CDR preparation V. Mertens IOWG 14.6.2017.

Slides:



Advertisements
Similar presentations
Chapter 11 Designing the User Interface
Advertisements

Configuration Management
1 Grant Process Proposal Preparation Proposal Writing Project Implementation Evaluation and Assessment Reporting.
Chapter 4.
Systems Analysis and Design 9th Edition
Copy Decks 101. Part 1: Understanding the Layout.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Chapter 4.
Desktop Publishing Unit 7. Unit Layout Five Assessment Objectives Unit Completion end of January – Allowing 2-3 Months contingency work.
Writing Effective Self Assessments
Chapter 13: Designing the User Interface
Unit 7 – Desktop Publishing Assessment Objective Two.
LHeC Workshop Chavanne-de-Bogis, 20/21 January 2014 Herwig Schopper.
Understanding the Layout
1 © 2005 course technology University Of Palestine Chapter 6 Storyboarding the User’s Experience.
Information for Meeting in Sweden. FEEDBACK FROM UK NATIONAL AGENCY.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
© 2005 course technology1 1 1 University Of Palestine UML for The IT Business Analyst A practical guide to Object Oriented Requirement Gathering Hoard.
Requirements Specification for Lab3 COP4331 and EEL4884 OO Processes for Software Development © Dr. David A. Workman School of Computer Science University.
Understand the Present to Master the Future Johannes Gutleber Future Circular Collider.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
Program Editor Macros – for PC SAS. Objectives What are program editor macros? SAS code that is saved and available any time you open SAS When to use.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Input requirements for WP7 Andreas Pertl Gudrun Obersteiner Silvia Scherhaufer Peter Beigl 3 rd General Meeting 5 rd - 8 th July 2010 Southampton.
Introdcution to Workpackage/Activity Reflection D. Schulte.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
IHE ITI XDStar Volume 3, Section 4 Redocumentation Debrief Gila Pyke Lead Facilitator/Cognaissance.
Course Title Course subtitle. 2 Color Scheme 93b5d f7f7f 147 | 181 | | 127 | b52 0 | 91 | 82 99ccff 153 | 204| |33|
1.Conduct a close read using Letter from Christopher Columbus to the Treasurer of the King and Queen of Spain. 2.Use the Sum it Up sheet
Amelia Smith Anne Heavey Document Managers Jan. 28, 2010.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
PSYCH 555 Week 2 Individual The Self Paper Check this A+ tutorial guideline at 555/PSYCH-555-Week-2-Individual-The-Self-
PG-26765: Culture and People
Meeting Housekeeping/Highlights
LHeC Coordination Meeting, 9 June 2017
Formal Case Study Analysis Format
XCON WG IETF-64 Meeting XCON Framework Overview & Issues
1st FCC Infrastructure & Operation meeting
Acknowledgements to all FCC study teams
Input to Strategy currently planned
FCC summary report March 2015 Washington.
Future Circular Collider
Top and WW final states Harry Weerts For LC working group
Translating Visual Information into Tactile Information
Preparation of FCC Week 2018 (programme, attendance)
Overview of CLAS12 Calibration
Future Collider Projects at CERN
API Documentation Guidelines
Chapter 3: The Project Management Process Groups: A Case Study
Employee Performance Management System
Title of Paper or Topic you are Teaching
Pilot phase - Learnings
HOW TO MAKE A POSTER FOR THE 12TH EUROPEAN CONGRESS ON THERMOLOGY
Training Seminar: “The OIE PVS Tool”
Review plan of the nature reporting – update 6
FIVE PROJECT PHASES.
FCC study – Fire collaboration WP4 Status & Update
Only 1 slide per poster is permitted
FCC Week 2019 Civil Engineering Summary
Real World PM Interactive Exercise
HL-LHC Quality management
Presentation transcript:

CDR preparation V. Mertens IOWG 14.6.2017

From M. Benedikt‘s presentation at FCC Week 2017 CDR planning From M. Benedikt‘s presentation at FCC Week 2017

CDR structure (volumes) Physics opportunities across all scenarios 2 Hadron Collider Summary 3 – Hadron Collider Comprehensive Physics opportunities across all scenarios Accelerator Injectors Technologies Infrastructure Operation Experiment eh 4 Lepton Collider Summary 5 – Lepton Collider Comprehensive Accelerator Injectors Technologies Infrastructure Operation Experiment 6 High Energy LHC Summary 7 – High Energy LHC Comprehensive Accelerator Injectors Infrastructure Refs to FCC-hh, HL-LHC, LHeC Documents the performed studies Material to support the baseline concepts A basis for the next phase Highlights remaining work Lists alternatives Concise description of main concepts and key points

CDR related questions Tools: Basic typesetting will be done in LaTex; templates and guidelines will be provided. CDR production will use „Overleaf“, a cloud-based collaborative editor with real-time feedback. To clarify: How to handle text parts largely identical to FCC-hh and FCC-ee (appear only in one place and get referenced in the other; fetched from central repository; separate copies of same text, ...) ? Must all items from the WBS be addressed (to different levels of detail) or not ? Use in CDR the same breakdown to levels and the same item numbering as in WBS ? Which illustrations are needed ? To which level of detail shall models be developed (e.g. detector or service caverns) ? Who shall be in charge of all these drawings (individual WPs) ? Where to store all these drawings (CDD/EDMS, also somewhere else for „Overleaf/LaTex“) ? Any standards to respect (format, fonts, font size, colour scheme, ...) ? Still useful to write separate explanatory notes if anyway soon all to be explained in CDR ?