NEW PLASTIC MEDIA BLASTING FACILITY FOR AIRCRAFT FIGHTERS AND HELICOPTERS ADAPTIVE TO THE MOST STRINGENT SPECIFICATIONS FOR ENVIRONMENTAL PROTECTION WORLDWIDE.

Slides:



Advertisements
Similar presentations
Architectural Services Department HKSAR Laboratory Design for Secondary Schools.
Advertisements

N A V A L F A C I L I T I E S E N G I N E E R I N G S E R V I C E C E N T E R Mobile Sodium Nitrite Wastewater Treatment System Benefits:  $5M savings/year.
Jason Holland Permian Production Equipment, Inc. Welding, Cutting and Brazing Safety.
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
Protective Packaging and Materials Handling
Our Vision – Healthier Kansans living in safe and sustainable environments.
How would you explain this on the 3394? If Fire Erupts on YOUR Boat If Underway, stop the boat Have everyone who is not wearing a PFD put one on Position.
Core removal Howard Pickard LBBC Technologies Welcome
Onslow Beach Bridge Jacksonville, NC.  This project called for abrasive blasting and protective coating application to the Onslow Beach Bridge, a rotating.
Extensive culture: low intensity aquaculture providing only small increases over natural productivity. Extensive fish culture systems have low stocking.
Prepared by Farid Khalaf.  Protect the worker.  Protect the sample being analyzed.  Protect the environment.
Buildings and Structures 2 Natural and Mechanical Ventilation.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Spray Finishing Operations/Spray Booth March 9, 2009.
LNG Hazards.
Ventilation for Confined Spaces requires ventilation as follows: An employee may not enter the space until the forced air ventilation has eliminated.
PROPOSED EXPERIMENTAL PROTOCOLS AND ENHANCEMENTS OF THE EXISTING FACILITY Dr. ing. Ilinca Nastase – CAMBI Center.
TRI MARTIANA.  A good and effective ventilation system is necessary in a workplace which have processes that emit air contaminants such as dust, fumes,
MODULE “STRATEGY DEVELOPMENT”
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
VENTILASI TRI MARTIANA. Introduction A good and effective ventilation system is necessary in a workplace which have processes that emit air contaminants.
Flammable and Combustible Liquids Presented by Martina Schmeling Adapted From OSHA.
Fire Prevention for Construction. Four classes of fires  A, B, C, and D 1a.
CXS490 Carbon Dioxide Systems
© 2009 Michigan State University licensed under CC-BY-SA, original at Water Quality.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
(U-shaped tank) WATER TANK SLUDGE TANK This system makes it possible to recover the liquid part of the suctioned material in the sludge compartment.
E.Soundararajan R.Baskaran & M.Sai Baba Indira Gandhi Centre for Atomic Research, Kalpakkam.
Sulfur Hexafluoride (SF6) Gas Handling. Description Sulfur hexafluoride (SF6) in its pure state is inert, nontoxic, odorless, nonflammable and colorless.
LSU Petroleum Engineering Research and Technology Transfer Laboratory “The Well Facility”
Spray Booths Follow safe operating instructions. Spray-finishing operations  Organic materials  Inorganic materials  Dispersed form  Deposited to.
© 2012 Delmar, Cengage Learning Chapter 11 Engineering Controls.
TRUMAN MIDDLE SCHOOL Presented by Counsilman ▪ Hunsaker Facility Audit.
Fire Fighter Safety SCBA CHANGE/REFILL
Flammable Liquids Directorate of Training and Education
Why replace? When you can restore!. The MicroStrip System Low pressure, abrasive cleaning system Compressed air only / air & water Range of fine precision.
Prevention and Control of Influenza A (H1N1) in the Workplace Engr. Nelia G. Granadillos Chief, Environment Control Division Occupational Safety and Health.
Abrasive Blasting.
Concrete Repair.
USP 797 Guidelines: Compounding Areas and Equipment
SKRM Launching New Technology In Cupric Chloride Regeneration
WASTEMENEGEMENT IN BUILDINGS
John Christian President, Logistics, Processing and Disposal
visit for information)
BASIC FIRE SAFETY.
UNIT IV AUXILIARY SYSTEM
storage and External Transportation
(Refer to Chapter 2 of the textbook)
Respiratory Protection Training
Automated Surface preparation
Federal State Unitary Enterprise «Bazalt»
Flammable and Combustible Liquids
The 10 Principles of Sanitary Design for Equipment
Emergency Electrical Power Supply for Buildings
Sulfur Hexafluoride (SF6) Gas Handling
BASIC FIRE SAFETY.
Chemical Safety and Security Plan
BASIC PNEUMATICS.
OSHA’s Respiratory Protection Standard 29 CFR
MOLCOM & EHS.
RCRA Updates Larry L. Lamberth Enforcement and Compliance Branch
Spray Booths Follow safe operating instructions
OSHA’s Respiratory Protection Standard 29 CFR
BASIC FIRE SAFETY.
Hot Work Procedures Fire Control.
Effects of Cold on Military Vehicles
Pneumatic System Conditioning
Presentation transcript:

