EMF ASSESSMENT BY MESEAREMENTS AND CALCULATION (IVORIAN CASE)

Slides:



Advertisements
Similar presentations
Ministerio de Transportes y Comunicaciones Legislative Treatment in Peru of Non- Ionizing Radiation from Telecommunication Dr. Carla P. Sosa Vela.
Advertisements

International Telecommunication Union EMF ASSESSMENT BY MESEAREMENTS AND CALCULATION (IVORIAN CASE) Guy-Michel KOUAKOU, Vice-chair of study group 5 (ITU-T)
IN-SITU MEASUREMENTS OF ELECTRIC, MAGNETIC AND ELECTROMAGNETIC FIELDS IN THE ENVIRONMENT Branislav Vulević, Čedomir Belić, Trajan Stalevski Public Company.
Update on EMF DG Sanco Health Information Unit Brussels, 27 March 2006.
ITU-T Technical Session on EMF
Nairobi, Kenya, 26 – 27July 2010 Role of ITU-T & ITU-R Ahmed ZEDDAM Ahmed ZEDDAM, ITU-T SG5 Chair France Telecom Orange ITU-T Workshop on Delivering Good.
Nairobi, Kenya, 26 – 27July 2010 EMF MEASURING IN KENYA Derick simiyu khamali Compliance and Enforcement Officer Communications Commission of Kenya ITU-T.
ITU-T SG5 activities on EMF
Quito, Ecuador, 14 August 2013 Assessing EMF Levels Guidance and Recommendations Mike Wood EME Management Education & Compliance Telstra ITU Workshop on.
International Telecommunication Union Seminar on Impact of Electromagnetic Field Emissions Kampala, Uganda, 3-5 September 2003 ITU-T activities in EMF.
Paolo Gemma, Senior Expert, Huawei
Kampala, Uganda, 23 June 2014 NATIONAL CAMPAIGN TO MEASURE NON-IONIZING RADIATION FROM RADIO INSTALLATIONS DALLY Brice Landry Technical Director VALSCH.
International Telecommunication Union Committed to connecting the world 4 th ITU Green Standards Week Mike Wood & Jack Rowley EMF Technical Group Leaders,
Current research work and plans Zbigniew M. Jóskiewicz Wroclaw University of Technology Institute of Telecommunication and Acoustics Wybrzeże Wyspiańskiego.
Overview of ITU-T's activities on EMF
Lima, Peru, 10 December 2013 Overview of ITU-T Activities on Human Exposure to Electromagnetic Fields (EMFs) Mike Wood, General Manager, Telstra EME Management.
Cristina Bueti Advisor, ITU-T Study Group 5
GSC: Standardization Advancing Global Communications Resolution GSC-10/05: (GRSC) Facilitating Liaison in Relation to Measurement Methodologies for Assessing.
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand.
Radio Interference Calculations
RF Safety Measurements IOSH meeting Emley 4 th July
RESULTS AND CONCLUSION
1 EMF ASSESSMENT BY MEASUREMENT (IVORIAN CASE ) GUY-MICHEL KOUAKOU Head of standardization service VICE-CHAIR OF STUDY GROUP 5.
Nairobi, Kenya, 26 – 27July 2010 Revue on RF Safety Reference Levels and Measurement protocols Christian BLANCHARD CEO Planet Network International ITU-T.
URSI Session "Large Scale Science Projects: Europe – Africa Connects" The 11 th IEEE AFRICON conference, September 9 – 12, 2013, Mauritius
International Telecommunication Union Committed to connecting the world 4 th ITU Green Standards Week Cristina Bueti Adviser of ITU-T Study Group 5 With.
A new challenge – creating a regulatory environment for implementing geo-location databases for White Space Devices (WSD) Andy Gowans Date (26 th January.
©Ofcom IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008 Andrew Gowans, Head of Exempt Technology.
International Telecommunication Union Accra, Ghana, June 2009 BRIDGING THE DIGITAL DIVIDE: EFFORTS OF GHANA Isaac Boateng Assistant Manager, Regulatory.
