Stakeholders’ Analysis

Slides:



Advertisements
Similar presentations
Child Safeguarding Standards
Advertisements

Screen 1 of 24 Reporting Food Security Information Understanding the User’s Information Needs At the end of this lesson you will be able to: define the.
Health Systems and the Cycle of Health System Reform
Slide 1 Test Assurance – Ensuring Stakeholders get What They Want Paul Gerrard Gerrard Consulting PO Box 347 Maidenhead Berkshire SL6 2GU UK e:
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Getting Started Conservation Coaches Network New Coach Training.
Module 2 Stakeholder analysis. What’s in Module 2  Why do stakeholder analysis ?  Identifying the stakeholders  Assessing stakeholders importance and.
1 DG Enterprise & Industry European Commission Conference on Better Regulation: Practical Steps Forward Reykjavík 6 June 2006 OVERVIEW OF THE BETTER REGULATION.
Guidelines Recommandations. Role Ideal mediator for bridging between research findings and actual clinical practice Ideal tool for professionals, managers,
Leader Axis Rural Development Policy by Jean-Michel Courades AGRI-F3.
Applied Methodologies in PHI Session 5: Evaluation Kath Roberts (NOO/EMPHO)
OffShore Product Development Best Practices. Contents ●Introduction ●Hire Expert Remote Teams ●Language and Cultural Evaluation ●Use of The Right Tools.
CYPS – Foundation Degree How to carry out a swot analysis.
Child safe guarding Child protection in your organisation.
Requirement Elicitation Nisa’ul Hafidhoh Teknik Informatika
A Prevention Strategy for Lincolnshire Post-consultation 2010.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
ADVOCACY Presentation by Baiko Suleman Dass at “DE WATSON LEADERSHIP ACADEMY” Semester training for Union Leaders and Cultural groups Date: Venue:
Session 3 General RIA Training 6–8 July 2009 EuropeAid/125317/D/SER/TR
Evidence Based Practice In the Community Sector
Disaster and Emergency Planning
BSBWOR301 Organise personal work priorities and development
Gap Analysis Continuing the development of the strategy
Information Sharing for Integrated care A 5 Step Blueprint
Developing CBC project ideas
The Logical Framework Approach
Iraq NHDR III: Youth Project Components Report Implementation
RIA: Communication – building credibility
Introduction and Background
Building Coalitions for Change Information, Consultation and Public Participation in Policy-making Experience from OECD countries Directorate for Public.
Ivor Beazley, World Bank
LEARNING REPORT 2016 Disasters and Emergencies Preparedness Programme
SUPPORT TO PUBLIC FINANCE MANAGEMENT REFORM IN GEORGIA
Programme Board 6th Meeting May 2017 Craig Larlee
HEALTH IN POLICIES TRAINING
Advocacy and CampaiGning
Coordinated Entry Committee
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Risk Register I want to plan a project
Project Management Tools
World Vision Partnership Approach to Building Evidence
WETLAND MANAGEMENT PLANNING Stakeholder Analysis
Understanding what is the Phytosanitary Capacity Evaluation (PCE)
EDU827 : EDUCATIONAL LEADERSHIP
Evaluation tools.
Capturing the Views of the Beneficiaries Proposal: UNDAF Design Innovation Facility UNCT The Gambia.
Partnerships and networks
Introduction to the training
SRH & HIV Linkages Agenda
Faculty Development Dr Samira Rahat Afroze.
OECD - MAPS Methodology for Assessment of Procurement Systems - Assessment Tool Arun Kumar Kolsur Senior Procurement Specialist January 13, 2019.
Macmillan Cancer Support collaborates with local providers, commissioners, voluntary sector and charity sector and we endeavour to do this across Greater.
NACDEP Annual Conference, June 11, 2018
CATHCA National Conference 2018
Definition of Project and Project Cycle
Draft Methodology for impact analysis of ESS.VIP Projects
Specialized Staffing to Support PSE Implementation
Developing a shelter strategy
Chapter#8:Project Risk Management Planning
Plan your journey.
Your Health Matters: Growing Active, Healthy Communities Partners
7. EAFM cycle overview Essential EAFM Date • Place 1.
Overview of assessment approach
Getting Serious about Stakeholder Analysis
Chapter#8:Project Risk Management Planning
Project Manager, EA, the REC
UNFCCC Needs-based Finance (NBF) Project
Improving data on homelessness in New Zealand
Chapter 13: Project Stakeholder Management
22 May 2006 Ramada Plaza Hotel Wrexham
Presentation transcript:

Stakeholders’ Analysis Vanda Altarelli June 2016 Master in Human Development and Food Security

Who are the stakeholders? Stakeholders are the people who matter to a system (project, policy, issues, etc.) What is it? It is a systematic methodology that uses qualitative data to determine the interests and influence of different groups in relation to a specific project/policy reform, issue, etc.

