Terry Priestley August 2017

Slides:



Advertisements
Similar presentations
Outlook 2 Everything feels good now as prices are high. However...
Advertisements

OPERATING EFFECTIVELY AT WESD. What is Internal Control? A process designed to provide reasonable assurance the organizations objectives are achieved.
Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
Integrated Facility Management (IFM) For NSLS-II October 6, 2010 Chris Johnson Facility Complex Manager Facilities and Operations.
Slide 1 HEADQUARTERS: 1108 Ohio River Boulevard, Suite 805 Sewickley, PA , USA (412) Chicago Office: 2135 CityGate Lane, Suite 300 Naperville,
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D Slide 1 Nuclear Stockpile Stewardship and.
Orientation Objectives Fundamentals of Laser Operation –film: laser classification system Overview of ANSI Standard for the Safe Use of Lasers Biological.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
Participant Challenge Pilot Program Participant Stage One Assess, Learn and Develop.
June 1, 2004Computer Security: Art and Science © Matt Bishop Slide #18-1 Chapter 18: Introduction to Assurance Overview Why assurance? Trust and.
Supply Chain Development A step-change in Supply Chain performance 08/08/2015 OFFICIAL 1 Supply Chain Focus Group – 17 th September 2014 Vic Carlill.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
1 The Standards Based Management System Approach to Deploying the Environmental Management System at Oak Ridge National Laboratory Dr. Fay Frederick, Division.
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
TVA’s Integrated Project Delivery for Nuclear Projects
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Lockheed Martin Missiles and Fire Control
1 Global MSD INITIATIVES Global Business Process Standardisation SCITe a) S & OP, b) OCI GAME COE Management Information Refinery Management System MSD.
1 presented to National Governors Association Federal Facilities Task Force National Transportation Program: A Policy Perspective J. Kent Hancock, Director.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
Web: tel: +44 (0) IEB Asset Maintenance System.
Ingham Healthy Families. History: Why Healthy Families America? Michigan Home Visiting Initiative Exploration & Planning Tool (Fall 2013)  Ingham County.
Patient Safety Friendly Hospital Intiative Purpose Implementation of a set of patient safety standards in hospitals Implementation of a set of patient.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D Slide 1 Practical Considerations for Analysis.
Operational Demands of ReA3 at NSCL “Adapting to Change” WAO 2012, Stanford University Jon Bonofiglio August, 7 th, 2012.
Diamond Radiator Fabrication & Assessment Update Brendan Pratt Richard Jones University of Connecticut.
A Mission of Restoration
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Software QA Safety Systems at SLAC Enzo Carrone Controls Department – Safety Systems SLAC National Accelerator Laboratory.
ISM at the Savannah River Site
Towards a Better World “… handling risk and relationships – Board and Management Perspectives” Nick Chipman PricewaterhouseCoopers Second Summit on Non.
Slide 1 HEADQUARTERS: 1108 Ohio River Boulevard, Suite 805 Sewickley, PA , USA (412) Chicago Office: 2135 CityGate Lane, Suite 300 Naperville,
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
1 War-Winning Capabilities … On Time, On Cost Air Force Materiel Command AFA Technology Symposium: Flight Test Center Breakout Session AAC/CC Perspective.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D Slide 1 Tested by Fire – How two recent.
Redmond Police Functional Plan Update Council Study Session January 14, 2014.
Greater Portland Construction Partnership Panel Discussion on Safety in Design May 30, 2007 CH2M HILL E&AT (IDC) Terry Wheeler.
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
Fermilab Environmental Management System (EMS) Senior Management Training Module FN000378/CR/01.
Content Basics and fundamentals GSR Part 2
Building Business Transformation Capabilities Our perspective on the building blocks, structure and critical success factors to impact change Gillian.
Planning for Succession
Breakout Session Summary Mining Industry
Occupational Radiation Protection during High Exposure Operations
GS-R-3 vs. ISO 9001:2008 Requirements - 4
ISO 14001: 2004 Environmental Management Review Presentation
and Security Management: ISO 28000
PSS Plans for Improved Reliability and Availability
NEI Configuration Control Benchmark – Palo Verde
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
Building for Today + the Future:
Chapter 18: Introduction to Assurance
Environmental Health and Safety (EH&S) Supplier Awareness Training
Docks & Harbors Staff Strategic Planning Overview
Breakout Session Summary Mining Industry
Culture and Leadership in STPs
Safety and Security- From Assessment to Implementation
Leadership and Management for Safety
E. Daly / K. Jordan / C. Hovater / T. Hiatt 03-AUG-2017
W. T. Weng Brookhaven National Laboratory
Regulatory Oversight of HOF in Finland
Goals of GAMAD Tool for: Minimize Maintenance costs
SLAC Radiation Safety Work Control Form Process:
DOE Review of the LCLS Project October 2006
I4.0 in Action The importance of people and culture in the Industry 4.0 transformation journey Industry 4.0 Industry 3.0 Industry 2.0 Industry 1.0 Cyber.
Presentation transcript:

Terry Priestley August 2017 Disciplined Operations at LANL’s Dual Axis Radiographic Hydrodynamic Test (DARHT) Facility Terry Priestley August 2017

DARHT consists of 2 linear induction accelerators oriented at right angles to each other. Each electron beam is focused onto a heavy metal target that converts the beam’s kinetic energy into x-rays. Multiple x-ray pulses produce multiple view radiographic images of a full-scale non-nuclear weapon mockup as it implodes.

Hazards, Risks and Concerns High Voltages Ionizing Radiation Lasers High Explosives Weather Physical Security Cyber Security Data Management Accelerators Experimental Standard Industrial Hazards Remote Location Security Clearances Visiting Experimentalists Physicists One Opportunity for Data Collection 18-24 months ~$5,000,000

Disciplined Operations Leadership

People Staffing levels Defined roles, responsibilities, authorities and accountability Formal Qualification Program Continuing training Strong safety culture Succession planning Opportunities for growth Cross-organizational relationships

Processes Effective Compliant Formal and informal processes Graded to match risks and resources Built-in flexibility, as appropriate Effective change control process Integrated schedule Data-driven issues management

Equipment Configuration Management Formal Maintenance Management Program Predictive Preventive Corrective Obsolescence Effective and prioritized modifications and upgrades Critical spare parts

Results High-Quality Data Safe Working Environment Predictable Operations Time for Fundamental Research and Development Customer Confidence