Oversight Board Meeting October 3, 2017 Rob Michnoff

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
M. White – June 28, 2004 LCLS Requirements Meeting In a project, we live or die by the schedule. After we’re “baselined” it is our plan for what we will.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
ERHIC: an Efficient Multi-Pass ERL based on FFAG Return Arcs June 9, 2015Stephen Brooks, ERL On behalf of the eRHIC design team.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
Beam Commissioning Adam Bartnik.
High energy beam transport.
George Mahler, Steven Trabocchi, J. Tuozzolo, Stephen Brooks
CBETA Technical Review
Page Headline Beam Commissioning Adam Bartnik.
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
2011 Prioritization Update to Market Subcommittees
Complementary ISTC Projects #3888, 3889p
TBL, Status, Plans, Experiments
FFAG Magnets and Girders Meeting
TOPIC-8A- PROJECT TIME CONTROL
Cost, Schedule, & Risk.
Design Review FFAG Magnets & Girders
10/month is the present production rate 2 FTE + sporadic contributions
Industrialization of previous projects
Engineering Status.
FFAG Magnet and Girders
FRACTIONAL ARC TEST GIRDER DESIGN REVIEW
The Cornell High Brightness Injector
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
Project management Lecture 9
Academic Assessment: Data Day May 7, 2015.
Ciprian Plostinar Workshop on Testing and Commissioning
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
ENGINEERING MANAGEMENT (GE 404)
Extraction Michael Bevins May 17, 2007
Two-beam Test-stand Design and Construction Status
LCLS Undulator System Status and Schedule
Electron Beam Systems ETC and Methodology
Accelerator Installation Schedule
Presentation transcript:

Oversight Board Meeting October 3, 2017 Rob Michnoff BNL Technical Update Oversight Board Meeting October 3, 2017 Rob Michnoff

CBETA Machine Layout Injector cryomodule Electron source Dump Main linac cryomodule Merger IN Splitter B DI Diagnostic line Splitter A RX SX FFAG arc B FFAG arc A FB FA FFAG Transition B FFAG Transition A TB ZB FFAG straight ZA TA

Recent progress FFAG Halbach Permanent Material ordered Unfortunately cost is significantly higher than anticipated due to dramatic price increase of magnetic material Bids received 9/25 for Assembly of Halbach magnets 6 received, pricing is in ballpark of estimate Statement of work for corrector coils is complete and bid preparation is underway Drawings for FFAG girder plates is in progress

Milestone 5 – Test production FFAG magnets Plan for completing by December 31, 2017 Assumption: the intention of this milestone is to test 1 production Halbach magnet BNL will assemble the half length BDH Halbach magnet that is required for the fractional arc test and this will be called the 1st production magnet Major challenge: permanent magnet material is not expected to be received until mid-December 2017, which leaves very little time to assemble and test the magnet

Issues / Concerns Satisfying milestone 5 by the 12/31/2017 deadline will be challenging Project schedule still needs work in order to align sub-milestone dates with contract milestone dates Many finish dates in the schedule are later than what is actually required FFAG Halbach magnet assembly schedule spans 11 months, bringing delivery of the last batch to October 2018 assuming that the order is placed by late October. This is about 3-4 months later than hoped Any vendor delays will be problematic Alternatives need to be considered

Issues / Concerns The complete machine needs to be fully constructed by end of December 2018 in order to be prepared for one-pass beam tests beginning March 1, 2019. Completing all of the required work on schedule will be very challenging Timely (early) delivery of Halbach magnets and corrector magnets is critical 2 Halbach magnets need to be measured and tuned per day for a period spanning about 6 months (215 magnets total) Need to determine how to make this happen One girder plate assembly needs to be completed each week for a period spanning about 6 months (24 girders)