What is its Purpose ? It helps the research team to define whom we try to involve in designing a multi-stakeholder process and in which way, and it allows the team to find out whose information needs must be considered. This method is useful at different moments: It can help you to identify which stakeholders to involve in (re-) designing a project or programme or policy, and to assess their interests and how these relate to the issue (project/programme/policy).

What is its Purpose … You may want to use it during a specific phase or for a specific component to analyse stakeholder relations, including cooperation and conflicts and considering external factors affecting stakeholders and their activities. It can assist you in making an appropriate selection of the stakeholders most central to the task/issue at hand. It can help to provide a foundation and strategy for participation throughout the project/programme/ policy reform, thereby making it easier for stakeholders to learn from each other.

What can it be used for? Stakeholder analysis should be carried out for any type of project/policy reform. Basic stakeholder analysis should precede design and should be consistently deepened as project/policy reform elements proceed and are finalized.

What does it tell us? Stakeholder analysis can be expanded into fuller political economy/power analysis that identifies affected groups and looks at: (i) their position vis-à-vis project/policy/issue; (ii) their influence on institutions at all level; (iii) the likelihood of their participation in coalitions to support change; (iv) strategies for overcoming opposition such as compensating losers or delaying implementation.

How to do it Clarify the main purpose of the SA and agree on the criteria for assessing the stakeholders. Then list which criteria you will use to prioritise whom to involve. The types of criteria for selecting stakeholders could be: "supposed to be benefiting from the project", "critical role in ensuring success", "legally required to participate", "have specific knowledge on processes", etc.

How to do it.. List all the people and organisations that might fit your criteria, e.g. key individuals from the target populations, local leaders and key people from implementing partners (NGOs, community organisations etc.), government staff , local administration, local consultants, local businesses and educational/research institutes. This list needs to be revisited several times as you design your intervention to ensure that all key groups and people are included and updated.

How to do it.. Then classify the stakeholders on the basis of the criteria identified. For this, you will need to make a stakeholder matrix with the stakeholders along one axis and the criteria along the other. Prioritise which stakeholders to involve.

How to do it.. Reach agreement on how best to involve people. This is done by asking the different people/groups themselves how they think they can be best involved. Remember that participation does not mean involving everybody in all decisions at all times. It means thinking carefully about how to ensure that different interests can best be represented in different phases and forums of the process.

Data/Information Required Stakeholder interests are seldom explicitly spelled out in existing sources. Various tools can be used to identify stakeholders, such as brainstorming, interviews with key informants or focus groups. Cross check the list by asking key people to look critically at the initial list of stakeholders you have produced. (ii) secondary material such as social science research, “gray literature”, etc.

Data/Information Required.. Analysis that is meant to predict the positions of key stakeholders in different reform scenarios is not a one-off piece of work and should be iterative and/or grow out of the findings of your analytical work. Ensuring a complete and updated picture may require that specialists carry out the work again after few months.

Tips on use Stakeholder analysis is an essential method to use in order to properly design whom to involve in which steps of the process. Such a selection must be done together with different people in order to lessen the risks of having a biased selection. This is a process that continually evolves and must be repeated throughout the life of a project/programme in order to be sure that (new) potentially important stakeholders are not missed.

Skills Required Sociological or anthropological training is helpful, as is a background in political science, and , preferably, mastery of the language or very skilled translators. Local knowledge, including contacts with local experts, is crucial. Those carrying out the analysis must also thoroughly understand the scope of the project/reform and the recent history in the sector.

Limitations Stakeholder analysis relies on perceptions and preferences. This places greater onus on careful selection of respondents and interpretation of data