THEMIS THEMIS SRR July 8-9, 2003 University of California, Berkeley

Slides:



Advertisements
Similar presentations
2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl.
Advertisements

THEMIS & RHESSI NRC Irvine 2/01/2005 RHESSI and THEMIS PI Mode Experience Feb
Michael Lampton Overview of Space Sciences Laboratory 16 July 2003.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS/Science Briefing 1 NASA/HQ, 03/12/2003 T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS (THEMIS) RESOLVING THE PHYSICS.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
National Aeronautics and Space Administration Goddard Space Flight Center MISSION READINESS REVIEW THEMIS Cynthia M. O’Carroll GSFC Public Affairs Office.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
THEMIS/MIWG#3 1 SSL, 06/15/2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND.
Using Student Space Assets For Atmospheric Science Research NSF Workshop for Small Satellite Missions For Space Weather and Atmospheric Research George.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
THEMIS SRR MO-1UCB, July 8-9, 2003 THEMIS Mission Overview Peter R. Harvey Project Manager Space Sciences Laboratory University of California, Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
THEMIS Project Management 1 UCB, June 14-16, 2004 THEMIS Mission CDR Project Management Peter R. Harvey University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS MCRR GSFC 2/4/2004 THEMIS Mission Confirmation Readiness Feb
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
THEMIS MPDR / CAROR-1UCB, November 12-14, 2003 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF.
ITAR Restricted Data 1THEMIS Mission CDR 6/18/04 System Safety Overview WBS Element Tim Keepers (301)
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
THEMIS Orbits and Data at SPDF Dieter Bilitza 1, Robert McGuire 2, Robert Candey 2, Reine Chimiak 3, Bernard Harris 3, David.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: Time History of Events.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
HQ Lunch Science Seminar Series 1 NASA/HQ, 1/28/2008 Introduction, THEMIS overview First THEMIS results from the tail First THEMIS results in the dayside.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
Lessons Learned Project Overview 1 Jan 29, 2008 THEMIS Introduction Jan 29, 2008.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
Joint Cluster-THEMIS SWT 1 Sep 23-26, 2008 Vassilis Angelopoulos, James P. McFadden, Davin Larson, Charles W. Carlson, Stephen B. Mende, Harald Frey, Tai.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 THEMIS Confirmation Assessment Project Overview Peter R. Harvey University of California - Berkeley.
Engineering and Science Directorate Organization Structure June 2016.
Kentucky Space Enterprise Missions
Mission Critical Design Review (MCDR) June 14-18, 2004
THEMIS THEMIS MPDR Nov 12-14, 2003 University of California, Berkeley
THEMIS THEMIS MCDR June 14-18, 2004 University of California, Berkeley
THEMIS The THEMIS mission approach to addressing the substorm question
FIELDS Mission Assurance Manager University of California, Berkeley
INSTRUMENT DATA PROCESSING UNIT (IDPU)
THEMIS Mission Assurance
University of California - Berkeley
Project Overview and Status
Kentucky Space Facilities for satellite development, testing and operation Twyman Clements1, David Jones1 ,Jason Bratcher1, Jessamyn Delgado2, Daniel Erb1,
THEMIS Mission Confirmation Readiness
THEMIS program: an Overview
Significant results from 2 years of operations
GSFC SDO Project Barbara Thompson Elizabeth Citrin Project Scientist
EagleSat 2 – Mission and Development Overview
Integration and Test Organization Chart
Response to Comment on “Tail Reconnection Triggering Substorm Onset”
THEMIS Introduction Nov 6, 2007.
Presentation transcript:

THEMIS THEMIS SRR July 8-9, 2003 University of California, Berkeley TIME HISTORY OF EVENTS AND MACROSCALE INTERACTIONS DURING SUBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START THEMIS SRR July 8-9, 2003 University of California, Berkeley

Coffee, food, and posters at Silver Addition Main Entrance (outside) Opening Remarks SRR Presentations Coffee, food, and posters at Silver Addition Main Entrance (outside) Splinter room in Addition Library Local arrangements, see Amy Shutkin Other issues, see: Vassilis Angelopoulos or Peter Harvey Silver Addition Splinter room Samuel Silver Space Sciences Laboratory

SPACE SCIENCES LABORATORY Background Initiated in 1958 by Drs. Teller and Seaborg Multidisciplinary organization Connecting campus research to space efforts Facility opened in 1966 New facilities added in 1998 Research Efforts Involving Balloons Sounding rockets Satellite instruments & science complements Complete satellites Mission & Science Operations Ground Station Operations Agencies Involved NASA, NSF, NSBF, USAF, DOE ESA, ISAS, IKI, PSI, etc. $35M/yr (85% NASA, 15% NSF, 5% misc.)