NEW PLASTIC MEDIA BLASTING FACILITY FOR AIRCRAFT FIGHTERS AND HELICOPTERS ADAPTIVE TO THE MOST STRINGENT SPECIFICATIONS FOR ENVIRONMENTAL PROTECTION WORLDWIDE P.M.B (PLASTIC MEDIA BLASTING FACILITY)

PROJECT’S MILESTONES IN BRIEF On May 15, 2007 the three party MOA agreement between HAI – Lockheed – Emvatis was signed for the erection of the new depainting facility for fighters and helicopters. The Process equipment were provided by PAULI SYSTEMS On June 11, 2007 the contractor Emvatis started at the site On Dec. 5, 2007 the entire integrated facility was completed (building, equipment, training). The project was completed within a six month period, a record time due to the complexity and specialization of the equipment. The facility will be utilized immediately for the depainting of the U.S. F-16 fighters under the CCIP program and in parallel for the Hellenic fighters and other strategic alliances.

FACILITY DESCRIPTION The facility is a model project where the increased productivity and reduction of operational costs coincides with the latest recycling technology and environmental friendliness. It consists of: The enclosure The suitable compressed air equipment system. The enclosure’s air ventilation system. The plastic media blasting system. The recycling system of the plastic media.

BUILDING INFRASTRUCTURE Enclosure Areas for electromechanical equipment Detail of the outlet for foam fire extinguishing system in the enclosure Observation and control room of the process

BUILDING INFRASTRUCTURE Movement of the bi-folding main door

Dehumidification and filtration unit DRY FILTRATED COMPRESSED AIR SUPPLY SYSTEM UTILIZED FOR THE BLASTING OF PLASTIC MEDIA ON THE SURFACES FOR DEPAINTING Dehumidification and filtration unit Air tank Compressor

VENTILATION SYSTEM OF THE ENCLOSURE Air intake grills During depainting, the air in the process area moves horizontally with a velocity of 50 fpm while is filtered continuously. Air suction Two separate Dust Collectors

PLASTIC MEDIA BLASTING SYSTEM AIRCRAFT PREPARATION PRIOR TO DEPAINTING Aircraft masking

PLASTIC MEDIA BLASTING SYSTEM OPERATORS’ PROTECTIVE EQUIPMENT There is special protective gear for the four (4) operators Suit Safety helmet Continuous supply of fresh air

PLASTIC MEDIA BLASTING SYSTEM DEPAINTING PROCESS USING PLASTIC MEDIA Depainting is performed by blasting the surface of the aircrafts with soft plastic media inside the process area of the enclosure. The method is the most sufficient for the substrate surfaces of fighter aircraft metallic and composites. The time needed to fully depaint an F-16 aircraft is 3 working days.

PLASTIC MEDIA BLASTING SYSTEM There are 4 – blasting systems with the suitable corresponding nozzles. Full capability to adjust both the pressure and flow of the plastic media.

PLASTIC MEDIA RECYCLING SYSTEM Plastic media collection trench The facility is fully automated with the capability to collect and reuse the plastic media It is mandatory for the process to maintain the reused media at the correct size and weight. Capability to recycle the plastic media at least 12 times during depainting. Particle separator for undersize / oversize and high density. Storage of the plastic media in a hopper for reuse

Plastic Media Blasting (PMB) Is one of the most modern facilities worldwide focused in the protection of the environment Advantages : Fully developed technology USAF approved for most type of aircraft Safe system for the operators Liquid wastes virtually eliminated. There are no VOC’s emitted to the atmosphere. The plastic media is recyclable Less operational cost compared to the old methods.