RF Exposure Audits EDDIE BULL Baldock Operations Manager Fixed and Mobile Monitoring and Measurements Section Radiocommunications Agency.
RALI FX3 Microwave Fixed Services Frequency Coordination Glenn Odlum Senior Engineer Spectrum Engineering Section
EMF STANDARDIZATION IN ITU
International Telecommunication Union Accra, Ghana, June 2009 AN AFRICAN VIEW ON THE OUTCOMES OF WTSA-08 Joshua Peprah Director, Regulatory Administration,
Committed to connecting the world With ICTs everywhere, how safe is EMF? Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group for Africa (SG5 RG-AFR)
Hoeffelman_BE_ALPHA 2_Block 1 Barcelona May EMI-EMF update Recent achievement and work going on in relevant WG’s Jean Hoeffelman ELIA- Belgium.
COMISIÓN NACIONAL DE COMUNICACIONES NON-IONIZING RADIATION THE SITUATION IN ARGENTINA Ceferino Namuncurá Speaker.
CEPT/ECC-ETSI Co-operation Process
NO ACTIVITY C SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)
Receive Antenna Performance Comparison. Receive Antenna Monitoring The receive antenna was installed in its permanent location inside the chamber A spectrum.
Gaborone, Botswana, July 2011 EMF Measurement Protocol and equipments (part II) Country Experience : France Jean-Benoît Agnani Engineer Agence nationale.
Committed to Connecting the World March 2011 Geneva, March 2011 Presentation of the Recommendation ITU-T K 100: Presentation of the Recommendation.
17/03/2016 Summary of FCC’s RF Exposure Proceeding Presented By: Bill Belt, TIA 1GSC-9, Seoul SOURCE:TIA TITLE:Summary of FCC’s RF Exposure Proceeding.
ENFORCEMENT AND REGULATORY APPROACHES IN MALAYSIA Aisharuddin Bin Nuruddin Senior Director, Technology & Society Division MCMC.
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
ITU Symposium on ICT, Environment and Climate Change (Kuala Lumpur, Malaysia, 21 April 2016) MEASUREMENTS AND CALCULATIONS OF EMF Fryderyk Lewicki, ITU-T.
A Global Approach to EMF Management and Standards Mike Wood Vice Chairman, ITU-T SG5, WP2 11th Symposium on ICT, Environment and Climate Change 21 April.
Agenda item 1.16 VHF data exchange system (VDES).
August, 2012 MBANS FCC Rules Summary Information document for SRD/MG on the FCC adopted MBAN rules under part 95 MedRadio service on 24 May 2012.
An evaluation of local interferences in the 0-3 GHz band
Assessing EMF Levels Guidance and Recommendations
پرتوهای غیریونساز دکتر میرشهرام حسینی پناه
Frequency Assignment Planning
Technical Session on EMF Introduction
Status On Current DFS CEPT/ECC Civil/Military Meeting, November 2016, Prague Thomas Weber, ECO, Spectrum Management
Thomas Weilacher Chairman ECC Working Group FM
Wi-Fi Alliance meeting
ITU Workshop on “With Information and Communication Technologies (ICTs) everywhere - how safe is EMF in Latin America ?” (Lima, Peru, 10 December 2013)
Overview of ITU-T's activities on EMF
GSM Base Station Antennas
Frequency Assignment Planning
Cristina Bueti Advisor, ITU-T Study Group 5
EU-US-JP ITS Steering Group Annual Meeting 2018
4th ITU Green Standards Week
GSC: Standardization Advancing Global Communications
GSC: Standardization Advancing Global Communications
4th ITU Green Standards Week
Cristina Bueti Advisor, ITU-T Study Group 5
GSC: Standardization Advancing Global Communications
ECC actions on interference from 5 GHz RLAN into meteorological radars
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