Facilities 55000 sq. ft. Office and Laboratory Space Employing 420 Scientists, Engineers, Staff On-Site Machine Shop Clean Room Facilities to Class 100 Thermal Vacuum Facilities up to 3m diameter Spacecraft Integration Facility 4-story High Bay Radiation Sources Laboratory Mission Operations Centers Science Operations Centers 11 Meter S-Band Satellite Antenna Secure High Speed Communications to NASA

THEMIS is an Essential Component to Swales Corporate Growth THEMIS is Central to Swales Strategic Plan Swales has committed significant internal resources over the last 4 years to mature the THEMIS Mission design thereby enhancing the science return Swales has the Human & Financial strength to drive THEMIS to a success THEMIS Management has high visibility with weekly direct- reporting to CEO/COO We love doing this type of work! 1978 1980 1985 1990 1995 2000 2001 First direct contract with JPL First direct contracts with GSFC & NRL SAI Founded Delivered first Flight HW Delivered ISS Radiator First major contracts with LaRC Delivered FUSE OTA Successful Launch of EO-1 Acquired Thermal and Structural Products Divisions Doing Business As Awarded SMEX-Lite Commercialization First major STS Payload Contract NRL Instrument Development (LASCO / SSULI) 61% 21% 14% 4% Engineer Designer / Other Professionals Technician Support / Clerical Labor Mix

Opening Remarks THEMIS Team Attendees Ron Jackson UCB Msn Assurance Tai Phan UCB Conjunctions Forrest Mozer UCB EFI Jim McFadden UCB ESA Davin Larson UCB SST Harald Frey UCB GBO/ASIs Joe Means UCLA GMAGs; Mag.Clean. Bob Ergun CUBoulder EFI/DFB Jim Westfall CUBoulder EFI/DFB Dave Sibeck GSFC MP/Orbits Sam Placanica GSFC GN&C advisor (RCS) Mark Beckman GSFC GN&C advisor (ACS) Uli Auster TUBS FGM Christophe Coillot CETP SCM William Liu CSA GBO/Canada Kate Harps UCB Financial Mgmt Linda Lupco UCB IDPU Digital Dorothy Gordon UCB IDPU DCB Peter Berg UCB Power Mike Cully Swales Bus Mngr Dan Mark Swales PhA Mngr, IAC Dave Jeyasunder Swales PhA Electrical Nahide Craig UCB EPO THEMIS Team Attendees Vassilis Angelopoulos UCB PI Peter Harvey UCB PM Ellen Taylor UCB MSE Tom Ajluni Swales Bus Sys Engr John Bonnell UCB Orbits, EFI David Curtis UCB ESA Bob Lin UCB SST Werner Magnes IWF FGM Bertran de la Porte CETP SCM David Pankow UCB Mechanisms Hari Dharan UCB Mag Booms Greg Delory UCB Instrument DPU Manfred Bester UCB Mission Ops Mgr Tim Quinn UCB Science Ops Mgr Stephen Mende UCB GBO/ASIs Eric Donovan UCalgary GBO/dply C. Lashley Swales P&PC Mechanical R. Zara Swales Thermal R. Leboeuf Swales ACS M. McCullough Swales RCS R. Kraeuter Swales EPS S. Hammers Hammers Flight Software

Opening Remarks Review Board Mark Goans GSFC/Systems Review Office/Co-chair Brian Keegan Honeywell/Co-chair   Joe Bolek GSFC/Systems Engineering Lou Fantano GSFC/Thermal Systems Scott Glubke GSFC/Propulsion Systems Rick Schnurr GSFC/Electrical Systems Jason Hair GSFC/Mechanical systems Terry Ford Independent/Guidance, Navigation and Control J. B. Joyce Independent/Mission Operations Ronnie Killough Southwest Research Institute/Software Frank Martin Martin Consulting, Inc./Science William Taylor Independent/Project Management Kevin Morgan IV&V