Preparatory Measurement

Slides:



Advertisements
Similar presentations
Install L2 Switch Head End CATV
Advertisements

© Samsung Electronics. All Rights Reserved. Confidential and Proprietary.
40m Suspension Electronics Benjamin Abbott California Institute of Technology 10/18/01 G R.
USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack.
1 1. Power over Ethernet (PoE) Switches 2.Connection to IP Cameras  IP Cameras over fibre  IP Cameras over legacy Co-ax  PoE Injector 3.Connection to.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
TIB cables and optical fibers ______________________________________________________ 13/7/06 CMS-Pisa group.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
DKTCOMEGA EDFA Product Line Jesper Broszka, Product Manager.
Timing calibration using WR P.Kooijman. Fibre network Had a PRR of the network Comments reasonably positive Complicated system Build a full testbench.
1 Nexans Cabling Solutions Easy and reliable migration from fast to faster to100G.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
N 2 Laser 300  QQ 150m HF  HF + 9 PMT Boxes  QP Calib Box 1  4 Counting Room HF Calibration Optical Fiber Path 9 PMT Boxes / Quad 24 PMT Tubes.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
Steve Mobile President WEETECH Inc. Optical Matrix for the W454.
PeterJ Slide 1 Oct 14, 2008 Transfer exact timing using a coded data communication channel.
29 Oct, 2014 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development.
Ethernet Line Extensions Gigabit PoE Unmanaged Switches M12 Unmanaged Switches.
Application Note Fiber Connectivity Riedel solutions for broadcast applications 1 Application Note - Fiber Connectivity.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
1 S. Russo, F. Ameli KM3Net WP3-WP5 Joint Meeting :: Paris :: February 2009 Copper backbone data transmission system: first results.
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
July 31, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Application Examples – (C)WDM Fiber Accessories Riedel solutions for broadcast applications 1 Application Examples – (C)WDM Fiber Accessories.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Test boxes software and first tests V. Kulikovskiy.
P. Jansweijer Nikhef Amsterdam Electronics- Technology Amsterdam July 5-6, 2010KM3NeT: General WPF/L meeting 1 Measuring time offset over a bidirectional.
KM3NeT-Italy Collaboration meeting 28/11/2014 Sistema di trasmissione dati su fibra ottica: Junction Box Sara Pulvirenti.
UPM, DIAC. Open Course. March SPLICES AND CONNECTORS 6.1 Basics 6.2 Splices 6.3 Connectors.
Off & On Shore Electronics overview KM3Net APC Paris 05 / 09 / 2012 Frédéric LOUIS.
White Rabbit and KM3NeT Peter Jansweijer, on behalf of KM3NeT
Status Optical System KM3NeT
DAQ read out system Status Report
WR & KM3NeT Peter Jansweijer
WR Activities in Tsinghua
“FPGA shore station demonstrator for KM3NeT”
Distributed Optical Fibre Radiation and Temperature Sensing at High Energy Accelerators and Experiments Update on installation of DOFRS in PS-Booster.
Concluding remarks E. Migneco
DOM integration meeting
IFMIF/EVEDA – RFQ Legnaro Local Control System M. Giacchini INFN-LNL
Pasquale Migliozzi INFN Napoli
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
STANDARD WR STRAW-MAN ARCHITECTURES FOR PHASE II & WRS RELIABILITY
Data transport architecture over fiber and/or copper
Kostas Manolopoulos Tasos Belias
TDR of PMT: Timing issues
PPM-DOM. SPM DOM LCM SS-part ILxx
S12700 CSS Card Clustering 1 Components and Tools 2 Installing Cards
Fiber Installation for RUN 3&4
MICROSENS GmbH & Co. KG Kueferstr Hamm / Germany
RF and DC Cabling Policy for KAGRA ISC
RF and DC Cabling Policy for KAGRA ISC
Polarization Maintaining Standard Fiber Tap
Products FM Radio Rebroadcast Unit– RFR-2J0 ]
Polarization Maintaining Compact Fiber Tap
MEMS 8x8 Fiber Optical Switch
MEMS 12x12 Fiber Optical Switch
MEMS 48x48 Fiber Optical Switch
Polarization Maintaining Fiber Splitter
Polarization Maintaining Fiber Broadband Splitter
Prepared for CSC by Fred Borcherding FNAL
100W Fiber Collimator PRODUCT BRIEF Advantages Overview
Presentation transcript:

