analytical Determination of the SEU- induced Pulse Shape Rajesh Garg Sunil P. Khatri Department of ECE Texas A&M University College Station,
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
Proposed LHC beam dumping kicker generator modifications for LS2 TE-TM Meeting Viliam Senaj 07/07/2015.
Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi,
LIBD on LBDSmeeting Viliam Senaj 04/02/2014. MKB test MKB vacuum level satisfactory for beginning of HV test: – B1: between 3.1x10 -7 and 5.7x10 -7 (new.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
KEK R&D for LHC Plan of 800MHz Cavity Calculation of 400MHz Cavity 16 th September 2009, LHC-CC09 at CERN K.Nakanishi.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
Status of ATF Fast Kicker Experiment
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Actual Circuit Total inductance:15.4 H (154x0.1H) Total resistance:1 m  RB output current:13 kA RB output voltage:190 V Main Power Converter RB circuit.
TRIGGER DELAY 100µs. G. Gräwer AB/BT/ECLBDS Trigger Delay2 The trigger delay is a back-up system that generates an asynchronous dump trigger for MKD and.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
FHCT SEB cross-section measurements at H4IRRAD and consequences for MKD reliability Viliam Senaj LIBD meeting 24/01/2012.
SC Undulators protection and commissioning W. Venturini Delsolaro Acknowledgements: R. Denz, R. Maccaferri.
Zener Diode.
Electricity and its characteristics…  Conventional Flow theory states that flow of electrons is from positive to negative.(Accepted in the transportation.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
Introduction High Voltage!!.
Leakage current test & switched HV stress test of ALICE TRD / TPC capacitors TRD status meeting,
ELECTRICAL ENERGY AND POWER
AHMEDABAD INSTITUTE OF TECHNOLOGY
Devices used for Grid scale AC-DC and DC-AC power conversion
Limits and fits.
Małgorzata Godlewska, Krzysztof Górecki
ABB i-bus® KNX Valve Drive Actuator VAA/A
MQY-30 Test Result Report
Dependability Requirements of the LBDS and their Design Implications
Power Electronics Power semiconductor devices and diode circuits
Proposition of MKD & MKBH modification with the goal to reduce maximum voltage (and risk of erratic) Viliam Senaj, 05/05/2017.
LHC beam dump 7.56 TeV operation
Sparking of SPS electrostatic septa in presence of e-cloud
MKD Waveform Measurements
MKD/MKB Review Meeting Scope and Definition
LV Safe Powering from UPS to Clients
J. Uythoven for the MPE-MI & MS Teams
GROUND-FAULT GROUND-CHECK MONITOR
Overview of LBDS related tasks
FCC hh dump kicker - switch topologies and impact on beam
Dipole circuit & diode functioning
Circuits description and requirements - Closed Session-
Federico Carra – EN-MME
LHC BLM system: system overview
Attempt to non-destructive SEB testing of 1.2 kV SiC MOS
FCC-hh injection group 7
The Large Hadron Collider
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
We have been working on Investigating Circuits. Let’s Review…
COOLING OF POWER DEVICES
Details and Assumptions for Technology Requirements
General Physics (PHY 2140) Lecture 6 Electrostatics
Presentation transcript:

Fast High Current Thyristor SEB test Viliam Senaj, TE/ABT/FPS RAGWG meeting 18/01/2011

FHCT SEB test Motivation SEB failure rate estimation Test arrangement Preliminary results

Motivation LHC beam extraction generators (MKD) and sweeper of extracted beam over dump block surface (MKB) use stack of 10 FHCTs is series with maximum applied voltage up to 29.2 kV at 7 TeV (more than 2.95 kV per device due to voltage sharing accuracy); Generators are installed in UA63 and UA67 and are supposed to see certain level of radiation (not expected in time of design); FHCT producers (Dynex & ABB) estimate SEB failure rate due to cosmic rays (at sea level) to be 10-7 device hours at 2.8 kV (100 FIT); devices are custom modified and no in field statistics is available; 700 FHCTs are installed (x 200 days x 20 hours= 2.8x106 device hours per year); accurate FIT at 2.95 kV for the radiation expected in UA areas is unknown; Failure of a FHCT will provoke asynchronous dump (beam loses) and machine down time for generator replacement (more than one day due to need of re-calibration);

FHCT used ABB - 5STH20H4502 DYNEX - DG648BH45-185 Umax: 4.5 kV Udc: 2.8 kV (100FIT) Imax: 80 kA dI/dt: 20 kA/µs Ileak: 10 µA @3kV Load integral 8.105 A2s Wafer diameter ~ 60 mm

SEB failure rate estimation ABB simulation of a cosmic rays induced SEB FIT for similarly rated IGCT; Rating of the used components is 100 FIT at 2.8 kV; we can expect up to 2.95 kV on component (voltage sharing accuracy); According to the ABB simulation, 150 volts above 100 FIT corresponds to ~ 1500 FIT (15 x more); 1500 FIT for 700 components and 4000 hours per year gives more than 4 SEB per year which is non-acceptable; more accurate measurement of FIT at 2.9 kV will reveal if we need to add eg. 2 more components in series to reduce applied voltage and hence corresponding FIT rate.

ABB & DYNEX wafer with damage

Test arrangement

Preliminary results Measurements done for 5 FHCT of each family (DYNEX & ABB) with 4 kV applied and with current limitattion to 650 mA and with fast acting fuse 65 mA (time to broke ~500 µs); According to the ABB simulation, SEB failure rate at 4 kV due to cosmic rays can be estimated to ~3.105 FIT and hence MTBF should be ~300 device hours. FHCT protection found to be not good enough so only 156 h of test was done (780 device hours for each family) with the following results: ABB: 1 SEB Dynex: 3 SEB The current limitation and fast acting fuse helped to protect the FHCT from total damage, newertheless I2t was most likely too high and leaded to certain level of semiconductor deterioration – increase of a leakage current by more than 1 order of magnitude. New active protection with lower current and faster response is under construction

Active protection circuit