Low Impact Development Structures for Educational Opportunities

Slides:



Advertisements
Similar presentations
Rain Garden Demonstration Sites to Promote Groundwater Protection Madeline Flahive DiNardo, Agricultural Agent Amy Boyajian, Student Intern Dr. Christopher.
Advertisements

Urban Low Impact Development English + Associates Owner Architect Construction EcoServices Storm-water Tank Contractor General Contractor T&T Construction.
City of Burlingame Rain Garden
CITY OF HOUSTON FLOODING & DRAINAGE COMMITTEE PUBLIC WORKS AND ENGINEERING May 18, 2010.
Rain Gardens for Clean Streams. Did you know? Up to 70% of pollution in streams, rivers and lakes comes from storm water runoff. rivers and lakes comes.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
December 3, 2012 Laurel Woodworth Center for Watershed Protection.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Ms. Gripshover Landscaping Unit 18 INSTALLING PATIOS, WALKS, AND DECKS.
Reducing Storm Water Runoff on Your Homesite 6090 Wedgewood Road Medina, OH (phone) (fax) Local leadership for soil and.
River-Friendly Program Goals Promote land stewardship Partner with people in the community Reduce nonpoint source pollution entering our local waterways.
City of Kimball Stormwater Re-use Project Protecting our Water Resources – a Forum Series for Policy Makers March 30, 2011.
1 Project History The previous group had designed and constructed their own rain garden. It featured several components: Two rain barrels Rock swales leading.
1 Hillel House Rain Garden 4/20/09 Matt Leon – Senior, OLS (Project Leader) Rachel Machbitz – Freshman, Engineering (Project Liaison) Emily Pohlman - Senior,
Coastal Smart Growth s/index.htmhttp:// s/index.htm
UVM-AWRA CHARRETTE: designing an alternative stormwater treatment technique W h a t I s a C h a r r e t t e? A Charrette is a cross-disciplinary workshop.
Through funds made available from a 319 grant focused on water quality issues in the Spring River Watershed, plans for a demonstration Rain Garden were.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Catching Rain One Barrel at a Time Dr. Dotty Woodson Extension Program Specialist Water Resources Texas AgriLife Research and Extension Urban Solutions.
Chapter 29 Landscaping.
Blue Thumb From Streets to Streams Shoreline Plantings.
THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.
Homeowner BMPs Aileen Driscoll Farid Jake Brinkman Jennifer Hughes.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
LID Cost Considerations “ALL Technologies” Project Life Cycle Planning Design Construction Operation Maintenance Recapitalization Decommission.
Water Management and Conservation in the Landscape (outline) The Water Cycle Stormwater: runoff, conveyance and treatment with urban infrastructure, discharge.
A combination of warm weather grasses, terrestrial and aquatic plants in and around the spring Stormwater Management Plan for College Springs Park Benjamin.
WARE RET 2014 –Rain Garden Construction-C. Leon King High School Nicole Richards-Works 1, Ryan Locicero 2, Dr. Maya Trotz 2 1. C. Leon King High School;
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
Do You Know Game Instructions 1. Print out the slide show 2. Cut out the questions found on every other page to be 4 inches wide and 4.5 inches high. (It.
BPRD DISTRICT OFFICE AND RIVERBEND PARK Robin Laughlin, ALSA, RLA.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Taking the Next Step: Implementing the TMDL. What IDEM Provides to Help With Implementation  Compiling all the data in one place  Data-driven recommendations.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Sediment & Nutrient Management in the L’Anguille River Watershed St. Francis County Cost Share Project Patricia Perry St. Francis County Conservation.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
SAGHA Annual Homeowners Meeting August 28, Agenda  Collect ballots  Treasurer’s Report  Common Area Maintenance Presentation  Election Results.
 Holds water in the landscape so it infiltrates (drain) into the ground.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Documenting Self Inspections The City of Hendersonville Department of Public Works Erosion Control Self Inspection Form Power Point Presentation.
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
Lower Rio Grande Valley Low Impact Development (LID) Implementation and Education by Brianna Saenz,MS, EIT AUGUSTO SÁNCHEZ-GONZÁLEZ, M.S, CFM. Institute.
Rutgers, The State University of New Jersey Climate Change and Agriculture in New Jersey Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
NJDEP Stormwater Program-Update
Eps: Campus rainworks challenge
GREEN STREETS | GREEN JOBS | GREEN TOWNS INITIATIVE
Preventing and Reducing Pollution From MS4 Activities
LOW-IMPACT DEVELOPMENT
Your Public Water System’s Cross-Connection Control Program
City of New Braunfels Watershed Management Programs
Rain Gardens for Clean Streams
City Council Meeting December 20, 2016
Reuse “the action of using something again”
Iowa Aquaculture Conference
By: Lucas Hendrickson, Ian Strasburg, John Koets, and Shenquan Li
Low Impact Development: Stumbling Blocks or Stepping Stones?
Washington County Parks and Open Spaces
EPA Public Meeting Dallas, Texas May 10, 2005
Rainwater Harvesting – Capturing Nature’s Best
Human Activity and Ground Water
State Agency Perspective of Estuary Program Subcommittees
Human Activity and Ground Water
Rainwater Harvesting – Capturing Nature’s Best
Human Activity and Ground Water
What is a rain garden? This presentation is designed to introduce the importance of rain gardens and explain how rain gardens function. Notes are included.
Environmentally sensitive areas
Nonpoint Source Program
Presentation transcript:

Low Impact Development Structures for Educational Opportunities 2017 EPA Region 6 Stormwater Conference San Antonio, TX Lauren Willis Guadalupe-Blanco River Authority lwillis@gbra.org 830-379-5822 Good afternoon, my name is Lauren Willis and I’m with the Guadalupe-Blanco River Authority and I work in the Water Quality Department. I’m going to speak about the Low Impact Development structures we’ve constructed and how to use these as educational opportunities How many of you have been involved in Low Impact Development projects?

319 Nonpoint Source Grant with TCEQ Geronimo and Alligator Creeks Watershed Protection Plan (WPP) Implementation - Education and Outreach Goals Address the bacteria impairment and nutrient concerns in Geronimo Creek Enhance public understanding of the health of a riparian ecosystem Tasks Riparian Education Nonpoint Source Pollution Education Demonstration of Low Impact Development Practices Total Project Costs $306,667 Partners Texas AgriLife Extension Service Irma Lewis Seguin Outdoor Learning Center We received a 319 NPS grant from the TCEQ to focus on the Geronimo & Alligator Creek WPP Implementation focusing on education & outreach. The two main goals are to: The three main tasks include: I’ll be focusing today on the Demonstration of Low Impact Develop Practices. The total cost of the grant is a little over $300,000 including federal and non-federal money. The LID construction projects cost about $112,000 for the 6 structures we’ve been working on. GBRA and project partners oversaw the development and design of 6 Low Impact Development Structures. Workshops are be offered (the grant requires 3 ) by Texas AgriLife and are open to municipal officials, municipal staff, developers, landowners, adult education for Master Naturalists and Master Gardeners, etc.

Irma Lewis Seguin Outdoor Learning Center This is a map showing where the Irma Lewis Seguin Outdoor Learning Center is located. The mission of this organization is to: Here you can see where the Geronimo Creek is located on the property following the blue line. The total facility has 115 acres of land to provide an outdoor classroom for all school ages. Seguin, New Braunfels and Comal ISD all visit annually. The LID structures were installed on the property The 1st structure to be installed was the Rain Water Harvesting System. Here you can see this is connected to a barn which is used for social gatherings Mission To provide an educational experience for all ages in a natural setting. The Geronimo Creek flows through the ILSOLC facility (115 acres) and is used as part of an outdoor “classroom” for learning about nature and the environment. School children of all ages from the Seguin, New Braunfels and Comal ISDs visit the facility annually.

Rainwater Harvesting This 5,000 gallon rainwater Harvesting tank was our first project to be installed along with the signage that’s 4ft x 3ft size The goal of all the signage is to be self explanatory for all individuals visiting the property. All signs list the ‘Benefits’ and ‘How it Works’

Rainwater Harvesting 5,000 Gallon Tank Construction Cost: $11,000 $7,000 Tank, sand pad and rock aggregate $300 brick ring and gravel around tank $1,500 160 linear feet of gutters $700 general construction supplies & gutter downspout to tank $900 Pump, pump wiring and weather-proof structure $275 irrigation supplies to garden Signage Cost: $450 $280 build frame $156 printing signage Construction Time: 1 Week Construction Time includes: 1 day to install gutters, 2 days for the tank, 1 day to build signage and trench line for irrigation Installation of pump was done by on sight personnel (counted towards volunteer hours) Something that is unique for this structure is that it had Turn Key installation and very easy to get bids on

I want to put this map up to show you where all our structures are located. The second structure to be installed is the Rain Garden.

