Forum on Tracking Detector Mechanics - Bonn, May 2016

Slides:



Advertisements
Similar presentations
Advantages of the CO 2 refrigeration As a refrigerant CO 2 has excellent thermodynamic properties, in terms of good heat-transfer inside an evaporator.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
IBL cooling status Pixel week 15 October 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Claudio Bortolin, Piotr Gach, Artur Szlachcic, Olivier Crespo.
NA62 – GTK Cooling Station 1 Main characteristics Fluid: C 6 F 14 (fluorocarbon) Operating temperature: -30 °C ÷ -10°C Temperature precision: ±1 K Temperature.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
1 GL th IIF/IIR Gustav Lorentzen Conference on Natural Working Fluids Bart Verlaat National Institute for Subatomic Physics (NIKHEF) Amsterdam, The.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
IBL cooling thermal chock incident 15 October The IBL cooling team.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
60kW Thermosiphon control system
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
D. GiugniThermosiphon Review, Oct 1st 091 Risk assessment for the thermosiphon cooling test system D. Giugni Thermosiphon Review, Oct1 st 2009.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Krzysztof Śliwa 26 August, Krzysztof Śliwa 26 August, 2015  Tests done between 7th to 25th of August 2015  Circulation in by-pass over the manifold.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
James McIntyre VRF Training Manager V5 Key Components.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Demineralised water cooling system
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
IBBelle: Status & Plans
Summary of TS2 activities on CO2 vacuum insulated lines on YB0
CO2 ON-CALL SERVICE ORGANISATION
ATLAS ITk Baby-DEMO update
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Internship final presentation
Control Logic for ATLAS Thermosiphon chiller brine and water circuit
Detector Cooling Project WP2 CO2 activities status report
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
Tracker cooling loop “check out” draft for discussion
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Pixel upgrade CO2 cooling plants – 3D modelling
MAUVE CO2 cooling review
ATLAS Thermosiphon Electrical Distribution and Run Modes
Pixel CO2 Cooling Status
Recirculating CO2 System
CO2 Cooling IPNL Nick Lumb, 28/01/09.
ESS elliptical cryomodule
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
CO 2 CO2 COOLING FOR THE LHCB-VELO EXPERIMENT AT CERN Bart Verlaat
Presentation transcript:

Forum on Tracking Detector Mechanics - Bonn, May 2016 The CMS PIXEL Phase 1 CO2 cooling system: Commissioning and operation of a large scale CO2 system J. Daguin, P. Tropea, H. Postema, M. Ostrega, L. Zwalinski, B. Verlaat, P. Petagna 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 Summary System specifications System description System performances Conclusions 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

System specifications 2-PACL based system Operating temperature: -20 °C to +15 °C (original request) -23 °C to +15 °C (modified request) Cooling power: 2 x 7.5 kW CO2 quantities: 2 x 100 kg 2 independent cooling plants with capability of full system coverage in case of need Service pressure (safety valves setting): 110 bar Test pressure: 157 bar Operating pressures: 10 bar (-40 °C) – 57 bar (+20 °C) Max 75 bar in supply line when running warm with high DP (20 bar) Vacuum jacketed concentric transfer lines to ensure CO2 transport up to detector connection area 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

The CMS Pixel Phase 1 Upgrade CO2 cooling system UXC55 2 manifolds (X4 near balcony) Manifold to YB0 edge transfer lines YB0 edge to PP1 transfer lines PP1 to PP0 piping PIXEL detector USC55 2 cooling plants 2 accumulators 3 control racks Services (power, dry air, network) USC to UXC transfer lines Services between USC and UXC 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 System safety Construction following HSE (CERN safety unit) recommendations and safety standards (PED) 100% visual inspection + 10% X-Rays Standard for one PED class higher Safety file on EDMS: https://edms.cern.ch/ui/#!master/navigator/document?P:1996242359:1020213357:subDocs CO2 detection in USC close to storage vessels 4 detection heads in USC connected to fire brigade CO2 exhaust close to equipment Connected to the N2 exhaust of the magnet cryo in USC Routed to the air extraction in UXC 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 Cooling plants 2 identical cooling plants Designed, built and tested at CERN (EP-DT-FS workshop) Remote head LEWA LDE pump Up to 160 g/s of CO2 Cold head away from the engine Heat exchanger connected to R507 TK chiller circuit Condenses two-phase return and subcools liquid Two filters: 500 µm strainer at the pump suction 40 µm filter at the pump discharge 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 Accumulators 2 identical accumulators Designed, built and tested at HOEFNAGEL&MEIJN (NL) Delivered with the CE certification 140l capacity Heat exchanger on top of the vessel to condense CO2 vapor Lower the pressure in the system 5 x 1 kW heaters at the bottom of the vessel to vaporize liquid CO2 Rise the pressure in the system Back-up chiller installed to lower system pressure in case of need 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 Manifolds 2 identical manifolds Designed, built and tested at CERN (EP-DT-FS workshop) 8 loops with individual mass flowmeter, filter (140 µm) and regulation valve 15 kW dummy load 2 safety valves per loop 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Timeline 2014 2015 2016 Manifolds construction Manifolds installation in UXC Plants construction Accumulators at CERN Plants ans accumulators installation in USC First CO2 circulation Full perf tests First maintenance 24/7 operation 2014 2015 2016 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 Manifolds in UXC 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Plants and Accumulators in USC 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 System at CMS 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 Transfer lines Section 1: USC to UXC (2 x vacuum insulated concentric lines) Installed by CRIOTEC in Fall 2014 Section 2: Manifold to top and bottom of YB0 periphery (4 x 1 common vacuum jacket for 4 concentric lines) Installed by DEMACO in August/September 2014 Section 3: YB0 periphery to PP1 (4 x 4 vacuum jackets for 4 concentric lines) Installed by DEMACO in February/March 2014 1 2 3 1 1 2 3 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 CMS system P&I (BPix) 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 CMS Control system Standard CERN UNICOS control system Control layer: 1 PLC Schneider Premium located in USC SCADA Layer: 1 SIEMENS WinCC-OA project located in CCC External communications Interlocks sent to DSS (hardwire) Process data and cooling system status sent to CMS DCS (MODBUS) Publication of high level informations for CMS DCS (DIP) 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

