CIGRE 2005 SC B5 Contribution to Question 2-1

Slides:



Advertisements
Similar presentations
Energy Service Fossil Product Portfolio
Advertisements

OKLAHOMA TURNPIKE AUTHORITY Request For Proposals Pre Bid Meeting.
Robert D. Walla, Larry A. Hacker, Ph.D. Astrix Technology Group 1090 King Georges Post Rd Edison, NJ LIMS Selection In A Forensic Toxicology Laboratory.
Business Markets and Business Buying Behavior
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd Edison, NJ A Successful Approach to a LIMS Upgrade In A Public.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Financing Urban Public Infrastructure
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
ISO Tor Stålhane IDI / NTNU. What is ISO ISO 9001 was developed for the production industry but has a rather general structure ISO describes.
Lessons Drawing from Evaluations Relating to PPPs
Analyzing Business Markets
לירן קציר Connectivity in Computers IEC TC 57 - Power system management and associated information exchange Established in 1964 – with focus.
Industry Facilitation and Support Program (IFSP) Port Hedland/Newman Round Industry Participation Branch WA Department of Commerce Co-Funded by BHP Billiton.
Opportunities to Save Water Colorado Water Workshop – through Efficient Design, Appropriate Technology, and Effective Management.
ICOD Deployment Financial Benefits EHT NTERNATIONAL I.
1 Distribution Efficiency Conservation Voltage Regulation (CVR) Jillianne Welker 4/21/2009.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
International Council on Large Electric Systems Brasilia Workshop 22 September 2003 TRANSMISSION ACCESS AND CONGESTION MANAGEMENT O. Lavoine-RTE-France.
Facility Consolidation Proposal IEM 5121 July 21, 2003 Robert Volk.
IEEE SA SCC Full Revision PAR Development Meeting SCC21 Meeting – October 1-2, 2014 Piscataway, New Jersey Dick DeBlasio, IEEE SCC21 Chair Tom.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
Project Adventure Program at Mexico Academy and Central School.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
Business Utilities What is “utility”? Economic term that means…
Once the designer has decided to use and selected the correct Magna 3 pump in a specific application they must communicate these decisions to the contractor.
SC-B5 Colloquium Calgary 2005 CIGRE SC B5 COLLOQUIUM CALGARY Contribution to PS2 – Q#1 How does the specification team value this user input and rank prioritization.
Grades 6-8 iSquad Setting Up Teachers with Firefox.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Human features are those things created by man.
© Prentice Hall, © Prentice Hall, ObjectivesObjectives 1.A complete definition of a plan 2.Insights regarding various dimensions.
© Copyright 2003 Frost & Sullivan. All Rights Reserved. North American UPS Markets: End-User Study End Users Have Been Opting for Mid-range Power Units.
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
Supply Chain Management Minor
Overview Market Opportunities Market Challenges
Neighborhood Project Funds
Porter’s Competitive Forces
Problem-Based Learning Adapted from Nada Vukadinović, FNT
Feasibility.
TIPS IN TEACHING POETRY
Intern Opportunity we offer :
Lesson 5 Materiel Solution Analysis (MSA) Exercise Team#
BP – Project Planning (F)
Enterprise data center
Extension Risk Management Education
Strategic Managing Operational
CERN-ITER Workshop CERN Procurement Anders Unnervik 16 Jan 2017
Low temperature chiller Market Survey
ViaCC leakage detection of smoke, steam and liquids
Wholesale Electricity Marketing & Trading Fundamentals
Coordinated Workstation Purchasing Update
Arrector muscles Arrector muscles
Montreal Protocol HFC Management Workshop Paris July 2014
Automation Topics: Elements of an Automated System
A Novel Fault Current Limiter
الإقراض وتحليل الإئتمان ( 10)
Whole group instruction
Transfer of Medical Devices Manufacturing Technology
FIU Wellness Center: Presentation to the Director
Weighted Interval Scheduling
PBL LESSON: Quality learning
Weighted Interval Scheduling
Portfolio Analysis Mike Hopkins
Seventh Regional Public Procurement Forum, May , 2011
Shaimerden Chikanayev Partner GRATA Law Firm
Conducting a Target Hazard Analysis for Your Community
Annex A1.6.2b RU access to OBI RNE General Assembly 16 May 2018.
What is GEOSS? Funding for GEOSS? GEOSS users?
Presentation transcript:

CIGRE 2005 SC B5 Contribution to Question 2-1 Teacher Notes: Lesson Guide BROBLEM BASED LEARNING START WELCOME PRESENTATION YOUR EXPECTATION COURSE DESCRIPTION AND OBJECTIVES COMPARE PRACTICAL MATTERS COURSE REALIZATION WORKSHOP STEP BY STEP "LAZY DOG" COURSE MATERIAL LAZY DOG EXAMPLES 9 8 7 6 5 4 3 2 1 12 11 10 Peter Rietmann Switzerland peter.rietmann@ch.abb.com CIGRE 2005 SC B5 Contribution to Question 2-1

Ranking of Requirements (1) The ranking of requirements are driven by Nature of the project Time schedule, number of systems, frame contract Extension of a substation, new substation, refurbishment Distribution, Transmission, Industry, Utility Operation philosophy, Organization Manned or unmanned substation Department organization and responsibilities User groups Purchasing, Operation, Maintenance The Users’ requirements have to be valued differently Depending on e.g. nature of project and the operation philosophy

Ranking of Requirements (2) Substation Project / Type of substation Weighting factors are different from case to case. In case of … Critical substation (e.g. irreplaceable power plant connection) No risk on time schedule and planned outage time No room for experiments and R&D, but instead well-proven systems and equipment that have been on the market and in operation for some while are preferred even though newest developments could offer attractive features. Less critical substation (e.g. distribution with an alternative feeding direction) You may experiment some new functions and features and take more technology risks. If qualitative measuring is used, selection criteria and weighting factors shall be pre-defined in the specification

Ranking of Requirements (3) Example of how different Users weight requirements (3) (2) (1)