Preparatory Measurement WRS broadcast and WRS L1 synchronisation PPS alignment (Scope) WRS fabric time delay in different L1 ports (6,7,9)

Measured in advance = 24540 ps (consistent with length 500±1 cm) SC (patch A) WRS Broadcast Port 18 WR Calibrator Optical Box DC (patch D) WRS L1 Port 6 Port 7 Port 9 DC (patch C) SC (patch B) SFP KM3NeT WR reference calibrator All fiber patches (A,B,C,D) have equal length and, thus equal time delay Measured in advance = 24540 ps (consistent with length 500±1 cm) The WR Calibrator Optical box has measured time delays SC line = 11221 ps DC line =11251 ps Bidirectional line =

Results of the preparatory Measurement WRL1 PORT 6 and SFP ch21H on Calibrator CLB

Results of the preparatory Measurement WRL1 PORT 7 and SFP ch21H on Calibrator CLB

Results of the preparatory Measurement WRL1 PORT 9 and SFP ch21H on Calibrator CLB Average refers to SFP ch21H only

ARCA Shore Station Optical asymmetry measurement Compliant to requests of TDR v2 till May 2016

Measurement of Shore Station DC Path SC (shore station fiber) Optical Rack WRS Broadcast Port 18 MEOC FC/APC connector SC (patch B + FC/APC to LC fiber 1m) WR Calibrator Optical Box 5 dB DC (patch D) SC (patch A) 5 dB WRS L1 SFP Port 6 Port 7 Port 9 KM3NeT WR reference calibrator Measurement of Shore Station DC Path

Results of the asymmetry (SC path) Measurement WRL1 PORT 7 and SFP ch52C on Calibrator CLB (ARCA-DU001)

Results of the asymmetry (SC path) Measurement WRL1 PORT 6 and SFP ch51C on Calibrator CLB(ARCA-DU002) (Average) difference of only 270 ps among the two ports

Measurement of Shore Station DC Path SC (patch A) Optical Rack WRS Broadcast Port 18 MEOC FC/APC connector SC (shore station) DC (patch B + FC/APC to LC fiber 1m) WR Calibrator Optical Box DC (patch D) 20 dB 5 dB WRS L1 SFP Port 6 Port 7 Port 9 KM3NeT WR reference calibrator Measurement of Shore Station DC Path

Results of the asymmetry (DC path) Measurement WRL1 PORT 7 and SFP ch52C on Calibrator CLB (ARCA-DU001)

Results of the asymmetry (DC path) Measurement WRL1 PORT 6 and SFP ch51C on Calibrator CLB(ARCA-DU002) (Average) difference of 14752.7 ps among the two ports (ARCA DU001 delay is larger)

ARCA Shore Station RTT Cable measurement New request on May 2015 (TDR v3) Measure RTT_cable of DU Test Station and ARCA Shore Station indirect way to recover RTT_Cable

SFP SC (shore station fiber) Optical Rack WRS Broadcast Port 18 MEOC FC/APC connector SC (shore station fiber) patch B + FC/APC to LC fiber 1m (SC and DC) WR Calibrator Optical Box patch D(DC) patch A (SC) WRS L1 SFP Port 6 Port 7 Port 9 KM3NeT WR reference calibrator

Results of the Shore Station RTT Cable Measurement WRL1 PORT 7 and SFP ch52C on Calibrator CLB(ARCA-DU002)