MKD Waveform Measurements

Slides:



Advertisements
Similar presentations
Beam direction and flux measured by MUMON K. Matsuoka (Kyoto) for the MUMON group Contents: 1.Beam stability (direction/flux) 2.Absolute  beam flux.
Advertisements

LHC Collimation Working Group – 19 December 2011 Modeling and Simulation of Beam Losses during Collimator Alignment (Preliminary Work) G. Valentino With.
LHC 18 & 19 April 2015 At 450 GeV with bumps, no increased MUFO activity. Beam screen 15R8 warming up to 80 K, ongoing for the day 09:00: Orbit studies.
SECTOR TEST PREPARATION W. Bartmann, C. Bracco, J. Uythoven LIBD Meeting, 10-Feb-2015.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
“Pinhole Measurement” Approach to K Measurements using Spontaneous Radiation November 14, 2005 J. Welch, R. Bionta, S. Reiche.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
S. White, LBS 17 May Van Der Meer Scans: Preliminary Observations.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
IPBSM status and plan ATF project meeting M.Oroku.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
COGGING MEETING Cogging Semi-Fine Adjust without collisions? Fine Adjust When? Cogging Meeting – Sophie BARON.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
Update on injection studies of LHC beams from Linac4 V. Forte (BE/ABP-HSC) Acknowledgements: J. Abelleira, C. Bracco, E. Benedetto, S. Hancock, M. Kowalska.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
06/2006I.Larin PrimEx Collaboration meeting  0 analysis.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
SEM SIC SEM SIC 2 SEMs & 2 SICs closed to the Dumps 1 SIC, 1 Faraday cup & 1 SEM SEM SIC F. cup 4 similar set-ups : Girder 6,7,11 and 13 4 th – 8 th October.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
BI MD# BSRT Measurements Beam 1 and 3.5 TeV 2 bunches with different emittances Bumps: -4, -2,0,2,4 mm Results: 3.5TeV.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
(Towards a) Luminosity model for LHC and HL-LHC F. Antoniou, M. Hostettler, Y. Papaphilippou, G. Papotti Acknowledgements: Beam-Beam and Luminosity studies.
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
Aperture measurements during LHC commissioning 2017
Overview Preparatory work at the MML BBA to define the reference orbit
Rainer Stamen, Norman Gee
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Luminosity monitor and LHC operation
LHC Wire Scanner Calibration
1st LHC MD Period Started
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Firmware Update 29/03/2017 Rebecca Ramjiawan.
LHC Beam Dumping System Reliability Run Summary
TOF CALIBRATION DATABASE
MD2036: UFO dynamics studies and UFO fast detection
Jan Uythoven For discussion
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Field quality to achieve the required lifetime goals (single beam)
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Machine availability reaching well over 80%
Introduction to Static Timing Analysis:
LHC Injection and Dump Protection
Status of Phase Feedforward Tests
Limits on damping times
Monday February 28th 8h00: Injection
Beam-Based Alignment Results
Yesterday morning Held 1647 for a while – SPS kicker problem
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Programme for VDM measurements Friday Oct 15
Collimation margins and *
Summary Thursday h21: Stable beams fill #1303.
Feed forward orbit corrections for the CLIC RTML
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
LHC Morning Meeting - G. Arduini
Global Trigger Finds Correct BX
Wednesday 23/2 Thanks CRYO!!!.
Another Immortal Fill….
Daniel, Gianluca and Belen (for the Collimator team)
Monday 152 bunch operation summary
Presentation transcript:

MKD Waveform Measurements C. Wiesner, W. Bartmann, C. Bracco, M. Fraser, C. Hessler, N. Magnin MKD Generator Meeting 23/05/2017 MKD Generator Meeting

Measurement Setup Measurements were performed on 14/05/2017 for both beams. The procedure was: We recorded the horizontal beam position on the BTVSE in dependence of the bucket number. We did not use 'inject and dump', but injected and then used a manual operator dump. 23/05/2017 MKD Generator Meeting

Measurement Setup Before, we had prepared an injection pattern for both beams. It worked quite efficiently. Both waveforms were measured with more than 30 shots for each beam in less than 3 hours (compared to the planned 2 to 5 hours for each beam). New injection pattern for the MKD waveform measurements saved as ’B1B2_bunch_scan_LBDS‘. It can now be reused and modified for future measurements. Before each scan, we checked the reproducibility of the beam position on the screen for three characteristic points on the waveforms (2 to 4 shots for buckets 1, 281, 681). Then we repeated bucket 1 after the end of the measurement. The shot-to-shot stability was remarkable. The position only changed once for one point by 0.2 mm (screen resolution is 0.2 mm/pixel). For all others it remained constant. Since the AG keeper was enabled, no measurements of the rise time were performed. Instead we focused on measuring Overshoot 1. 23/05/2017 MKD Generator Meeting

