Draft SuperB Organization Chart for TDR Phase

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

An Advanced Linear Accelerator Facility for Microelectronic Dose Rate Studies P.E. Sokol and S.Y.Lee Indiana University.
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
28 Nov,2008Marcello A.Giorgi1 1 1 The SuperB Project (Super Flavor Factory) Marcello A. Giorgi Università di Pisa & INFN Pisa November 28,2008 Plenary.
AS Diagnostic Collaboration Mark Boland
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Beam Physics Work D.S List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Organization Chart of Department of Public Works and Town & Country Planning (DPT) Director - General Internal Audit Unit Deputy Director - General Office.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
B Factory D&D Review: March 23, 2009 Page 1 Overview of re-use requests and related issues D. MacFarlane Deputy Director, PPA.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 May 10, 2007 Detector group organization For the CDR writing we had identified subsystem editors/conveners  This structure has concluded its function.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
SuperB project. The origin: infn roadmap 2006 early motivations – e+ e- after Dafne at LNF – SuperB’s synergy with ILC damping rings.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
Detector Goals and General Syst. System Parallel Joint Parallel DGWG Mechanical Integ. TDR Organization System Summaries WORKSHOP Structure-Detector +
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Conventional Facilities and Siting Global Group (ARCFS)
LCC L. Evans, Santander, 2nd June 2016
KEK news ( ) S.Tanaka.
CERN meeting report, and more … D. Breton
Meeting closeout Guy Wormser LAL Orsay Orsay February 18,2009
J. Alexander + Cornell accelerator group Cornell University
ETD/Online Report D. Breton, U. Marconi, S. Luitz
SuperB Injection, RF stations, Vibration and Operations
M.Jonker CTC MPO-WG status
SuperB story The INFN roadmap 2006 included a flavour factory in a general framework of development of the Frascati National Labs area From the beginning.
EU Institution Board 1 representative of each participating institute
Integration and IR Hall
Marcello A. Giorgi Università di Pisa & INFN Pisa
Electron Source Configuration
ورود اطلاعات بصورت غيربرخط
INFN and the ILC S. Bertolucci, INFN.
Accelerator R&D Results from the B-factory
Summary of Washington DOE Review
Project Management Issues John N. Galayda, SLAC April 24, 2002
SuperB Accelerator Overview
Agenda modifications.
Transfer Line for EIC.
Presentation transcript:

Draft SuperB Organization Chart for TDR Phase SuperB Project Office - TDR Phase Director Deputy Director 1 Deputy Director 2 Deputy Director 3 Administrative and scientific staff Oversight Board International Board of Representatives Mini-MAC Mini-DET Mini-COMP Computing Accelerator Consortium Detector Collaboration Local Infrastructure Accelerator R&D, Engineering and Construction Accelerator Technical Board Detector R&D, Engineering and Construction Detector Technical Board Tunnel, power, water, utilities, ……… Site computing system, offline Infrastructure,Facilities, Services R&D + Preparatory Studies Linac Magnets Mech. Design IR/Final Focus Vacuum Transfer Lines Alignment Diagnostics Polarization Parameters Optics Beam Dynamics RF/Feedback Fluid Supplies Damping Rings Control System Power Supplies Rad. Protection SVT DCH PID EMC IFR Magnet Offline Computing Online Computing Electronics Trigger DAQ Rad. Monitor Lum. Monitor Computing Model MDI 10/03/2008