Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Refurbished Booster RF John Reid October 24, 2012.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Report Technical Director Storage-Ring-Installation Completed
Crab Cavity Technical Coordination meeting:
Status of the M-ECCTD F. Peauger - P. Bosland
CC LLRF SM18 test plan and BA6 infrastructure
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
S1G Experiment Schedule Plan
Detector status and commissioning: LUCID
CERN – Zanon discussions
He Plant, LN2 Systems and Commissioing
Crab cavities Cryogenics progress for the SPS
Installation Global System
High Energy Proton Synchrotrons
ELENA installation and commissioning status
BA6 – crab cavity activities in EYETS
LHC-RF activities in LHC PT 4 TS2 YETS LS2
LIU Wire Scanner Milestones June 2017
Installation of an Instrument on a CERN machine
Complementary ISTC Projects #3888, 3889p
K. Foraz on behalf of OSS members
AD consolidation activities in LS2
SPS cryogenic proximity equipment and SM18 validation
Electron cloud & vacuum pressure observations: 2011 proton run
Accelerator and Experiment Interface Session: LS2, LS3
352MHz Klystron Control for the 3MeV Linac test stand
XFEL Vacuum System Commissioning
Status of the cryogenic system for B180
World Wide Fundamental Power Coupler meeting #3
K. Foraz on behalf of OSS members
ACS news Circulator TCU: control tests in progress All cavity racks
IHEP Cryomodule Status
LHC installation status
Prototype cryomodule development
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
STATUS REPORT OF THE SPARC HIGH POWER RF SYSTEM Nov. 16, 2005 R
Hardware Commissioning
Presentation transcript:

on behalf of the RF group LSS Review - RF O. Brunner on behalf of the RF group

Summary UX45 – RUX45 Installation Status & Worries  Interactions with LSS installation ACS, ADT & APW Equipment Preparation Status Conclusions

3 RF systems in LSS4: ACS - ADT - APW APWL – RF APWT - BI APW APWL – RF APWT - BI ADT ADT

UX45 – RUX45 Installation Main activities: Water cooling Civil Engineering Cabling Wave guide installation Ventilation  Might affect the LSS installation if planning not respected By e.g.: UX45-RUX45 cabling=> WG installation => SC modules installation

Main worries – 1 (Civil Engineering) Shielding wall in UX45 Two passages used for QRL installation in the junction regions now being closed Solution approved by SC/RP: Solid bricks Problem: Non conform “bricks” used instead “Solution” proposed by TS/CE: additional layer of bricks Wall to be rebuilt? Waiting for SC/RP approval Main worries: Might affect LSS installation planning Wall => Cabling => WG => SC modules Personal protection during cavity commissioning Equipment protection (cavity control system will be installed along the wall)

Main worries – 2 RUX45 Roof Roof needs to be partially closed (on each side) prior to SC modules installation: Roof  RUX45 air cooling units Cryogenic distribution lines to SC modules  (WG)  SC modules In order to follow up the LSS installation planning (H. Gaillard): Roof parts must be ready by beginning of May Roof installation: mid-May Ventilation: 8 wks (?) Cryogenic lines installation 4 wks SC Modules installation mid-July

ACS System Equipment Equipment/Status: 100kV/40A LEP Power Converters: 3/4 already checked by AB/PO 4 HV bunkers (UX45) + equipment (modulators, crowbars, ..): equipment in preparation. Ready for installation this summer 16 high RF power stations (UX45): pre-installation in progress at CERN wave guide system: 60% already mounted. Waiting for end of cabling campaign 4 SC modules (4 cavities each) + 1 spare module: now being tested and prepared in SM18 will be ready for installation mid-July (as planned) despite all tuning system problems UX45

ADT System Equipment (CERN – JINR collaboration) Equipment/Status: All 20 vacuum tanks and supports delivered to CERN 19 tanks & all electrodes cleaned and leak tested 18 kickers assembled (bake out finished by mid-April) Ready for installation as planned (16 kickers needed by mid-July)

APWL – pick ups Equipment/Status: Prototype built & tested One pick up installed in SPS (reference) 6 LHC pick ups now being built: Ready by mid-April Calibration done by mid-May Bake out finished by mid-June Ready for installation: end of June APWT? Built by BI. Late delivery might affect vacuum activities (bake out in particular)

Bakeout in LSS4 Bakeout essential ! SC cavities Electronics: Absorbtion on cold surface from neighbouring sectors (cryo-pumping) => Increased dynamic losses, multipactoring => Difficult reconditioning after warm-up In test stands we need 10E-7/ 10E-8 to operate, limited volume (cavity & cut off tubes) Need better in machine due to larger volume (10E-9..?) Electronics: Single event upsets SEUs from beam gas collisions are a concern Effect proportional to vacuum: => With 10E-8 mbar we would have between 10 and 100 SEUs per year in all LLRF systems in UX45 (Rough estimate) Bakeout essential !

Conclusions UX45 & RUX45 Installation RF Systems: Still many interdependent co-activities RF Systems: ACS modules should be ready on time despite many tuning problems discovered recently ADT kickers: will be ready on time for installation APW pick ups: will be ready on time for installation APWT? If late will affect vacuum activities (bake out)