Multipurpose Cultural Center

Slides:



Advertisements
Similar presentations
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Advertisements

Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Campus signage – Internal
SCHEMATIC DESIGN PRESENTATION
Blue Prints.
Feasibility Study Schemes: · Scheme 1—Renovating and expanding the meetinghouse. This scheme moves the meetinghouse about 20 ft. west, converts it to.
MOOSE JAW, SASKATCHEWAN
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
An-Najah National University Engineering college Building Engineering Department Health Center Prepared by: Sobhi Ibrahim Islam Ammar Mohammad Odeh Supervisor:
بســـــــــــم الله الرحمن الرحيم Graduation Project 2 Presentation New Design of a Multipurpose Building Prepared By : Amjad Zidan Osama Rashad Ashraf.
Balboa Park Pool SAN FRANCISCO ARTS COMMISSION CIVIC DESIGN REVIEW – CONCEPTUAL DESIGN April 11, 2014.
Building Plans.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
7 Mini Mall Design. Connection Quick View Architectural view.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
By : Bara Thaher Mohammad Sameer Osama Joma’a Supervisor : Dr Sameh Mona Climate Responsive Design For Administrative Building In different climate zones.
General Information Location –Only a 5-minute walk to the beach –Located at the heart of the culture and recreation center of Tel Aviv –Designed according.
Velocity and Displacement Page 91. Velocity The rate of change of the position of an object. Tells us how fast an object is going AND in what direction.
BUILDING ANALYSIS Established in PG5 is a diverse building, consisting of the following:  Parking garage  Classrooms  food court (seats 300) 
North Augusta High School Design Development Presentation.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
DETERMINE A LOCATION ON THE GROUND BY TERRAIN ASSOCIATION
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Special Mention: Copley International Conference Center Upper Level Southeast: Inaccessible Element.
ICEE Internship International Center for Engineering Education Project: Virtual Reality Environment of a Building Construction Timeline By: Marc Brana.
}السلام عليكم ورحمة الله وبركاته{
An-Najah National University Faculty Of Engineering
Prepared By: Dana Heigeh Isra’ Atallah Manar Raddad
Mechanisms. Mechanisms Outline: Architecture design Environmental design Structural design Electrical design Mechanical design Quantity surveying.
Design of an integrated 5-Star Hotel
Integrated Design Of Beauty Center & Wedding Hall
Coverage of Hikmat-Almasri Stadium
LOCATION MAP PROPOSED 7-STOREY SCHOOL BUILDING MURCIA TOWN PROPER
Prepared by : Reham Asaa’d Supervisor : Arch. Moa’yad Salhab
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
An-Najah Sport Center An-Najah National University
“Nablus Municipality”
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
Chamber of Commerce & Industry
Redesign Of Integrated Car showroom
Redesigning of a Primary school
An-Najah National University Building Engineering Department Graduation Project 2: Design Orthopedic Specialist Hospital Prepared By: Mohannad Iyad Al-Shak’a.
Integrated design Of Fuel Station
Restaurant Design Graduation Project “2” Prepared by: Isra’ Hasan Ali
Graduation Project 2 Redesigning a Villa
Stock Exchange building design
ARCH-4372/6372 Integrated Project: Environmental Controls Overview
AN-NAJAH NATIONAL UNIVERSITY BUILDING ENGINEERING DEPARTMENT
Prepared By : Supervisor : Eng. Abdulhakeem Al- Jawhari Hareth Jepara
Thatch House (Plan) Fig.4.
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
The sport hall.
Multi-storeyed Car Parking-cum- Commercial Complex at Nehru Place, New Delhi PROJECT DETAILS : This multistoreyed car parking and centrally airconditioned.
AN-NAJAH NATIONAL UNIVERSITY BUILDING ENGINEERING DEPARTMENT
ARCH-4372/6372 Integrated Project: Environmental Controls Overview
University Center 517 University Center North: Inaccessible Element
An Najah National University
Mathematics Unit 45: Twisted Building
North Augusta High School – Phase 2A and 2B
Student Center A South: Inaccessible Element
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Presentation transcript:

Multipurpose Cultural Center Prepared By: Hadeel makhlouf Lama Foqha Malak Salahat Shahd Hindi Supervisor Dr. Monther Dwekat

Outline Site location Architectural Design Environmental Design Structural Design Mechanical Design Safety Design Electrical Design BOQ

3262 m2 3738 m2 Total = 7000m2

Circulation and entrances Outline Site location Site plan Architectural Design Circulation and entrances Environmental Design Parking Structural Design Plans Mechanical Design Elevations Safety Design Electrical Design BOQ

Site plan

Circulation and Entrances

Parking Area =2775 m2 60 No. car parking

Circulation and entrances Outline Site location Site plan Architectural Design Circulation and entrances Environmental Design Parking Structural Design Plans Mechanical Design Elevations Safety Design Electrical Design BOQ

Conceptual plan final Design

Total Area = m2 Ground Floor

Total Area = m2 First Floor

Total Area = m2 Second Floor

East Elevation

North Elevation

South Elevation

West Elevation

Thermal analysis and materials Outline Site location Best orientation Architectural Design Shading Design Environmental Design Daylight factor Structural Design Mechanical Design Thermal analysis and materials Safety Design Acoustical design Electrical Design BOQ