EMF ASSESSMENT BY MESEAREMENTS AND CALCULATION (IVORIAN CASE) ITU FORUM ON IMPLEMENTATION OF DECISIONS OF WTSA-08 (Accra, Ghana, 16-17 June 2009) EMF ASSESSMENT BY MESEAREMENTS AND CALCULATION (IVORIAN CASE) Guy-Michel KOUAKOU, Vice-chair of study group 5 (ITU-T) Head of standardization (ATCI) Accra, Ghana, 16-17 June 2009

Flowchart for measurement Measuring equipment Post-processing analysis PLAN National context EMF assessment Flowchart for measurement Measuring equipment Post-processing analysis Some statistics Conclusion Accra, Ghana, 16-17 June 2009

No legal protection framework in place for EMF related health issues. NATIONAL CONTEXT (1/2) Major public concerns, misinformation about EMF health related issues and particularly EMF effects from base stations. Many people are against the installation and deployment of base stations in their neighbourhoods. No legal protection framework in place for EMF related health issues. Accra, Ghana, 16-17 June 2009

NATIONAL CONTEXT (2/2) ATCI (National Regulatory Authority) ensures the need to protect human health by adopting international standards such as: ITU-T recommendations for compliance and estimation of EMF (K.52, K.70) ICNIRP (International Commission on Non-Ionizing Radiation Protection) recommendation for exposure limits CEPT recommendation for measurement procedures (ECC(02) 04 revised) Accra, Ghana, 16-17 June 2009

EMF ASSESSMENT (1/2) Measurements campaign in the town of Abidjan (the capital) were carried out in the 10 KHz to 6 GHz band First step: 103 locations were identified but later restricted to 43 using a decision level of 0.3 v/m. EMF Estimation for these locations were carried out using the EMF estimator (K.70) and technical characteristics of base stations at the various points. Accra, Ghana, 16-17 June 2009

some words about measurement protocol EMF ASSESSMENT (2/2) In situ measurement: about 3 hours per location (1 month for all locations) some words about measurement protocol Based on three cases; Case 1 for quick overview to find the point where the field is higher (1.1, 1.5, 1.7) Cases 2 & 3 for detailed investigation which allow to scan variable frequency band to deal with specific services Accra, Ghana, 16-17 June 2009

FLOW CHART Accra, Ghana, 16-17 June 2009 Résultats> limites CIPRNI Exigences de protection de la santé respectée Exigences de protection non respectée Résultats> limites CIPRNI Accra, Ghana, 16-17 June 2009

ANTENNESA EME SPY 120 (88Mhz - 3Ghz) MEASURING EQUIPMENT For case 1: RF radiation meters with isotropic field probes and a dosimeter EMR 300 W/G (10 Khz - 3 Ghz) ANTENNESA EME SPY 120 (88Mhz - 3Ghz) Cases 2 & 3: Spectrum Analyser x y z Champ EM émis par plusieurs services (TV, FM, GSM …) Sonde tri axe Boîtier de commutation Analyseur de spectre Anritsu MS2721B Accra, Ghana, 16-17 June 2009

Combined standard uncertainty (66% ) Expanded uncertainty (95 %) POST-PROCESSING (1/2) Measurement uncertainty estimation according to IEC guide: For each case equipment uncertainty was taken into account. CAS 2 Input quantity Uncertainty of xi U(Xi)(%) Ci (CiU(Xi))2(%) Value (dB) distribution Antenna Factor 2,00  normal 25,89 1,00 12,95 Cable 0,20   2,33 1,16 isotropy 1,70 rectangular  21,62 12,48 Receiver Combined standard uncertainty (66% ) 21,29 Expanded uncertainty (95 %) 41,74 IEC “Guide to the expression of uncertainty in measurement Ed. 1, 1995 Accra, Ghana, 16-17 June 2009

POST-PROCESSING (2/2) GSM measurement extrapolation was considered for maximum possible traffic. Measurements were done only for the permanent control channel. The extrapolation to the maximum traffic is then calculated by the following formula Emax = E Control Channel x sqrt (n Transmitters) The determination of « n » was done in accordance with typical base stations configurations. For each location an extrapolation factor was estimated. Accra, Ghana, 16-17 June 2009

RESULT Every measurement was found to have been in compliance with ICNIRP limits. Accra, Ghana, 16-17 June 2009

Average field level per service SOME STATISTICS (1/3) Average field level per service The average field level per service was low (under 1V/m) except for GSM service where the average levels were 1.336 V/m for GSM 900 and 2.67 V/m for GSM 1800 Accra, Ghana, 16-17 June 2009

Ratio between average value and ICNIRP limits SOME STATISTICS (2/3) Ratio between average value and ICNIRP limits According to ICNIRP limits. GSM 900 represent 3.31% and GSM 1800 represent 4.70% Accra, Ghana, 16-17 June 2009

Field level distribution per service SOME STATISTICS (3/3) Field level distribution per service For GSM 900 : 98 % of field levels was less than 10% of limits value (4 V/m) ; For GSM 1800 : 89 % of EM field was less than 10% of limits value (5.68 V/m); Accra, Ghana, 16-17 June 2009

CONCLUSION ATCI will work with GSM operators to reduce the level of exposure (mitigation techniques proposed by recommendation ITU-T K.70).  Use of EMF estimator to assess the compliance of base stations before their installation. Ongoing works: Assessment of base stations compliance by measurements in each sensitive location; Preparation of a gentlement agreement between operators, consumers and local authorities for base stations deployment; Data base for all base stations available on request for public information. Accra, Ghana, 16-17 June 2009