Rain Garden Before After The excavated area is 45 feet long, 20 feet wide and 5 feet deep 1 foot of #57 stone The underdrain system was necessary because of the clay soils – 4in perforated pipe with 1% slope towards the riser pipe Add 2 inches of washed #78 choke stone on top of pipes 2 inches of sand 2 feet of (6 inch lifts) engineered soil that needs to be boot compacted – NO machinery (we didn’t take into account the boot compaction = $1,000 more in materials) 3 inches of mulch (riser pipe is 6 inches above the mulch – used as an overflow during high rain events) After

Rain Garden Outfall During a high rain fall event – the riser pipe comes into play Riser pipe is 6inches above the mulch

Rain Garden Acres of drainage: 4-5 Acres Construction Cost: $42,000 $29,225 Excavation and labor for project $8,100 Materials from New Earth $1,200 Drainage $400 Fencing $1,500 Sod $1,300 Plants $275 Irrigation for new plants and sod Project Oversight: $12,000 Signage Cost: $450 $280 build frame $156 printing signage Construction Time: 4 weeks using a 2-3 man team Cost of materials: $13,000 Cost of project oversight was the key to our success. We hired an professional environmental engineer, Lisa Arceneaux. She helped in making sure that the design was appropriate for the land, specifications of the rain garden, the construction company was following the appropriate rules of installation (i.e. boot compaction of engineered soil), tested the engineered soil for drainage/retention, helped provide maintenance sheets for the structures, etc. I do have copies of these maintenance sheets is anyone would like to see one. We didn’t take into account the boot compaction = $1,000 more in materials The bid process took about a month – barrier to overcome was finding companies to bid such a small project.

Here, this is the signage produced for the Rain Garden Here, this is the signage produced for the Rain Garden. This hasn’t been printed and installed to date but will be produced using that same size and frame as the Rain Water Harvesting (4ft x 3ft). You will see that all the signage has a definition of the project, benefits, how it works and definition of stormwater. Again, the goal of all the signage is to be self explanatory for all individuals visiting the property. To accompany the signage we will be getting a clear pvc pipe to show the multiple layers and the depth of each layer

Here’s our Arial map again, and the 6 space pervious parking lot was installed just outside of the main office.

Pervious Pavement Before After After The excavated area is 50 feet long, 20 feet wide and 8 inches deep (phone and electric lines that weren’t found during the line locate) Setting of the concrete ribbon Stabilizing filter fabric to keep the gravel layer from embedding into the clay The underdrain system was necessary because of the clay soils – 4in perforated pipe with 1%-2% slope 8 inches of #57 stone (bobcat was used for compaction – make sure that the stone is 1in below the height of the concrete ribbon) True Grid snaps together 4ft x 4ft panels 1in thick #78 pea gravel 5 parking spaces Sturdy enough to drive a fire truck on it After After

Pervious Pavement Construction Cost: $21,000 Project Oversight: $6,000 $16,000 Excavation and labor for project $400 Stabilizing Filter Fabric $1,400 Gravel $2,100 TrueGrid Material $400 Drainage $250 Concrete Ribbon Project Oversight: $6,000 Signage Cost: $450 $280 build frame $156 printing signage Construction Time: 3 weeks using a 2-3 man team $5,000 material costs $3,000 for the concrete ribbon if you hire someone to install it The bid process took about a month – barrier to overcome was finding companies to bid such a small project. She helped in making sure that the design was appropriate for the land, the construction company was following the appropriate rules of installation, helped provide maintenance sheets for the structures, etc. I do have copies of these maintenance sheets is anyone would like to see one.

Here, this is the signage produced for the Pervious Pavement Here, this is the signage produced for the Pervious Pavement. This hasn’t been printed and installed to date but will be produced using that same size and frame as the Rain Water Harvesting (4ft x 3ft). You will see that all the signage has a definition of the project, benefits, how it works and definition of stormwater. Again, the goal of all the signage is to be self explanatory for all individuals visiting the property.

Here’s our Arial map again, and our last installation is the vegetated swale

Vegetated Swale Before After This structure is an example of a low cost project. Here, we used a drainage ditch located just below the Rain Garden. Chose not to do any additional grating or add any additional features We lined this swale with cedar posts in order to help with the maintenance (we ran into a barrier when a member of the board didn’t like the way it looked and have the maintenance staff mow it) By adding the cedar posts it gave definition to the structure. We planted rye grass in the late fall and will add in additional seed in the spring. After

Project Oversight: None Signage Cost: $450 Vegetated Swale Construction Cost: $98 $65 Cedar Posts $33 Seed Project Oversight: None Signage Cost: $450 $280 build frame $156 printing signage Construction Time: 3 days using a 2 man team

You will see that all the signage has a definition of the project, benefits, how it works and definition of stormwater.

Guadalupe-Blanco River Authority Questions? Lauren Willis Guadalupe-Blanco River Authority lwillis@gbra.org 830-379-5822 Future projects include a 2nd pervious pavement parking lot using pervious pavers and the final structure will be a landscape demonstration plot using different turf grasses and native plants that promote water conservation, proper use of fertilizers and water usage, etc. (partnering with Dr. Jake Mowrer at TAMU in the Soil and Crop Sciences Department)