Second SPL Collaboration Meeting, Vancouver May 2009

Slides:



Advertisements
Similar presentations
EMMA RF System Summary RF Requirements (S Berg): Aperture: –Aperture 34.7 mm (min) –Dispersion effects may increase by 3 – 4 mm Frequency: –Frequency range.
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Lorentz force detuning measurements on the CEA cavity
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Christopher Nantista ILC 2 nd Baseline Assessment Workshop (BAW-2) SLAC January 18, …… …… …… … ….
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
1 Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
1 Update on Q2 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions after feedback from plenary on Tuesday New Option.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
1 Update on Q2 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions after feedback from plenary on Tuesday New Option.
RF Summary SLHIPP – 1 o. brunner BE-RF. RF sources and beam dynamics: o Magnetrons (Amos Dexter Lancaster Univ. ) o LLRF for the SPL SC cavities (Wolfgang.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
Ingot Niobium Workshop RF Sources Andrew Kimber 4 th December 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson Science Associates,
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
SPL waveguide distribution system Components, configurations, potential problems D. Valuch, E. Ciapala, O. Brunner CERN AB/RF SPL collaboration meeting.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
650 MHz Solid State RF Power development at RRCAT
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Linac 4 SPL tunnel Material access and services shaft Personnel and material access shaft Klystron gallery Emergency exit shaft Transfert line to PS2 Personnel.
Integration Open Questions (some urgent questions only … ) ◊Position of the couplers ? ◊Will there be a separate cryoline? ◊Architecture of the RF power:
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Cost Optimization Models for SRF Linacs
Cryomodule test stand at ESS site
WP5 Elliptical cavities
Uppsala Commitment to ESS and FREIA Planning
Plans for a Superconducting Proton Linac at CERN
A frequency choice for the SPL machine: Impact on hardware
SPL Collaboration Meeting PAC2009
Chris Adolphsen Sergei Nagaitsev
General presentation about recent status of DRFS
ESS RF Development at Uppsala University
CLIC Klystron based. Updates 2017.
CEPC RF Power Sources System
LLRF Control System Outline Scope Requirements Design Considerations
LLRF Control System Outline Scope Requirements Options considered
Low Level RF Design Outline Scope Requirements Options considered
CLIC Feasibility Demonstration at CTF3
RF introduction Anders Sunesson RF group leader
ERL Director’s Review Main Linac
Presentation transcript:

Second SPL Collaboration Meeting, Vancouver May 2009 RF power distribution in HINS - R. Pasquinelli Multiple cavities from klystron power source is the preferred option. Klystrons are the best choice at this frequency, choice strongly cost driven. IOTs, solid state not real contenders. (Costs per watt) Waveguide system, RF distribution via chain of hybrid couplers, with vector modulators, circulators, remote trombone phase adjustment Layout well defined, advanced designs for the main components, testing will start. Must ensure waveguide components are of good quality – reliability issues, select good manufacturer, accept the cost. LLRF control (klystron loop, VM loops) will be modeled. Second SPL Collaboration Meeting, Vancouver May 2009

RF Power Distribution – E. Ciapala Comparison of schemes for SPL Configuration Cost for 4 cavity 'unit‘ (Eu) For Against Option 1) Four cavities per Klystron 2420 Fewest power sources Complexity, bulk, power overhead, fault tolerence… Option 2) One Klystron per Cavity 2880 Reduced hardware inventory, minimum R&D, fully independent control, minimum RF power overhead, best fault tolerance, easy upgrade to HPSPL Number of power sources Option 2a) One IOT per cavity 2520 As above, perhaps cheaper & more compact HPSPL would need doubling of IOTs, or larger rating IOTs Option 3) Two cavities per Klystron Half the number of klystrons Need full hardware set, associated R&D, Power overhead, Reduced flexibility wrt option 2 Option 3a) Two cavities per Klystron Without VMs 2370 Half the number of klystrons, more economical than Option 3 Risk for higher intensity? => Options 2 & 2a are the most attractive (single power source per cavity) Second SPL Collaboration Meeting, Vancouver May 2009