CMS Control system architecture Direct MODBUS to DSS LHC Logging 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Cooling plant controls Manifold Accumulator Manifold CO2 Plant 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Manifold controls Bpix detector (in future) Supply line pneumatic valves (NO) Bypass line + dummy load Return line pneumatic valves (NO) 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Cooling plant regulation loops Accumulator pressure split range controller Back-pressure controller Superheating controller Pump speed controller Damper temperature controller 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Cooling plant operation 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 CMS System overview UXC55 cavern R507 BPIX PLANT FPIX PLANT FPIX ACCUMULATOR BPIX ACCUMULATOR Transfer lines FPIX MANIFOLD BPIX MANIFOLD 8 return 8 supply Sector +5 and -6 PP1 Sector +14 and -15 PP1 USC55 cavern 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Start-up procedure Start-up temperature depends on detector T (hardwired DSS signal) and user setpoint Start-up from room temperature to +15 °C circulation takes ≈ ½ h Another 40 min are needed to go down to -23 °C Pressurisation of the system 25 min 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Re-start times estimate after a stop Operation mode Cooling plant Detector Time estimate Observation Normal Warm 1/2h Need to liquify CO2 before the pump Cold 1h – 2h Need to rise pressure in accumulator up to detector temperature Few minutes CO2 conditions already fulfilled Back-up 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Performances in normal operation System in normal operation: Each plant serving its own manifold Two different temperature set points possible Minimum temperature down to -32 °C with 7 kW Cooling power up to 2 x 11 kW at -23 °C FPIX system 11 kW 7 kW -23 °C setpoint -28 °C setpoint -32 °C setpoint Manifold inlet temp Accumulator saturation temp Pump discharge temp Manifold outlet temp Manifold DL heater2 power Manifold DL heater1 power Pump suction temp Mass flow 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Performances in back-up operation System in Back-up operation: One plant serving both manifolds Only one common temperature set points possible In case of failure: Both system have to be switched OFF Restart in back-up is similar to restart in normal operation Switch-over takes several minutes Minimum temperature down to -27 °C with 2 x 7 kW Cooling power up to 2 x 9 kw at -23 °C Stop from normal operation BPIX system Re-start in back-up 9 kW Manifold inlet temp Accumulator saturation temp Pump discharge temp Manifold outlet temp Manifold DL heater1 power Pump suction temp Mass flow Manifold DL heater2 power FPIX system 9 kW -23 °C setpoint Manifold inlet temp Accumulator saturation temp Manifold outlet temp Pump discharge temp Manifold DL heater2 power Manifold DL heater1 power Pump suction temp Mass flow 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Go to warm interlock -23 °C +15 °C Cooling plant temperatures PP1 bypasses temperatures -23 °C 50 min +15 °C 4 hours 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Cooling plant performances - Summary Normal operation: Minimum -32 °C reached with 7 kW on each plant Maximum load of 11 kW on each plant reached at -23 °C Maximum load of 6.5 kW on each plant reached at +15 °C Back-up operation: Minimum -27 °C reached with 2 x 7.5 kW Maximum load of 2 x 9 kW reached at -23 °C 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Forum on Tracking Detector Mechanics - Bonn, May 2016 Conclusions System installed since almost one year System fully operational and tested Cooling plant performances fully satisfactory and above expectations Cooling power above specifications But system can also work with very low load !!! -23 °C reachable in all conditions Back-up operation functional 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016

Thank you for your attention… and to all the people involved! abdel l, andrea d’a, bart V, cedric l, Hans p, jerome n, lukasz z, maciej o, norbert F, paola T, paolo P, philippe l, robert b, steven p, and many others… 25.05.16 Forum on Tracking Detector Mechanics - Bonn, May 2016