Measurement Setup No measurement of rising edge possible if AG keeper is active. 23/05/2017 MKD Generator Meeting

Errorbars: +/- 0.1 mm (0.5 pixel size) and +/- 10 ns (LBDS jitter) MKD Waveform – Beam 1 Results Beam 1: In general: MKD waveform measurement fits very well with the measurement done in April 2015 and with the simulations. Shape and position did not change visibly since 2015 (~0.2mm or less). MAD-X model based on the measured MKD waveforms, B(I) calibration factors, time delays (eddy currents & signal delays) and calculated time of flight. Errorbars: +/- 0.1 mm (0.5 pixel size) and +/- 10 ns (LBDS jitter) Offset corrected for simulated data. 23/05/2017 MKD Generator Meeting

MKD Waveform – Beam 1 Zoom on overshoot 1 Δt ≈ 112.5 ns ± 50 ns Results Beam 1: T_DELAY correspond to Bucket -45  Δt ≈ 112.5 ns Assuming worst-case errors of: position +/- 0.1 mm LBDS jitter of +/-10 ns  Δb = 45 ± 20 buckets*  Δt = 112.5 ns ± 50 ns T_DELAY varies with beam energy. The global delay times has to be chosen such that for the earliest case (assuming worst-case errors) Bucket 1 is placed not earlier than T_DELAY (stronger kick = safe side). How much margin is required? * Approximation assuming symmetric error Bucket 1 (2017) Bucket 1 (2015) Δx = 0.71 mm I_REF100PCT Δt ≈ 112.5 ns ± 50 ns T_DELAY 23/05/2017 MKD Generator Meeting

MKD Waveform – Delay Times Earliest case (2-3 TeV): Bucket 1 is placed ~60 ns earlier Preliminary result: Even considering a pessimistic waveform-measurement error and a possible LBDS jitter of 10 ns, Bucket 1 will not be shifted before T_DELAY. 23/05/2017 MKD Generator Meeting

MKD Waveform – Beam 2 Results Beam 2: Simulation shifted by 0.55 mm Results Beam 2: Beam 2: The shape of the measured data fits very well with the simulations. Compared to the measurement done in April 2015, the absolute value on the screen has shifted by ~0.6 mm. BI: No change in BTVSE settings since 2015. Change of beam orbit? Offset corrected for simulated data. 23/05/2017 MKD Generator Meeting

MKD Waveform – Beam 2 Zoom on overshoot 1 Results Beam 2: T_DELAY correspond to Bucket -48  Δt ≈ 117.5 ns Assuming worst-case errors of: position +/- 0.1 mm LBDS jitter of +/-10 ns  Δb = 48 ± 20 buckets*  Δt = 117.5 ns ± 50 ns Applying same logic as for Beam 1:  Even considering a pessimistic waveform-measurement error and an LBDS jitter of 10 ns, Bucket 1 will not be shifted before T_DELAY for the ‘earliest case’ of ~2TeV. Bucket 1 (2017) Δx = 0.75 mm I_REF100PCT Bucket 1 (2015) Δt ≈ 117.5 ns ± 50 ns T_DELAY 23/05/2017 MKD Generator Meeting

Summary -Beam 1: MKD waveform measurement fits very well with the measurement done in April 2015 and with the simulations. Shape and position did not change visibly. - Beam 2: The shape of the measured data fits very well with the simulations. Compared to the measurement done in April 2015, the absolute value on the screen has shifted by ~0.6 mm. -The shot-to-shot stability was remarkably good (close to the screen resolution of 0.2mm/pixel). - The position of Bunch 1 with respect to T_DELAY leaves enough margin for measurements errors, jitters and operation with all required beam energies. 23/05/2017 MKD Generator Meeting

Thank you for your attention!

Energy Scan Example: Estimated values for MKD.AB1*: 450 GeV: Bucket 1 is placed 112.5 ns after T_DELAY (measurement) 800 GeV: Bucket 1 is placed 206 ns after T_DELAY 3 TeV: Bucket 1 is placed 89 ns after T_DELAY 6.5 TeV: Bucket 1 is placed 180 ns after T_DELAY *quick estimate based on ‘Measurements MKD.UA63.IPOC2.AB1/Waveform from 2017-04-06 14:21:00 to 2017-04-06 16:06:00’. To be checked for all MKDs. 23/05/2017 MKD Generator Meeting