OVAL and the SACM Information Model

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Strategies for developing and using Assessment Planning Templates.
Computer Science 2014 Internal Assessment The Solution.
What is a Feasibility Study (FS) and an Alternative Evaluation Report (AER)? ENVIRONMENTAL UPDATE MEETING NOVEMBER 20, 2014 HEATHER MCCOLEMAN OES MAJOR.
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
1 STATE OF THE ART MANUALS IN DEVELOPMENT VOC Storage Tanks Asphalt Manufacturing Facilities Landfills Reason for drafting manuals –Prior VOC Storage tanks.
Characteristics of on-line formation courses. Criteria for their pedagogical evaluation Catalina Martínez Mediano, Department of Research Methods and Diagnosis.
SACM Information Model. Current Status First WG draft posted 10/24 Many open issues remain Several comments / suggestions sent to WG for review Today.
Shawnee Mission School District Media Library A Project Proposal By: Anita Able, Christian Madrigal, Jennifer Nicolotti, and Cynthia Sickendick.
Best Practice for Workplace Travel Planning for New Development TRAVL Conference 28th February 2007 David Knight Director.
VOCAB WORD Textbook Definition TOPIC Definition in your own words Source.
THE REVIEW PROCESS –HOW TO EFFECTIVELY REVISE A PAPER David Smallbone Professor of Entrepreneurship and Small Business, SBRC, Kingston University Associate.
Management Task Force W3C Face To Face 03/04/03. Deliverables Proposed from January F2F Deliver –Proposal for base manageability requirements (All) Web.
Forwarding and Control Element Separation (ForCES) wg Meeting Patrick Droz David Putzolu.
July 28, 2010IETF 78 – Maastricht, Netherlands1 IP Multicast Performance Monitoring: update on IPPM experience Vero Zheng Alberto Tempia Bonda.
PS -0 System Architecture Working Group RASDS Status 14 June 2006 Peter Shames NASA / JPL
An adoption phase for RDA WGs?. Background WGs end after 18 months WGs (and some IGs) produce outputs, but adoption of these outputs often only takes.
Progress Report Cardiovascular WG September 2015 Dr Rodney Franklin – Co -Chair.
Doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
My level of thinking and learning is… TASK: Prestructural I’m not sure about … Unistructural I have one relevant idea about … Multistructural I have several.
Asset Summary Reporting draft-davidson-sacm-asr-00 David Waltermire
GGF - © Birds of a Feather - Policy Architecture Working Group.
Guidelines for RTF Measure Costs and Benefits Guidelines (formerly Cost and Non-Energy Benefits Guidelines) Proposal of Guidelines to the Regional Technical.
David By michelangelo. Statue.
“Redefined Roles of Applied Dissertation Chairs & Members”
TG 1 March Session Closing Report
Evaluation of Tenure-Accruing Faculty
(Flow Related) DLEP Extensions
Introduction to OVAL to SACM Info Model Paper
Nancy Cam-Winget June 2015 SACM Requirements Nancy Cam-Winget June 2015.
IEEE aj Process Overview
SPE 537 Enthusiastic Studysnaptutorial.com
معلم الصف الثالث الابتدائي
Guidance report: Methodology for the assessment of ecological coherence of MPA’s Henk Wolters 30 October 2014.
Port State Control Questionnaire
<month year> doc.: IEEE <030158r0> March 2004
Registration Process for new messages
ديبــــاجــــــة: صادق الكنيست الإسرائيلي في تاريخ على اقتراح قانون دائرة أراضي إسرائيل (تعديل رقم7) – 2009 الذي يشكّل، عمليًا، خطة إصلاح شاملة.
Vocabulary Review Topic.
SUPA Policy-based Management Framework (SUPA: Simplified Use of Policy Abstractions) draft-ietf-supa-policy-based-management-framework-01 Will Liu, John.
WG Technical Editor’s Report
Submission Title: [R2SG Monday Meeting] Date Submitted: [18Sept00]
ФОНД “СОЦИАЛНО ПОДПОМАГАНЕ”
IEEE aj Process Overview
Classified IT EvalS Flow Chart
Welcome to the Exceptional Needs Panel Conference 2018
February 19 Nov 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SG4d Closing Report for Dallas.
IEEE IETF Liaison Report
MCO Status Report to JSTC
IEEE aj Process Overview
“INNOVATIVE WAYS OF INCLUDING LOW QUALIFIED EX OFFENDERS TO LABOUR MARKET” LT01-KA Ana Jurado Berja Ginso Asociación Para Gestión de la.
Marine Strategy Framework Directive Common Implementation Strategy 18th Meeting of the Working Group on Good Environmental Status (GES) Action Points.
Jul 15, /15/10 07/15/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report.
HR-XML: Competencies Update Chuck Allen, Director, HR-XML Consortium
Scenario Writing Essential Offerings
Let’s go through Path Modification/Path Alteration process
Action points Who When WG GES 31 March March 2017
Smart Grid ad hoc Closing Report – January 2011
DG Environment, Unit D.2 Marine Environment and Water Industry
UPDATE on SVN & MANTIS Upgrade
Feedback from Meeting of the Working Group on Economic and Social Analysis 14th October 2014 MSCG November 2014, Brussels.
EFSA’s dedicated support for SMEs
ITU-R Liaison Group Report - Session #61 Opening Plenary

Unit 6: Course Summary.
IETF-104 (Prague) DHC WG Next steps
IEEE Wireless Coexistence TAG
IETF 87 DHC WG Berlin, Germany Thursday, 1 August, 2013
Compendium and Working Group on MHPSS.net
INITIATIVES OF REGIONAL LIBRARIES IN BULGARIA IN THE SPHERE OF SOCIAL AND CULTURAL INTEGRATION : EXAMPLES FROM PRACTICE S. Eftimova, E. Tsvetkova, P. Mukanova.
Presentation transcript:

OVAL and the SACM Information Model 6/29/2015

Status I-D submitted on 5/5/2015 Feedback solicited from SACM WG Official review done by Jerome Athias Other comments provided by Gunnar Engelbach and David Ries Additional, ongoing, discussion on these topics

Major Discussion Points Inclusion of other Standards/Efforts Scaling while using OVAL Complexity of OVAL Definitions Related: Question of decoupling Evaluation & Guidance Level of abstraction for platform-specific extensions API/Data collection/Collection methodology

Next Steps Continue discussion over the mailing list Update the OVAL and SACM Information Model I-D Determine path for offering appropriate models from OVAL to SACM Likely OVAL System Characteristics & OVAL Definitions models Both will require modification to effectively fulfill SACM needs