RF Power Distribution – Contd. Check costing in detail Single power source is the preferred option. Put effort into finding best & most economical power source - IOT, Klystron, or Magnetron (CI collaboration). Collaborate with other projects, institutes & industry on IOTs. There is general interest for many applications at CERN Upgrade LP to HPSPL not a big concern for the RF power systems proper, 6m tunnel – can we reduce ? – how to connect the tunnels Klystron Modulator – HPSPL 50 Hz – Cost, Size & ‘footprints’ in klystron tunnel & surface buildings need to determined urgently. Second SPL Collaboration Meeting, Vancouver May 2009

Definition of Workpackages, External & CERN. Essential CERN activities – from first collab meeting Costing of single klystron per cavity option, also considering integration issues. (End June 09) ONGOING Integration and Layout of the various options. In particular layout of distribution system in the two tunnels, klystrons (vertical or horizontal) and modulator layout for HPSPL (See below) – URGENT CERN) Ongoing RF & TS Test stand 704 MHz, 5 MW. Needed for HP tests of RF equipment, klystrons, waveguide proto layout, later for test of cryomodules then klystron modulator for HPSPL. (CERN) Depends on allocated resources - Reduced options e.g SM18 cryo staging Development / construction of the LPSPL vector modulator for test stand.   Second SPL Collaboration Meeting, Vancouver May 2009

Definition of Workpackages, External & CERN. CI interests Klystron Review Add IOTs & Magnetrons to this (CI) suggest September 2009 Development of a long pulse Phase Locked Magnetron solution where one magnetron is used per cavity. Demonstrate feasibility at the 1 kW power level, develop a modulator design for high power operation, generate interest from a magnetron manufacturer to produce a 1 MW long pulse 704 MHz magnetron and perform a cost analysis. Seek further funding to complete high power development. (CI independent program initially) Get CI Proposal Second SPL Collaboration Meeting, Vancouver May 2009

Continuing activities Check RF option costings in detail Detailed Layouts – for tunnel integration (Sources, VMs & circulators) Klystron/Cavity waveguide routing Klystron Modulator for HPSPL 50 Hz Cost, Size & ‘footprints’ in klystron tunnel & surface buildings need to determined urgently. Magnetron (CI collaboration) proposal on PL magnetron, initial specs Collaborate with other projects, institutes & industry on IOTs. Second SPL Collaboration Meeting, Vancouver May 2009

Definition of Workpackages, External & CERN. Other CERN-CI interests Understand the phase and amplitude tolerances as a function of location in the Linac and complexity of the LLRF. (CI – CERN collaboration) suggest April 2009 June Determine a specification for the high power vector modulators and simpler phase shifters as a function of LLRF control system and beam power. (CI – CERN collaboration) suggest April 2009 (December 09 – with AB LLRF Specialists Studies of the overall HPRF system as the layout develops and characteristics of components become known. Consider inter-cavity coupling, losses, power equality, effect of reflections, beam induced signals etc. We would base this on a few selected topologies. (CI – CERN collaboration) suggest April 2010 Determine the power overhead need by the control system to meet phase and amplitude tolerances in the presence of Lorentz detuning and microphonics. (Not enough is known to address this issue yet) suggest July 2011 Develop and & demonstrate vector modulators at the highest power level and the 50Hz repetition (CI – CERN collaboration + UK industry?) suggest December 2010 Develop a remote variable splitting technology. (lower priority CI activity) suggest December 2010 Non off-the-shelf components - design, prototypes. Second SPL Collaboration Meeting, Vancouver May 2009

Definition of Workpackages, External & CERN. ESS Bilbao interest Design study and development of the Klystron Modulator for HPSPL. The 50 Hz modulator for the HP SPL is a new and very different device from that of the LPSPL. Upgrade probably means complete replacement. A collaboration with CERN, ESS Bilbao and industry should look at topology, specs and the design. Integration is also an important issue. (ESS Bilbao & CERN TE PO) Remains URGENT Second SPL Collaboration Meeting, Vancouver May 2009